Letter Sequence Request |
|---|
|
|
MONTHYEAR2CAN040703, License Amendment Request to Allow the Use of Optimized ZIRLO Fuel Rod Cladding2007-04-24024 April 2007 License Amendment Request to Allow the Use of Optimized ZIRLO Fuel Rod Cladding Project stage: Request ML0722006082007-07-23023 July 2007 7/23/07 Draft Request for Additional Information from A. Wang to Entergy Operations, Inc. Re License Amendment Request to Delete Fuel Handling Area Ventilation System Project stage: Draft RAI ML0722005902007-07-23023 July 2007 7/23/07 E-mail Enclosing Draft Request for Additional Information from A. Wang to Entergy Operations, Inc. Re License Amendment Request to Delete Fuel Handling Area Ventilation System Project stage: Draft RAI ML0722901082007-08-0202 August 2007 Supplement to Amendment Request to Delete the Fuel Handling Area Ventilation System and Associated Filter Testing Program Requirements Project stage: Supplement ML0800804862008-01-0808 January 2008 1/8/08 E-Mail Attachment from D. Bice, Entergy Operations, Inc. to A. Wang, NRR/DORL/LP4, Revised Technical Specification Page 6-15 (Clean Copy in Adobe) for ANO, Unit 2, License Amendment Request Re Fuel Handling Ventilation System Project stage: Request ML0800804842008-01-0808 January 2008 1/8/08 E-Mail Attachment from D. Bice, Entergy Operations, Inc. to A. Wang, NRR/DORL/LP4, Revised Technical Specification Page 6-15 (Clean Copy in Word) for ANO, Unit 2, License Amendment Request Re Fuel Handling Ventilation System Project stage: Request ML0800804822008-01-0808 January 2008 1/8/08 E-Mail Attachment from D. Bice, Entergy Operations, Inc. to A. Wang, NRR/DORL/LP4, Revised Technical Specification Page 6-15 (Markup Copy in Word) for ANO, Unit 2, License Amendment Request Re Fuel Handling Ventilation System Project stage: Other ML0800804792008-01-0808 January 2008 1/8/08 E-Mail from D. Bice, Entergy Operations, Inc. to A. Wang, NRR/DORL/LP4, Revised Technical Specification Page 6-15 (Markup & Clean Copy) for ANO, Unit 2, License Amendment Request Re Fuel Handling Ventilation System Project stage: Request ML0733300062008-02-0404 February 2008 Technical Specs, Amendment Nos. 231 & 274, Relocate Fuel Handling Ventilation System & Associated Ventilation Filter Testing Requirements to Licensee-Controlled Technical Requirements Manuals Project stage: Other ML0733300052008-02-0404 February 2008 Issuance of Amendment Nos. 231 and 274, Relocate Fuel Handling Ventilation System and Associated Ventilation Filter Testing Requirements to Licensee-Controlled Technical Requirements Manuals Project stage: Approval 2007-08-02
[Table View] |
Text
ARKANSAS - UNIT 2 6-15 Amendment No. 255, ADMINISTRATIVE CONTROLS 6.5.11 Ventilation Filter Testing Program (VFTP)
A program shall be established to implement the following required testing of Engineered Safeguards (ES) ventilation systems filters at the frequencies specified in Regulatory Guide 1.52, Revision 2. The VFTP is applicable to the Control Room Emergency Ventilation System (CREVS).
- a.
Demonstrate that an inplace cold DOP test of the high efficiency particulate (HEPA) filters shows 99.95% DOP removal when tested in accordance with Regulatory Guide 1.52, Revision 2, at the system design flowrate of 2000 cfm +/- 10%.
- b.
Demonstrate that an inplace halogenated hydrocarbon test of the charcoal adsorbers shows 99.95% halogenated hydrocarbon removal when tested in accordance with Regulatory Guide 1.52, Revision 2, at the system design flow rate of 2000 cfm +/- 10%.
- c.
Demonstrate that a laboratory test of a sample of the charcoal adsorber meets the laboratory testing criteria of ASTM D3803-1989 when tested at 30 °C and 95% relative humidity for a methyl iodide penetration of:
- 1.
2.5% for 2 inch charcoal adsorber beds, and
- 2.
0.5% for 4 inch charcoal adsorber beds, when obtained as described in Regulatory Guide 1.52, Revision 2.
- d.
Demonstrate that the pressure drop across the combined HEPA filters, other filters in the system, and charcoal adsorbers is < 6 inches of water when tested at the following system design flowrate of 2000 cfm +/- 10%.
The provision of SR 4.0.2 and SR 4.0.3 are applicable to the VFTP test frequencies.