ML072920276

From kanterella
Jump to navigation Jump to search
Letters to Agencies, Beaver Valley Power Station Renewal Application Review
ML072920276
Person / Time
Site: Beaver Valley
Issue date: 11/02/2007
From: Rani Franovich
NRC/NRR/ADRO/DLR/REBB
To: Shetterly T
State of PA, Fish & Boat Commission
Sayoc, Manny, NRR/DLR/RLRB 415-1924
References
Download: ML072920276 (6)


Text

November 2, 2007 Mr. Thomas C. Shetterly Commissioner - Second District Pennsylvania Fish and Boat Commission 236 Lake Road Somerset, PA 15501

SUBJECT:

BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW

Dear Mr. Shetterly:

The U.S. Nuclear Regulatory Commission (NRC) is reviewing an application, submitted by FirstEnergy Nuclear Operating Company (FENOC), for the renewal of the operating licenses for Beaver Valley Power Station (BVPS), Units 1 & 2, located near the town of Shippingport, Beaver County, Pennsylvania. As part of the review of the license renewal application (LRA),

the NRC is preparing a Supplemental Environmental Impact Statement (SEIS) under the provisions of Title 10 of the Code of Federal Regulations Part 51 (10 CFR Part 51), the NRCs regulation that implements the National Environmental Policy Act (NEPA) of 1969.

BVPS is requesting the renewal of its operating licenses for Units 1 and 2 for a period of 20 years beyond the expiration of the current license term, renewing the licenses until July 2036 and March 2047, respectively. The proposed action would include the use and continued maintenance of existing plant facilities and transmission lines; BVPS does not plan to construct or alter any facilities associated with the plant during the period of extended operation.

The NRC staff plans to hold two identical public meetings covering the license renewal review process and NEPA scoping on November 27, 2007, at the Embassy Suites Pittsburgh -

International Airport, 550 Cherrington Parkway, Pittsburgh, PA 15108. The first meeting will convene at 1:30 p.m., and will continue until 4:30 p.m., as necessary. The second meeting will convene at 7:00 p.m., and will continue until 10:00 p.m., as necessary. From November 13 -

16, 2007, the NRC plans to conduct a site audit. You and your staff are invited to attend the public meetings. Your office will receive a copy of the draft SEIS along with a request for comments. The anticipated publication date for the draft SEIS is September 2008.

T. Shetterly If you have any questions concerning the NRC staffs review of this LRA, please contact the Safety/Environmental Project Manager, Mr. Kent Howard, at 301-415-2989 or by e-mail at KLH1@nrc.gov.

Sincerely,

/RA by Bo Pham for/

Rani Franovich, Branch Chief Project Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: See next page

1. Ltr. to w/Encls. 1, 2, Svc. List: ML072920276 OFFICE:

LA:DLR PM:DLR:RPB2 PM:DLR:RPB2 BC:DLR:RPB2 NAME:

SFigueroa ESayoc KHoward RFranovich (BPham for)

DATE:

11/02/07 11/02/07 11/02/07 11/02/07

Letter to T. Shetterly from R. Franovich, dated November 2, 2007

SUBJECT:

BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW HARD COPY DLR RF E-MAIL:

PUBLIC SSmith (srs3)

SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSbwb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter KHoward ESayoc PBuckberg NMorgan MModes, RI PCataldo, RI DWerkheiser, RI RBellamy, RI

Beaver Valley Power Station, Units 1 and 2 cc:

Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Nuclear Operating Company Mail Stop A-GO-15 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Ohio EPA-DERR ATTN: Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149 Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB-1 P.O. Box 4, Route 168 Shippingport, PA 15077 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.

Harrisburg, PA 17110-9364 Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803

Beaver Valley Power Station, Units 1 and 2 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077 Cliff Custer FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 Mike Banko FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 Julie Firestone FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077