Proposed License Amendment Request Containment Sump Inspection Surveillance Response to NRC Request for Additional Information
ML071710608
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/19/2007
From: Bischof G T
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
07-0364, GL-04-002
Download: ML071710608 (14)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 2326 1 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Serial No. 07-0364 NL&OS/GDM R1 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 CONTAINMENT SUMP INSPECTION SURVEILLANCE RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMA In a letter dated October 3, 2006 (Serial No.06-791), Virginia Electric and Power Company (Dominion) requested amendments, in the form of changes to the Technical Specifications (TS) to Facility Operating License Numbers DPR-32 and DPR-37 for Surry Power Station Units 1 and 2, respectively. The proposed amendment would revise the TS surveillance requirements related to inspection of the containment sump trash racks and screens, Inside Recirculation Spray (RS) pump wells, and Outside RS and Low Head Safety Injection (LHSI) pump suction inlets. The revised TS surveillance requirements are necessary to accommodate inspection of the new RS and LHSI strainer assemblies that are being installed as part of Dominion's resolution of the issues raised in NRC Generic Safety Issue 191 and Generic Letter 2004-02.

In a letter dated May 3, 2007, the NRC staff requested additional information to facilitate their review of the proposed license amendment. Dominion's response to the staff's request is included in the attachment.

As discussed in the attachment, the additional information provided herein does not affect the significant hazards consideration determination or environmental assessment that were previously provided in support of the proposed license amendment request. If you have any questions or require additional information, please contact Mr. Gary D. Miller at (804) 273-2771.

Sincerely, Vice President - Nuclear ~Wneerin~

Serial No. 07-0364 Docket Nos.

50-2801281 Page 2 of 3 Attachment Response to NRC Request for Additional Ilnformation, Containment Sump Inspection Surveillance Requirements, License Amendment Request dated October 3, 2006 (Serial No.06-791) Commitment made in this letter:

1. An Engineering Transmittal will be prep.ared to formally document the review of missiles, high energy line breaks (HELB) and the potential effects of pipe whip and jet impingement on the newly designed Surry Units 1 and 2 containment sump strainer assemblies. cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. D. C. Arnett NRC Resident Inspector Surry Power Station State Health Commissioner Virginia Department of Health James Madison Building - 7th Floor 109 Governor Street Room 730 Richmond, Virginia 2321 9 Mr. S. P. Lingam NRC Project Manager - Surry U. S. Nuclear Regulatory Commission One White Flint North 11 555 Rockville Pike Mail Stop 8-G9A Rockville, Maryland 20852 Mr. R. A. Jervey NRC Project Manager - North Anna U. S. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Mail Stop 8G9A Rockville, Maryland 20852 Serial No. 07-0364 Docket Nos. 50-2801281 Page 3 of 3 COMMONWEALTH OF VIRGINIA ) ) COUNTY OF HENRICO 1 The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Gerald T. Bischof, who is Vice President - Nuclear Engineering, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief. Acknowledged before me this /y%Aay of , ,2007. L' MY commission Expires: 3 1; 2 0,~ . Notary Public VICKI 1. HULL (SEAL)

Serial No. 07-0364 Docket Nos.

50-2801281 ATTACHMENT Response to NRC Request lor Additional Information Containment Sump Inspection Surveillance Requirements License Amendment Request dated October 3,2006 (Serial No.06-791 1 Virginia Electric and Power Company (Dominion)

Surry Power Station Units 1 and 2 Serial No. 07-0364 Docket Nos. 50-280 and 281 Attachment Response to NRC Request lor Additional Information Containment Sump Inspection Surveillance Requirements Surrv Power Station Units 1 and 2 NRC Comment: In Attachment I, "Discussion of Change," Section 5.0, page 5 of 1 I to the licensee's letter dated October 3, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession No.

ML062770208), the licensee stated that the modified sump strainer assemblies for recirculation spray and low head safety injection systems are designed to be mounted in a modular format on the containment floor around the containment sump. Each module contains a number of fins attached to the body of the module, and each module is bolted to the containment floor and connected to each other by flexible metal seals.

The following additional information is requested.

I. Provide a simple sketch of the layout showing the arrangement for the existing and modified containment sump designs. Wh'at is the total strainer area of the modified sump strainer design compared with the total area of the existing sump strainer design? Dominion Response The configuration of the Surry containment sump strainer is shown in Sketch 1. The sketch reflects the existing Surry Unit 1 strainer arrangement. The Unit 2 strainer configuration (prior to the implementation of the partial strainer replacement modification performed during the fall 2006 refueling outage) was similar to Unit 1. Sketch 2 shows the current configuration of the containment sump strainer pump suction header that was installed in Surry Unit 2 during the fall 2006 refueling outage. Sketch 3 shows one of the four installed modules.

