ML060900669

From kanterella
Jump to navigation Jump to search
PNO-III-06-004A Tritium Leakage (Update)
ML060900669
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/31/2006
From: Bartlett B E, Orth S K, Skokowski R A
NRC/RGN-III
To:
References
FOIA/PA-2010-0209 PNO-III-06-004A
Download: ML060900669 (2)


Text

PRELIMINARY NOTIFICATION- REGION IIIMarch 31, 2006PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE - PNO-III 004AThis preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region III staff on this date.FacilityLicensee Emergency ClassificationByron Generation Station Unit 1 and 2 Notification of Unusual EventExelon Generation Co. AlertByron, Illinois Site Area EmergencyDocket: 50-454 and 50-455 General EmergencyLicense: NPF-37 and NPF-66 X Not Applicable

SUBJECT:

TRITIUM LEAKAGE (Update)DESCRIPTION:

On March 31, 2006, Exelon notified the NRC Region III (Chicago) that its monitoring program atthe Byron Nuclear Generating Station has identified slightly elevated concentrations of tritium ingroundwater on company property close to the Byron circulating water blowdown piping.Based on earlier sample results taken from within the six vacuum breaker vaults, the licenseeinstalled ground water monitoring wells near the six vacuum breaker vaults along the station's discharge pipe to allow further sampling for tritium. Wells beside four of the six vaults showed no detectable levels of tritium. Test wells beside the other two showed low levels of tritium.

One showed a concentration of about 3800 picocuries per liter, the other about 450 picocuriesper liter. Exelon has indicated to the NRC that it plans to continue installing monitoring wells and testingto fully characterize the extent of contamination and will also inspect the pipeline for leaks.Background Information:

On February 10, 2006, Exelon informed the resident inspectors and Region III that elevatedlevels of tritium in water had been identified in several vacuum breaker vaults located along the Byron discharge piping. This piping is on plant property. The piping is approximately 2.5 miles long normally carrying non-radioactive circulating water to the Rock River. The discharge pipe is also used for planned liquid radioactive effluent releases with effluent mixing with the discharge water.The licensee suspended releases of radioactive effluents in February 2006 and is currentlystoring liquid effluents in existing plant equipments at the Byron site.

The State of Illinois has been informed of this updated information. NRC Region III pers onnelhave been following the licensee's activities and performing split sampling and / or independent sampling and analyses. Additional oversight activities will continue. The information in thispreliminary notification has been reviewed with licensee management. This information is current as of 2:30 p.m. Central Time on March 31, 2006.CONTACTS:Bruce BartlettRick SkokowskiSteven Orth 815-234-5451630-829-9620630-829-9827