Electronic Generating Plant, Units 1 and 2 - Measurement Uncertainly Recapture Power Uprate Application
ML072850017
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/02/2007
From: Siva Lingam
NRC/NRR/ADRO/DORL/LPLII-1
To: Tynan T
Southern Nuclear Operating Co
Lingam, Siva NRR/DORL 415-1564
References
TAC MD6625, TAC MD6626
Download: ML072850017 (5)


Text

November 2, 2007 Mr. Tom E. Tynan Vice President - Vogtle Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE APPLICATION (TAC NOS.

MD6625 AND MD6626)

Dear Mr. Tynan:

In a letter dated August 28, 2007, and supplemented by letter dated October 9, 2007, Southern Nuclear Operating Company (SNOC) submitted an application requesting to increase the licensed thermal power level for the Vogtle Electric Generating Plant, Units 1 and 2. The proposed amendment would increase the licensed core power level by 1.7 percent to 3625.6 megawatts thermal with the installation of the Caldon Check-Plus ultrasonic feedwater flow element.

We note that your August 28, 2007, letter requested the staffs decision on your application by March 1, 2008, and that the staffs review conducted to date has included considerable attention to the radiological dose analyses that require revision to support the application. While the staffs guidance in Regulatory Issue Summary 2002-03, dated January 31, 2002, (RIS) did encourage clear identification of subject areas that would and would not be affected by an MUR application, it has not been the staffs general expectation that this would include substantial revisions to radiological dose analyses or the supporting atmospheric dispersion analysis, high-pressure turbine modifications, and the minimum departure from nucleate boiling ratio calculations based on VIPRE. Based on the review conducted to date, we anticipate that the potential complexity of these review issues may result in a challenge to completion of the MUR review within the typical timeframes discussed in the RIS. In that regard, the most expeditious response by SNOC to staff needs for additional information could contribute to minimizing such extensions of the review schedule.

While noting the above, we wish to inform you that, based on the information contained in your application and its supplement, as compared to the RIS, the staff has determined that SNOC has provided the necessary information for the NRC staff to begin a detailed technical review. If you have any questions, please contact me at 301-415-1564.

Sincerely,

/RA/

Siva P. Lingam, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425 cc: See next page

ML072850017 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/PGCB/BC NRR/LPL2-1/BC NAME RMartin for SLingam MO=Brien MMurphy EMarinos DATE 10 / 19 /07

/ /07 10 / 29 /07 11 / 02 /07

Vogtle Electric Generating Plant, Units 1 & 2 cc:

Mr. Tom E. Tynan Vice President - Vogtle Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 Mr. N. J. Stringfellow Manager, Licensing Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295 Mr. Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295 Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334 Mr. Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 Mr. Laurence Bergen Oglethorpe Power Corporation 2100 East Exchange Place P.O. Box 1349 Tucker, GA 30085-1349 Arthur H. Domby, Esquire Troutman Sanders Nations Bank Plaza 600 Peachtree Street, NE Suite 5200 Atlanta, GA 30308-2216 Resident Inspector Vogtle Plant 8805 River Road Waynesboro, GA 30830 Office of the County Commissioner Burke County Commission Waynesboro, GA 30830 Mr. J. A. Gresham Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company LLC P. O. Box 355 Pittsburgh, PA 15230-0355