ML073240761

From kanterella
Jump to navigation Jump to search
Water Use of Vogtle Groundwater Use Report
ML073240761
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/13/2000
From:
State of GA, Dept of Natural Resources
To:
Office of Nuclear Reactor Regulation
References
NL-07-2097
Download: ML073240761 (3)


Text

Water Use af Vogtle From DNR EP Groundwater usa Reports DailyAvg 2001 2002 2003 2004 j

1209500 1281600 697700 1169600 f

1348500 1392700 736000 614900 m

1395300 1457400 820900 678800 a

1431100 1338100 724200 695900 m

1472600 1284800 840700 924600 j

1544400 1409500 712200 685300 j

1523500 1173100 935700 983800 a

1534000 914100 909400 941500 s

1512100 837700 954900 723500 0

1473300 855900 823000 701800 n

1450500 1045400 681800 715000 d

1454200 1036700 783900 673100 GrandAvg 1445750 1168900 801700 792316.7 1052167 420 60 24 604800 Avg daily use 1089600 1023025 1088100 1047325 1130625 1087850 1154025 1074750 1007050 963500 973175 986975 -

1052167 1052167> -;- zlJ- +~c9 "-'.73D'J.Lm 1052167 604800 245700 1902667 5.JJ<!

Z eJOt!Je:t.. J b Z.oo/~ 1 b 2<J 02.. a..?'b 1C.

'Zot>3a..., b

ltJo 4
4) b

DEPARTMENT OF NATURAL RESOURCES STATE OF GEORGIA GROUNDWATER USE REPORT (Print or tvtlltl aJllolonnatlonl ThIs form shall be submitted to the Division within fifteen (15) days aftar the reporting pariOd specified on the permit under Standald Condition No.3 Pennlttee Southem NuolearOperating Company

  • VogUe EJeelno Generating Plant Permit No.

017-0003 For six month period from 09-01-1999 thru 0~*29*2000 This report Is on the Cretaceous Sand Aquifer used by weU(s) numbered: Make-up Wells #1 and H2A, ConstructIon Well 4#3, Irrigation Well f/4, Tactical Training Well #5, Training center Well" Recreation Area Well, &Well TW-1.

Specific Conductivity.liA-mmhoslcm Static water level (SWL) 45.1 ft.

E1evaiion 155.4 ft, Well no.

MU-1 Date measured 2-15-2000 Pumping water leval (PWL)

~ It Elevation 147.9 ft, Wellna.

MU-1 Date measured 2-15*2000 (Use additional ~eceGSary)

Numberof hours shutdown for aWL measurement 57 min Numberof continuous houre pumped for PWL measurement 64 min Method of measurement: (

) Airline; (X ) Probe;

{ ) Tape: (

)

Other (Specify)

Measurement from:

(X ) Top of casing;

(

) Ground;

(

)

Other (SpecllY)

""'*"--""'~-***r*~-'

Flom 1'6~lIn80tfr~Jl1 ONLY IWElL Take read/ng$ from th~ highest ylelcJ well(s).

Flom B*IO well$ouetfram ONLY 2WEl.1.S using the same well'S) Moh Urna. For From n*ll; weJlI'JIIel Irom ONLY 3WEllS addlUonal walls. follow this formaL FrMl16020 W4U..a 801 ftOll1 ONLV"WElLS Monthly amount of water pumped from aqUifer in thousands of gal.

MONTH TOTAL MAX.DAV Month,lV Method used10 deleonlne pum'page AvgJDay September 26~1,B 1525.2 881.1 (X)

Flowmeter October 22841.8 1017.0 730.8 Other (Specify)

N(lVomber 24859A 1841.4 828.6 Use: For a cODsumpllve use for genlral water supply. cpolll'lg water. process water for December 25365.4 1418,4 B1B.2 operation of Unlla 1 & 2. and Irrigation 01 January 51Q70,8 3158.9 1647.5 omamaolttl vooa!atlon.

February 25035.5 1521.5 863.3 176604.5 ANNUAL AVG.I DAY 919.0 Average hours pumped perday:

8.0 GRAND TOTAL SUCH OTHER PERTINENT INFORMATION FURNISHED BY THE PERMITTEE OR REOUIRED BY THE DIVISION.

Icertify that the above information Is true to best of my knowledge and belief.

Signed ntle General Manager* Vogtie Electtfo Generating Plant Date

DEPAATMENTOFNATURAlRESOURCES STATE OF GEORGIA GROUNDWATER USE REPORT rPrint or Ivoa alllnfonnaJionl This fQnn shall be submitted 10 the Division within 1ifteen (15) days aflerthe reporting period specified on the permit under Standard CondItion NO.3 Permittee Southem Nuclear Operatlng Company

  • Voglla Electric Generating Plant PermII No.

017*0003 For six month period from 09-01*1999 thru 02-29-2000 ThIs report Is on the Cretac:eous Sand Aquifer used by welJ(s} numbered: Make-up WellS #1 and 1t2A, Construction Well #3.lrrlgallon WeU #4. Tactical Training Well #6, Training centerWall, Recreation Area Well, &Well TW*1.

Specific Conductivity-.MA-mmhoslorr Static water level (SWl) 63.5 fl.

Elevation 162.2 ft.

Wall no.

MU*2A Date rnaasured 1-13-2000 Pumping wat(lr level (PWl) 93.6 ft.

Elevatlon 132.2 ft.

Wallna.

~ Date measured 1-13-2000 (Use additional sheet If necessary)

Number of hours shutdown for SWl measurement 4O.5hr Numberof oontlnuous hours pumped for PWL measurement 45 min Method of measurement: (

) Air Linlil; ( X ) Probe;

( ) Tape; (

)

other (Specify)

Measurementfrom:

(X ) Top of oaslng:

(

) Ground;

(

)

Other (Specify)

'ObtaIn IlI1d submit apptopiIBtIlS<lta of maallllremet1~ lIS IlllIloaled belOw Taka reactlngs from the highest yield well(s).

From 1-5 W1lU&..~tfrom ONLYIWEU Fr4l116-10 wllils-a "I !rem ONLY2WeLLS using lhesame wallCs) each tIme. For From 11-15 well.... se!from ONLY3WSLLS additional wells, follow this fOlTlllll:

From 11;-20 well....tllH 'rom ONLY~WELUl Monlhlv amount of water pumped from aqUifer In thousands 01 gal.

/

MONTH Monthly Method used 10detennlne pumpage TOiAL MAx' DAY AvgJDay

~

/~~'

Other (Specify)

N

~

Use: For a CQns\\!IDptlve use lorcentral water SUr1P!lt, ooollng water. prOcess water for

~

A oporatlon of Units 1& 2, Bnd lrrlgatlon of

~

..-/'

oroamental vegej&lljQp

~

ANNUAL AVI3./ DAY Average hours pumped per day:

GRANO TOTAL.

SUCH OTHER PERTINENT INFORMATION FURNISHED BY THE PERMITTEE OR REQUIRED BY THE DIVISION.

I certify fuat the above Infonnation is trua to bast of my knowledge and belief.

Signed 1rl!J~

Title General Manager* Vogtle Electric Generating Plant Date