Sketch 4 shows the final configuration of the containment sump strainers that will be installed in Surry Units I and 2. (Note: Surry Unit 1 shown.) Comparison of Total Strainer Areas Page I of 6 Recirculation S ra Station Pre-mod Post-mod 11 162.02 ft. 6220 ft. SPS2 162.02 ft.

6240 ft. Low Head Safety Injection Pre-mod 5502ft: 55.02 ft. Post-mod 21 80 ft.' 2230 ft.'

CONTAINMENT SUMP SCREEN (UNIT I ONLY) PLAN EL. -27'- 7' -w . SECTION 8-8 SECTION A-A Sketch 1 ISOMETRIC DETAIL Sketch 2 SECTION AA Perforated Fins Header Sketch 3 RS Header IRS PUMP (1-RS-P-1A)

ORS PUMP (1 -RS-P-2A)

LHSi PUMP (1-SI-P-1A)

LHSl PUMP (1-SI-P-16)

ORS PUMP (I-RS-P- IRS PUMP (I-RS-P- Sketch 4 Serial No. 07-0364 Docket Nos. 50-280 and 281 Attachment

2. Discuss the load components (such as dead weight load, debris loads, hydrodynamic mass, thermal, seismic load, loads due to differential pressure or head loss, loads due to any other dynam~c effects, etc.) and load combinations that are used in fhe sfrucfural design of fhe modified modular sump strainer components and the floor-mounted bolted connections. Dominion Response General The sump replacement strainers have been1 analyzed, as required, for the specified normal and accident conditions inside containment.

Stresses and stability were determined to be in accordance with the 1989 Edition of the ASME NF Code for Class 3 Component Supports.

Dead Weight Loads Dead weight load due to debris on the strainer was determined by calculating the maximum quantity of debris that would be transported to the strainer by the most limiting break.

In addition to the analysis, Atomic Energy of Canada Ltd. performed hydraulic testing which simulated the actual debris loading conditions specific to Surry Power Station. The analysis and testing de~monstrate that the full strainer installation design ensures that the strainers are capable of withstanding the force of full debris loading in conjunction with design basis condi,tions, including seismic activity. Debris Load The strainers were designed to ensure that they are capable of withstanding the force of full debris loading, in conjunction with design basis conditions. The effect of the debris load is reflected in the dead weight and suction pressure terms of the analysis.

A sacrificial area of 150 ft2 has been considered to include foreign materials such as labels, stickers, signs, tags, tape, tie wrap and miscellaneous materials. These foreign materials are considered to fully transport to the sump strainer. The strainers are capable of withstanding the force of full debris loading in conjunction with design basis conditions, including seismic activity.

Hvdrodvnamic Mass Hydrodynamic forces are considered in the seismic analysis of the strainer. Specifically, the dynamic effects of surrounding water on the submerged strainer structure during an earthquake, i.e., added water mass, inertia coupling, impulse, sloshing, wave actions, damping and participation of added water mass in the forcing term were considered.

The benefit of increased damping was not credited in the present analysis.

For additional conservatism, full participation of added water mass in the forcing term was assumed. Page 2 of 6 Serial No. 07-0364 Docket Nos. 50-280 and 281 Attachment Thermal Loads Thermal loads are considered in the seismic analysis.

To allow for relative thermal expansion between the strainer modules and the reactor building, adjacent modules are installed with a gap between them, which is sealed with a flexible metallic seal. Engineered slots are provided to accommodate thermal expansion. Thermal expansion of the header between slots under maximum Reactor Building air temperature following a Loss of Coolant Accident (LOCA) is 0.2". Furthermore, there is an installation requirement that at least 1/4" is to be left in the slot to accommodate thermal expansion.

As a result, thermal stress due to constraint did not need to be considered. Seismic Loads The strainer design specification states that the strainer is designed to withstand the effects of five (5) Operating Basis Earthquake (OBE) events and one (1)

Design Basis Earthquake (DBE) event in accordance with the requirements of IEEE Std. 344-1975 as endorsed by NRC RG 1 .loo, Revision I, or IEEE Std. 344-1987 as endorsed by RG 1 .loo, Revision 2. Static or dynamic analysis and/or seismic testing was required to ensure the strainers meet these requirements. The strainer purchase specification included the amplified response spectra used in the seismic analysis, which are the DBE and OBE seismic response spectra for all three directions at 2% damping. The seismic analysis report for the replacement sump strainers stated that the strainers have been analyzed, as required, for the specified normal and accident conditions inside containment, and the strainer stresses and stability were determined to meet the 1989 Edition of the ASME NF Code for Class 3 Component Supports. Differential Pressure Loads A calculation was performed to determine the structural differential pressure for the containment sump strainers and concluded that 9.0 psi was to be used for the strainer design differential pressure.

