Technical Specifications to Amendment 287, License DPR-70, Steam Generator Feedwater Pump Trip, Feedwater Isolation Valve Response Time Testing and Containment Cooling System
ML080220414
Person / Time
Site: Salem  PSEG icon.png
Issue date: 02/27/2008
From:
NRC/NRR/ADRO/DORL/LPLI-2
To:
Ennis R, NRR/DORL, 415-1420
Shared Package
ml080220398 List:
References
TAC MD4843, TAC MD4844
Download: ML080220414 (2)


Text

(1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at a steady state reactor core power level not in excess of 3459 megawatts (one hundred percent of rated core power).

(2) Technical Specifications The Technical Specifications contained in Appendices A and. B, as revised through Amendment No. 287, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

(3) Deleted Per Amendment 22, 11-20-79 (4) Less than Four Loop Operation PSEG Nuclear LLC shall not operate the reactor at power levels above P-7 (as defined in Table 3.3-1 of Specification 3.3.1.1 of Appendix A to this license) with less than four (4) reactor coolant loops in operation until safety analyses for less than four loop operation have been submitted by the licensees and approval for less than four loop operation at power levels above P-7 has been granted by the Commission by Amendment of this license.

(5) PSEG Nuclear LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report, and as approved in the NRC Safety Evaluation Report dated November 20, 1979, and in its supplements, subject to the following provision:

PSEG Nuclear LLC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain-safe shutdown in the event of a fire.

Amendment No. 287

CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

a. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:
1. Verifying the water level in each service water accumulator vessel is greater than or equal to 226 inches and less than or equal to 252 inches.
2. Verifying the temperature in each service water accumulator vessel is greater than or equal to 55OF and less than or equal to 95°F.
3. Verifying the nitrogen cover pressure in each service water accumulator vessel is greater than or equal to 135 psig and less than or equal to 160 psig.
b. At least once per 31 days by:
1. Starting (unless already operating) each fan from the control room in low speed.
2. Verifying that each fan operates for at least 15 minutes in low speed.
3. Verifying a cooling water flow rate of greater than or equal to 1300 gpm to each cooler.
c. At least once per 18 months by verifying that on a safety injection test signal:
1. Each fan starts automatically in low speed.

2.. The automatic valves and dampers actuate to their correct positions and that the cooling water flow rate to each cooler is greater than or equal to 1300 gpm.

d. At least once per 18 months by verifying that on a loss of offsite power test signal, each service water accumulator vessel discharge valve response time is within limits.

SALEM - UNIT 1 3/4 6-11a Amendment No. 287