ML081350633
| ML081350633 | |
| Person / Time | |
|---|---|
| Site: | Boiling Water Reactor Owners Group |
| Issue date: | 05/15/2008 |
| From: | Michelle Honcharik NRC/NRR/ADRO/DPR/SPB |
| To: | Rosenberg S NRC/NRR/ADRO/DPR/SPB |
| Honcharik M, NRR/DPR/PSPBPM, 415-1774 | |
| References | |
| NEDO-33148, TAC MD2917 | |
| Download: ML081350633 (6) | |
Text
May 15, 2008 MEMORANDUM TO: Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM:
Michelle C. Honcharik, Project Manager /RA/
Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH BOILING WATER REACTORS OWNERS GROUP (BWROG) (TAC NO. MD2917)
DATE & TIME:
Thursday, May 29, 2008 1:00 p.m. - 5:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission Two White Flint North 11555 Rockville Pike, Room T-2B5 Rockville, Maryland PURPOSE:
Meeting with BWROG to discuss proposed limitations and conditions for approval of Topical Report NEDO-33148, "Separation of Loss of Offsite Power from Large Break LOCA." The proposed limitations and conditions were provided to the BWROG in letter dated March 24, 2008 (Agencywide document access and management system Accession No. ML080230696).
CATEGORY 2*:
This is a Category 2 Meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC BWROG G. Wilson F. Emerson M. Rubin R. Bunt G. Cranston S. Visweswaran J. McHale T. Browning A. Mendiola M. Honcharik V. Goel S. Laur S. Dinsmore R. Wolfgang P. Yarksy Project No. 691
Enclosure:
Agenda cc w/encl: See next page MEETING CONTACT: Michelle Honcharik, NRR 301-415-1774 mch3@nrc.gov
- Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings,"
(67 FR 36920), May 28, 2002
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC BWROG G. Wilson F. Emerson M. Rubin R. Bunt G. Cranston S. Visweswaran J. McHale T. Browning A. Mendiola M. Honcharik V. Goel S. Laur S. Dinsmore R. Wolfgang P. Yarksy Project No. 691
Enclosure:
Agenda cc w/encl: See next page MEETING CONTACT: Michelle Honcharik, NRR 301-415-1774 mch3@nrc.gov
- Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings,"
(67 FR 36920), May 28, 2002 ADAMS ACCESSION NO.: ML081350633 NRR-106 OFFICE PSPB/PM PSPB/BC NAME MHoncharik SRosenberg DATE 5/14/08 5/15/08 OFFICIAL RECORD COPY
DISTRIBUTION FOR FORTHCOMING MEETING WITH THE BOILING WATER REACTOR OWNERS GROUP Date: May 15, 2008 PUBLIC PSPB Reading File RidsNrrAdro RidsNrrDpr RidsNrrDprPspb RidsNrrPMMHoncharik RidsNrrLADBaxley RidsOpaMail RidsNrrDra RidsNrrDss RidsNrrDe RidsNrrDci George Wilson Mark Rubin Gregory Cranston John (Jack) McHale Anthony Mendiola Vijay Goel Steven Laur Stephen Dinsmore Robert Wolfgang Peter Yarsky Benjamin Parks PMNS RJasinski RidsOgcMailCenter RidsAcrsAcnwMailCenter Receptionist (OWFN and TWFN)
ENCLOSURE AGENDA MEETING WITH THE BOILING WATER REACTOR OWNERS' GROUP (BWROG)
MAY 29, 2008 1:00 p.m. - 1:05 a.m.
Introduction and opening remarks 1:05 a.m. - 2:30 p.m.
Discussion of Probabilistic Risk Assessment Licensing Branch input 2:30 p.m. - 2:40 p.m.
Break 2:40 p.m. - 3:30 p.m.
Discussion of Reactor Systems Branch input 3:30 p.m. - 4:30 p.m.
Discussion of Electrical Engineering Branch input 4:30 p.m. - 4:45 p.m.
Public comment 4:45 p.m. - 5:00 p.m.
Next steps and action item review
BWR Owners= Group Project No. 691 Mr. Doug Coleman Vice Chair, BWR Owners= Group Energy Northwest Columbia Generating Station Mail Drop PE20 P.O. Box 968 Richland, WA 99352-0968 DWCOLEMAN@energy-northwest.com Mr. Richard Libra Executive Vice Chair, BWR Owners= Group Exelon Generation Co, LLC 200 Exelon Way Mail Code KSA 2-N Kennett Square, PA 19348 Rick.libra@exeloncorp.com Mr. Richard Anderson BWROG, Executive Chair FPL Energy (DAEC)
Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 richard_l_anderson@fpl.com Mr. James F. Klapproth GE-Hitachi Nuclear Energy M/C A50 3901 Castle Hayne Road Wilmington, NC 28401 james.klapproth@ge.com Mr. Joseph E. Conen Regulatory Response Group Chair BWR Owners= Group DTE Energy-Fermi 2 200 TAC 6400 N. Dixie Highway Newport, MI 48166 conenj@dteenergy.com Mr. J. A. Gray, Jr.
Regulatory Response Group Vice-Chair BWR Owners= Group Entergy Nuclear Northeast 440 Hamilton Avenue Mail Stop 12C White Plains, NY 10601-5029 JGray4@entergy.com Mr. Ken A. McCall, Program Manager GE Energy M/C F12 3901 Castle Hayne Road Wilmington, NC 28401 kenneth.mccall@ge.com Mr. Tim E. Abney GE Energy M/C A-16 3901 Castle Hayne Road Wilmington, NC 28401 tim.abney@ge.com Oscar Limpias Entergy Nuclear Northeast 1340 Echelon Parkway.
Jackson, MS 39213-8202 olimpia@entergy.com Joe Donahue Progress Energy Inc.
410 S. Wilmington St.
PEB 6A Raleigh, NC 27601-1849 joe.w.donahue@pgnmail.com Paul J. Davison Hope Creek Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 paul.davison@pseg.com Dennis Madison, Hatch Vice President Southern Nuclear Operating Co.
11028 Hatch Parkway North Baxley, GA 31515-2010 drmadiso@southernco.com Frederick Emerson BWROG, Project Manager Frederick.emerson@ge.com Mr. Randy C. Bunt, Chair BWR Owners= Group Southern Nuclear Operating Company 40 Inverness Center Parkway/Bin B057 Birmingham, AL 35242 RCBUNT@southernco.com 3/18/08