Head Loss Loads The seismic analysis uses different terminolo!gy for the maximum head loss loads.

The analysis uses suction pressure, instead.

The effects on stress due to suction pressure are presented in the seismic analysis by finit:e element analysis models of the strainer components. The strainer components were determined to be within their allowable stress limits.

Other Dynamic Effects The assessment of bleed line piping loads is also included in the strainer seismic analysis. The bleed line piping loads were applied in one separate load case and their effects on the strainer header were determined to be small. Dominion calculations reflect the modified design and configuration of the bleed line piping. Page 3 of 6 Serial No. 07-0364 Docket Nos. 50-280 and 281 Attachment Load Combinations The loading combinations from the seismic analysis and are:

Comment Level A Sump Condition Level B Notations used in Table 1-2: DW = Deadweight LL = Live Load

= 60 psf from cover platform OBE = Operating Basis Earthquake SP = Differential suction Pressure

= 9 psi SSE = Safe Shutdown Earthquake Hydrodynamics

= Forces from water acting on the strainer during an earthquake TI = Maximum air temperature under normal condition

= 125°F T2 = Maximum sump water temperature under accident condition

= 280°F Category LC-1 Level C 3. In reference to the calculation for the evaluation to establish the structural adequacy of the modified sump strainer assemblies, provide a summary of the structural adequacy evaluation of the modified sump strainer highlighting the design margins. Also, identify the design codes that were ~~ltilized in the structural design. Loading Combination Service Limits LC-2 Dominion Response Load Cases DW+LL LC-3 Structural Evaluation Summaw DW+OBE The design conditions for the strainer modules, as defined in the strainer procurement specification, include the live load, suction pressure (maximum head loss for the screen), thermal loading, and seismic events (OBE and DBE).

Normal DW+SP+SSE+Hydrodynamics The specific condition considered is a DBE during which a Safe Shutdown Earthquake (SSE) occurs while the strainer is in a submerged condition after a LOCA. The ability of the strainers to perform their safety functions during and/or after 5 OBE (Operating Basis Earthquake) and one SSE has been demonstrated in the seismic analysis report for Surry Unit 2 which concludes that:

Upset Page 4 of 6 Dry Accident Material Properties at TI Dry Material Properties at TI Wet Submerged Material Properties at T2 Serial No.

07-0364 Docket Nos.

50-280 and 281 Attachment The stress levels meet the 1989 Edition of ASME Section Ill, Subsection NF for Class 3 Component Supports, and Deflection of the strainers during a DBE and LOCA will not open up additional leakage paths.

The seismic analysis report for the Surry Unit 1 strainer is currently undergoing technical review; however, the results are expected to be similar to the Surry Unit 2 analysis results. Design Margins Hundreds of stresses were calculated in the strainer seismic analysis report.

By comparing the calculated stresses to the allowable stresses, the margin for each strainer component was determined.

Most components were determined to have significant margin, and every analyzed strainer component was determined to be within its allowable stress limits.

Codes The design codes used in the structural design of the strainer include the following:

ASME Ill subsection NF Class 3, 0 AWS Dl .I, 2004, American Welding Society Structural Welding Code-Steel, 0 AWS D1.6, 1999, American Welding Society Structural Welding Code- Stainless Steel, 0 ASME Boiler and Pressure Vessel Code, Section 111, 1971 through 1980, 0 ASME NQA-1-1994 edition, "Quality Assurance Requirements for Nuclear Facility Applications," and 0 The cover plate design shall be based or1 the AISC, Manual of Steel Construction, th 7 Edition. NRC Comment: Regarding item No. 6 of the licensee's letter dated March 28, 2007 (ADAMS Accession No. ML0708712221, clarify whether the drawing reviews and evaluations performed to determine the absence of any missiles, high energy lines and associated dynamic effects due to pipe whip and jet impingement on the modified strainer assemblies are documented in calculations or reports. Provide references by citing the specific document and a summary of these evaluations. Dominion Response The reviews and evaluations performed to determine the absence of any missiles, high energy lines and associated dynamic effects due to pipe whip and jet impingement on the modified strainer have not been specificallly documented at this time other than the Page 5 of 6 Serial No. 07-0364 Docket Nos. 50-280 and 281 Attachment general conclusions that were included in the design change package that was prepared to partially install the Surry Unit 2 strainer during the fall 2006 refueling outage, and as provided in our previous letter dated March 28, 2007 (Serial No. 06-0117).

Consequently, an Engineering Transmittal will be prepared to formally document the review of missiles, high energy line breaks (HELB) and the potential effects of pipe whip and jet impingement on the newly designed Surry Units 1 and 2 containment sump strainer assemblies.