Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Response to Extension Request
ML081220197
Person / Time
Site: Seabrook 
Issue date: 05/12/2008
From: Geoffrey Miller
NRC/NRR/ADRO/DORL/LPLI-2
To: O'Keefe M, St.Pierre G
Florida Power & Light Co
Miller G, NRR/DORL, 415-2481
References
GL-08-001, TAC MD7878
Download: ML081220197 (5)


Text

May 12, 2008 Mr. Gene F. St. Pierre, Site Vice President c/o Michael OKeefe Seabrook Station P.O. Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - GENERIC LETTER 2008-01, MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS, RESPONSE TO EXTENSION REQUEST (TAC NO. MD7878)

Dear Mr. St. Pierre:

Generic Letter (GL) 2008-01, Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal, And Containment Spray Systems, requests licensees to submit information to demonstrate that the emergency core cooling, decay heat removal, and containment spray systems are in compliance with the applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance. The GL 2008-01 states that each licensee is requested to submit a written response to the Nuclear Regulatory Commission (NRC) within 9 months to provide requested information and that if a licensee cannot meet the requested 9-month response date, a 3-month written response is required that describes the alternative course of action that it proposes to take, including the basis for the acceptability of the proposed alternative course of action.

By "L-2008-076, Extension Request Regarding the Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and [[system" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Systems|letter dated April 9, 2008]], (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081050251) you stated, on behalf of the licensee, FPL Energy Seabrook, LLC (FPLE) that you had reached agreement in a telephone call on April 3, 2008, with the Jared Wermiel, Deputy Director, Division of Safety Systems, to extend the date for the 3-month response to May 11, 2008. You stated that your request for extension was to ensure a sound understanding of the alternative courses of actions, including those associated with performance of detailed piping walk downs.

This letter is to formally acknowledge the requested extension to the due date for submitting the 3-month response to GL 2008-01 and to document the telephone call with the NRC staff.

Specifically, on April 3, 2008, you requested an extension for providing the above 3-month response for FPLE from April 11, 2008, to on or before May 11, 2008. The NRC staff finds that your justification to extend the due date for the 3-month written response to

G. St. Pierre GL 2008-01 is acceptable, and your extension request is granted. This letter does not alter or change the required 9-month response date of October 11, 2008. The NRC staff will evaluate your alternate plans (3-month response) for responding to GL 2008-01 after receipt and will respond appropriately. If you have any questions regarding this issue, please feel free to contact, G. Edward Miller at (301) 415-2481.

Sincerely,

/ra/

G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: See next page

ML081220197 OFFICE LPLI-2/PM LPLI-2/LA DSS/DD PGCB/BC LPLI-2/BC NAME GEMiller ABaxter (SLittle for)

JWermeil MMurphy HChernoff DATE 5/9/08 5/12/08 5/2/08 5/2/08 5/12/08

Seabrook Station, Unit No. 1 cc:

Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Peter Brann Assistant Attorney General State House, Station #6 Augusta, ME 04333 Resident Inspector U.S. Nuclear Regulatory Commission Seabrook Nuclear Power Station P.O. Box 1149 Seabrook, NH 03874 Town of Exeter 10 Front Street Exeter, NH 03823 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Attorney General One Ashburton Place, 20th Floor Boston, MA 02108 Board of Selectmen Town of Amesbury Town Hall Amesbury, MA 01913 Mr. Robert Poole Federal Emergency Management Agency Region I 99 High Street, 6th Floor Boston, MA 02110 Mr. Tom Crimmins Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019 John Giarrusso Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 Ms. Kelly Ayotte, Attorney General Mr. Orvil Fitch, Deputy Attorney General 33 Capitol Street Concord, NH 03301 Mr. Christopher M. Pope, Director Homeland Security & Emergency Mgmt.

New Hampshire Department of Safety Bureau of Emergency Management 33 Hazen Drive Concord, NH 03301 Mr. M. S. Ross, Managing Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Technical Services Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 James M. Peschel Regulatory Programs Manager FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874 Ms. Marjan Mashhadi Senior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW Suite 220 Washington, DC 20004

Seabrook Station, Unit No. 1 cc:

Mr. Mark E. Warner Vice President, Nuclear Operations, North Region (Seabrook & Duane Arnold Plants)

Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President, Nuclear Technical Services Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408 Mr. Joseph Roy Director of Operations Massachusetts Municipal Wholesale Electric Company Moody Street Ludlow, MA 01056 Mr. Don E. Grissette Vice President, Nuclear Training and Performance Improvement Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 3340 Mr. Michael W. Kiley Plant General Manager FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874