January 30, 2008 Mr. William R. Campbell, Jr.
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
SEQUOYAH NUCLEAR PLANT, UNIT 1 - CLOSURE OF CONFIRMATORY ACTION LETTER NO. NRR-07-026 (TAC NO. MD4184)
Dear Mr. Campbell:
On March 29, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-026 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070800017) regarding dissimilar metal welds in the pressurizer at Sequoyah Nuclear Plant (SQN), Unit 1. This letter acknowledges receipt of your letter dated December 26, 2007 (ADAMS Accession No. ML080110108) informing the NRC of actions taken in response to this CAL.
In your letter, you stated that Tennessee Valley Authority has completed mitigation of the Alloy 600 pressurizer nozzle-to-pipe welds for SQN Unit 1 and submitted results of the examinations by letter dated October 26, 2007 (ADAMS Accession No. ML073040011). The final weld overlay ultrasonic examination was completed on October 21 during the SQN Unit 1 Cycle 15 refueling outage.
Based on your letters, the NRC finds that all the commitments listed in the CAL and supporting commitment letter (ADAMS Accession No. ML070610093) have been met for SQN Unit 1. No further response is required regarding the CAL. We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. This action closes TAC No. MD4184.
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely,
/RA/
Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-327 cc: See next page
ML080100013 NRR-106 OFFICE DCI/CPNB DCI/CPNB LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME TLupold TChan BMoroney RSola TBoyce DATE 01/15/08 01/16/08 01/15/08 01/14/08 01/18/08 OFFICE DCI/D DRP/D RII DORL/D NAME MEvans HChristensen for JShea by email CHaney DATE 01/17/08 01/30/08 01/30/08
William R. Campbell, Jr.
Tennessee Valley Authority cc Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. James R. Douet Senior Vice President Nuclear Support Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. H. Rick Rogers Vice President Nuclear Engineering & Technical Services Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Timothy P. Cleary, Site Vice President Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, TN 37902 Mr. John C. Fornicola, Manager Nuclear Assurance Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 SEQUOYAH NUCLEAR PLANT Ms. Beth A. Wetzel, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. James D. Smith, Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 Mr. Christopher R. Church, Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 Senior Resident Inspector Sequoyah Nuclear Plant U.S. Nuclear Regulatory Commission 2600 Igou Ferry Road Soddy Daisy, TN 37379 Mr. Lawrence E. Nanney, Director TN Dept. of Environment & Conservation Division of Radiological Health Third Floor, L and C Annex 401 Church Street Nashville, TN 37243-1532 County Mayor Hamilton County Courthouse Chattanooga, TN 37402-2801 Mr. Larry E. Nicholson, General Manager Performance Improvement Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Ms. Ann P. Harris 341 Swing Loop Road Rockwood, TN 37854