MONTHYEARML24274A1482024-09-30030 September 2024 NRR E-mail Capture - Davis-Besse - RAI Re Relief Request L-23-214 ML24221A0082024-08-0707 August 2024 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24170B0562024-06-18018 June 2024 NRR E-mail Capture - Acceptance Review Results for Davis-Besse, Unit No. 1 - RR-A1 ISI Impracticality ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besses 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition 2024-09-30
[Table view] |
Text
ynthia Carpenter - Fwd: FirstEnergy's Davis-Besse report. 'Page 1 From: Guy Caputo'0 To: Lisa Clark; Scott Langan Date: 05/0312007 5:38:25 PM
Subject:
Fwd: FirstEnergy's Davis-Besse report FYI
>>> Brian Sheron 05/03/2007 5:26 PM >>>
FYI. You can decide if DOJ needs to see this.
>>> James Wiggins 05/03/2007 4:38 PM >>>
Now, I'm sure I'm living in an alternate reality....
>>> Scott Burnelt05/03/2007 3:36 PM >>>
Talk about wanting to have it both ways...
>>> "Dave Lochbaum" <dlochbaum*,ucsusa.orq> 05/03/2007 3:24 PM >>>
Dear Mr. Ripsom:
Attached is my letter to you regarding the Exponent / Altran report on the reactor vessel head degradation at Davis-Besse. Please feel free to contact me if there are any questions.
Sincerely, Dave Lochbaum Director, Nuclear Safety Project Union of Concerned Scientists 1707 H Street NW Suite 600 Washington, DC 20006-3962 (202) 223-6133 (office),
(202) 331-5430 (direct line)
(202) 223-6162 (fax)
CC: Cynthia Carpenter; James.Fitzgerald; James Gavula; Joseph Ulie; Lawrence Chandler; Martin Virgilio; Michele Janicki; Sandra Hackworth; William Borden; William Kane
Union of i Concerned Scientists Citizens and Scientists for Environmental Solutions April xx, 2007 David B. Ripsom President & Chief Executive Officer Nuclear Electric Insurance Linmited Suite 1100 1201 N. Market Street Wilmington, DE 19801
SUBJECT:
FIRSTENERGY'S DAVIS-BESSE REPORT
Dear Mr. Ripsom:
I read your letter dated February 23, 2007, to Mr. Gary R. Leidich at FirstEnergy Nuclear Operating Company (FENOC) regarding the report prepared by Exponent Failure Analysis Associates and Altran Solutions Corporation about reactor vessel head degradation at the Davis-Besse nuclear plant. FENOC submitted the report to the Nuclear Regulatory Commission (NRC), which is available in the NRC's ADAMS online electronic library under ML070860211. I have read the report, too.
The report raises some new issues, but fails to convince me that the fast corrosion rate scenario was more likely than the scenario described in FENOC's original root cause report and the NRC's augmented inspection team report. Among the points that are not reconciled by the'fast corrosion rate scenario:
During 12RFO in April 2000, a worker at Davis-Besse took the infamous "red photo" showing reddish-tinged boric acid crystals flowing down the outside surface of the reactor vessel head from the service platform's weepholes to the flange area. The Exponent/
Altran report proposes a small control rod drive mechanism (CRDM) nozzle through-wall leak rate with minor reactor vessel head wastage during 12RFO and no significant leakage or wastage until the crack uncovered in the October - November 2001 timeframe. If so, how does that scenario explain the reality shown in the "red photo"?
Rot Ituvr &rik .AidLlpi "n %WITIv:lae IN:
2RFO, Washington Office: 1707 H Street NW Suite 600
- FAX: 202-223-6162 Cambridge Headquarters: Two Brattle Square
- Cambridge MA 02238-9105 - 617-547-5552 - FAX: 617-864-9405 California Office: 2397 Shattuck Avenue Suite 203 - Berkeley CA 94704-1567 - 510-843-1872 # FAX: 510-843-3785
May 3., 2007 Page 2 of 3 The Exponent / Altran report relies on 3-OayAveiagLe UttidentiriecI LeelNRate faqCycle 13 circumstantial evidence to support the theory of crack uncovery in the October - CA0-November 2001 timeframe. Among the cited evidence is an increase in unidentified leak rate occurring after October 19, 2001.
Figure 7.2 from the Exponent / Altran S0o report shows this increase. But the report does not mention or account for the fact D.t that Davis-Besse was shut down on October 19, 2001, and restarted less than a day later due to a generator stator cooling water I- Oa
... -£1 m) -
problem. The thermal cycling associated with shutting down and restarting a nuclear Figure 7.2 Three-dao averace unidentifIed jeak rate for Davis-Besse power plant could easily explain a Cycle 13. -
discernible yet minor increase in the unidentified leakage rate.
In addition to the circumstantial evidence Reactor Coolant Sytem Activity from increased unidentified leakage inside containment, the Exponent / Ahtrain report 9.1111,1S
also relies on increasing radiation levels inside containment in the October - 20 November 2001 timeframe. But the report "a does not mention or account for the fact W that the integrity of the fuel in the reactor 8-was on a steadily declining trend beginning around the April - May 2001 timeframe as I clearly illustrated in the NRC graphic of Reactor Coolant System Activity based on information provided by FENOC. Thus, even a constant leak rate would have produced increasing radiation levels inside containment.
Leakage of borated reactor coolant water resulting in the accumulation of boric acid crystals on the carbon steel reactor vessels was identified at US reactors other than Davis-Besse, including Oconee, Sequoyah, and South Texas Project (shown in picture). Only Davis-Besse encountered significant corrosion and wastage of the head. If the fast corrosion rate theory were close to reality, evidence of corrosion / wastage should have been identified at there other reactors, too.
May 3, 2007 Page 3 of 3 Even if the scenario presented in the Exponent / Altran report is more likely, it still fails to support the conclusion that there was nothing FENOC could have done to prevent the two-year-plus outage that resulted from the discovery of the large hole in the reactor vessel head in March 2002. FENOC met with the NRC staff on November 28, 2001, to discuss Davis-Besse. FENOC could have informed the NRC that it was voluntarily shutting down Davis-Besse in December 2001 to conduct the inspections sought by the NRC via Bulletin 2001-01. After all, the owner of the North Anna and Surry reactors voluntarily shut down all four reactors - even though some were not scheduled for and did not perform refueling outages
- in order to perform the inspections.
Had FENOC shut down Davis-Besse in early December and had the Exponent / Altran timeline been accurate, the timely inspection would have identified the growing problem and stopped it long before it reached the proportions finally found in March 2003. Thus, FENOC could have and should have done more, regardless of whether.the timeline in this Exponent / Altran report is right or not. FENOC should have voluntarily shut down Davis-Besse in 2001 as the NRC sought and as other plant owners responsibly did.
Sincerely, David Lochbaum Director, Nuclear Safety Project