January 29, 2008 Robert J. Duncan II, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165
SUBJECT:
SHEARON HARRIS NUCLEAR PLANT, UNIT NO. 1 - CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-027 (TAC NO. MD4155)
Dear Mr. Duncan:
On March 22, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-027 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070780413) regarding dissimilar metal welds in the pressurizer at Shearon Harris Nuclear Power Plant (HNP), Unit No. 1. This letter acknowledges receipt of the HNP letter dated November 30, 2007 (ADAMS Accession No. ML080110506) informing the NRC of actions taken in response to this CAL.
In the letter, HNP stated that during the recently completed refueling outage 14 (RFO14), HNP installed and inspected the required full structural weld overlays on the subject pressurizer Alloy 82/182 butt welds. A stress analysis summary, demonstrating that the pressurizer nozzles will perform their intended design functions with the weld overlays, was submitted on October 19, 2007 (ADAMS Accession No. ML072990086). The final ultrasonic examination of the weld overlays, completed on October 13, 2007 (ADAMS Accession No. ML073030491),
found no indications requiring disposition or repairs to the weld overlay material or base metal.
Based on HNPs letters, the NRC has determined that all the commitments listed in the CAL and supporting commitment letter (ADAMS Accession No. ML070650468) have been met. No further response is required regarding CAL No. NRR-07-027, and the CAL is now considered closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. This action closes TAC No. MD4155.
Thank you for informing the NRC of the actions documented in the HNP letters. These actions may be examined during a future NRC inspection of the HNP facility.
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available on the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. Eastern Standard Time, Monday through Friday (except Federal holidays).
In accordance with Title 10 of the Code of Federal Regulations, Section 2.390, and the NRC's "Rules of Practice," a copy of this letter and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely, Formatted: Condensed by 1 pt Formatted: Condensed by 1.2 pt Formatted: Condensed by 1 pt Formatted: Condensed by 1 pt Formatted: Condensed by 1 pt Formatted: Condensed by 1 pt Formatted: Condensed by 1 pt Formatted: Condensed by 1 pt Formatted: Condensed by 1 pt Deleted: ¶ Deleted: ¶
¶
¶
¶ Deleted:
Inserted:
Deleted: ¶
R. Duncan
/RA/
Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 cc: See next page Deleted: -
Formatted: Font: Bold Formatted: Condensed by 1 pt
ML08170541 NRR-106 OFFICE DCI/CPNB DCI/CPNB LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME TLupold TChan MVaaler RSola TBoyce DATE 01/23/08 01/23/08 01/23/08 01/18/08 01/23/08 OFFICE DCI/D DRP/D RII DORL/D NAME MEvans RHussen for JShea by email CHaney DATE 01/24/08 01/25/08 01/29/08
Mr. Robert J. Duncan II Shearon Harris Nuclear Power Plant, Carolina Power & Light Company Unit No. 1 cc:
Mr. Kelvin Henderson Plant General Manager Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc.
P. O. Box 165, Mail Zone 3 New Hill, North Carolina 27562-0165 Mr. Chris L. Burton Director of Site Operations Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc.
Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. David H. Corlett, Supervisor Licensing/Regulatory Programs Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc.
P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 Mr. Thomas J. Natale, Manager Support Services Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc.
P. O. Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Resident Inspector / Harris NPS c/o U. S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Mr. J. Paul Fulford Manager, Performance Evaluation and Regulatory Affairs PEB 5 Progress Energy Carolinas, Inc.
Post Office Box 1551 Raleigh, North Carolina 27602-1551 David T. Conley Associate General Counsel II -
Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Chairman of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 Ms. Beverly Hall, Section Chief Division of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721 Mr. Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Mr. Tony Gurley, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, North Carolina 27602 Mr. Carl Thompson, Chair Board of County Commissioners of Chatham County P. O. Box 87 Pittsboro, North Carolina 27312 Mr. John H. ONeill, Jr.
Pillsbury Winthrop Shaw Pittman, LLP 2300 N Street NW.
Washington, DC 20037-1128 Formatted: Top: 0.8", Bottom:
0.5", Header distance from edge:
0.2", Footer distance from edge:
0.2" Deleted: Section Break (Continuous)
¶