MONTHYEARPNO-III-15-004, Byron Unit 1 Automatic Shutdown After Falling Ice Caused Main Power Transformer Short Circuit2015-03-10010 March 2015 PNO-III-15-004 - Byron Unit 1 Automatic Shutdown After Falling Ice Caused Main Power Transformer Short Circuit PNO-III-12-003, Byron Station Unit 1 Unplanned Shutdown for Greater than 72 Hours2012-03-14014 March 2012 PNO-III-12-003 - Byron Station Unit 1 Unplanned Shutdown for Greater than 72 Hours PNO-III-12-002, A, (Update) Byron Unit 1 Loss of Offsite Power and Declaration of a Notice of Unusual Event2012-03-0202 March 2012 PNO-III-12-002A, (Update) Byron Unit 1 Loss of Offsite Power and Declaration of a Notice of Unusual Event ML12060A3862012-02-29029 February 2012 PNO-III-12-002 - Byron Unit 1 Loss of Offsite Power and Declaration of a Notice of Unusual Event PNO-III-12-001, Byron Unit 2 Restarts After a Loss of Offsite Power and Declaring a Notice of Unusual Event2012-02-0707 February 2012 PNO-III-12-001, Byron Unit 2 Restarts After a Loss of Offsite Power and Declaring a Notice of Unusual Event PNO-III-10-015, Byron, Initiation of Reactive Inspection in Response to a Failure of the Mechanism That Cools Water Surrounding a Canister Containing Spent Fuel2010-08-31031 August 2010 PNO-III-10-015: Byron, Initiation of Reactive Inspection in Response to a Failure of the Mechanism That Cools Water Surrounding a Canister Containing Spent Fuel PNO-III-08-002, A - Byron, Unit 2, Update Notice of Unusual Event Due to Loss of Offsite Power to Vital Busses2008-03-28028 March 2008 PNO-III-08-002A - Byron, Unit 2, Update Notice of Unusual Event Due to Loss of Offsite Power to Vital Busses ML0808602592008-03-26026 March 2008 PNO-III-08-002: Byron Unit 2 Notice of Unusual Event Due to Loss of Offsite Power to Vital Busses PNO-III-07-014, Byron Unit 1, Nitrogen Leak During Maintenance2007-11-27027 November 2007 PNO-III-07-014: Byron Unit 1, Nitrogen Leak During Maintenance PNO-III-07-012, A - NRC Inspection Team - Update to Dual Unit Shutdown2007-10-31031 October 2007 PNO-III-07-012A - NRC Inspection Team - Update to Dual Unit Shutdown ML0729601092007-10-23023 October 2007 PNO-III-07-012 - Both Units at Byron Shut Down Due to a Lead in Pipe PNO-III-06-004, B: Byron, Resumption of Effluent Discharges2006-04-20020 April 2006 PNO-III-06-004B: Byron, Resumption of Effluent Discharges ML0609006692006-03-31031 March 2006 PNO-III-06-004A Tritium Leakage (Update) PNO-III-06-006, Byron: Unusual Event Declared Due to a Fire within the Plant Protected Area2006-02-24024 February 2006 PNO-III-06-006, Byron: Unusual Event Declared Due to a Fire within the Plant Protected Area ML0604602112006-02-15015 February 2006 PNO-III-06-004, Tritium Leakage ML0535503512005-12-21021 December 2005 PNO-RIII-05-017- Byron Potential Gunshot Injury to a Site Employee 2015-03-10
[Table view] |
Text
March 26, 2008 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE - PNO-III-08-002 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region III staff on this date. Facility Licensee Emergency Classification Byron Unit 2 _X_ Notification of Unusual Event Exelon Generation LLC ___ Alert Byron, IL ___ Site Area Emergency Docket: 50-455 ___ General Emergency License: NPF-66 ___ Not Applicable
SUBJECT:
BYRON UNIT 2 NOTICE OF UNUSUAL EVENT DUE TO LOSS OF OFFSITE POWER TO VITAL BUSSES DESCRIPTION:
At 6:34 p.m. CDT on March 25, 2008, one of the Byron Unit 2 electrical transformers failed due to a Phase C overcurrent condition causing a loss of power to both Unit 2 vital 4160 VAC busses. Unit 2 remained essentially at full power during the electrical transient. Unit 1 was shutdown for a refueling outage and was not affected by the electrical transient. Both Unit 2 Emergency Diesel Generators (EDGs) started and supplied the 4160 VAC vital busses as designed.
The licensee declared a Notice of Unusual Event (NOUE) at 6:49 p.m. CDT per Emergency Action Level MU1, "Loss of all offsite power to essential busses for greater than 15 minutes."
By 8:05 p.m., the licensee cross-tied the Unit 2 4160 VAC vital busses with the Unit 1 vital busses and secured the Unit 2 EDGs in accordance with existing procedures. The licensee continues its investigation of the root and contributing causes of the loss of the electrical transformer on Unit 2. The Byron Senior Resident responded to this event and was onsite shortly following the licensee's declaration of the NOUE. The NRC entered Monitoring Mode at 7:40 p.m. on March 25, 2008, and staffed the Regional Incident Response Center (IRC). During this event, the resident inspectors continuously monitored the licensee's activities surrounding this event from the plant control room, and the region continuously manned the IRC. The State of Illinois was informed. The information in this preliminary notification has been reviewed by the licensee. This information is current as of 5:00 a.m. CDT on March 26, 2008. CONTACT: Richard Skokowski (630) 829-9620