HNP-07-121, Exam 05000400-07-301 Post-Exam Comments-None for Written Exam
From kanterella
(Redirected from ML072760022)
Jump to navigation
Jump to search
ML072760022 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 08/27/2007 |
From: | Kilpatrick G Progress Energy Carolinas |
To: | Haag R NRC/RGN-II |
References | |
50-400/07-301, HNP-07-121, IR-07-301 | |
Download: ML072760022 (3) | |
Similar Documents at Harris | |
---|---|
Category:Letter type:HNP
MONTHYEARHNP-18-050, Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date2018-09-17017 September 2018
[Table view]Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme2018-08-13013 August 2018 License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme HNP-18-035, Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Inservice Inspection Program for Containment, Third Ten-Year Interval2018-06-0404 June 2018 Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Inservice Inspection Program for Containment, Third Ten-Year Interval HNP-18-049, Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 192018-05-0303 May 2018 Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 19 HNP-18-023, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes2018-05-0202 May 2018 Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes HNP-18-042, Annual Environmental (Non-radiological) Operating Report2018-04-30030 April 2018 Annual Environmental (Non-radiological) Operating Report HNP-18-031, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report HNP-18-032, Annual Radiological Environmental Operating Report2018-04-25025 April 2018 Annual Radiological Environmental Operating Report HNP-18-047, Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation2018-04-20020 April 2018 Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation HNP-18-045, Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval2018-04-18018 April 2018 Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval HNP-18-044, Cycle 22 Core Operating Limits Report, Revision O2018-04-16016 April 2018 Cycle 22 Core Operating Limits Report, Revision O HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2018-04-13013 April 2018 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-18-021, Annual Report in Accordance with Technical Specification 6.9.1.22018-02-19019 February 2018 Annual Report in Accordance with Technical Specification 6.9.1.2 HNP-18-020, Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses2018-02-16016 February 2018 Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses HNP-18-019, Cycle 21 Core Operating Limits Report, Revision 12018-02-14014 February 2018 Cycle 21 Core Operating Limits Report, Revision 1 HNP-18-017, CFR 50.54(q) Evaluations2018-02-0505 February 2018 CFR 50.54(q) Evaluations HNP-18-001, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-02-0101 February 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors HNP-18-002, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2018-01-22022 January 2018 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-18-003, Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses2018-01-18018 January 2018 Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses HNP-18-007, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations2018-01-11011 January 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations HNP-18-006, Submittal of 14-Day Special Report for Accident Radiation Monitors2018-01-0404 January 2018 Submittal of 14-Day Special Report for Accident Radiation Monitors HNP-17-093, Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 32017-11-29029 November 2017 Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3 HNP-17-078, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2017-11-27027 November 2017 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-17-082, Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed in2017-10-30030 October 2017 Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed in HNP-17-084, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2017-10-30030 October 2017 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-17-025, Fourth Interval Inservice Inspection Plan, Third Interval Containment Inservice Inspection Plan, and Fourth Interval Inservice Inspection Pressure Test Plan2017-10-23023 October 2017 Fourth Interval Inservice Inspection Plan, Third Interval Containment Inservice Inspection Plan, and Fourth Interval Inservice Inspection Pressure Test Plan HNP-17-072, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis2017-10-19019 October 2017 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis HNP-17-077, License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications2017-10-10010 October 2017 License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications HNP-17-076, Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements2017-10-0202 October 2017 Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements HNP-17-073, Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-09-14014 September 2017 Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-062, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-09-13013 September 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal HNP-17-061, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-07-20020 July 2017 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-008, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-06-28028 June 2017 License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-003, License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection2017-06-0505 June 2017 License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection HNP-17-040, Snubber Program Plan2017-06-0101 June 2017 Snubber Program Plan HNP-17-051, 10 CFR 50.54(q) Evaluation2017-05-24024 May 2017 10 CFR 50.54(q) Evaluation HNP-17-050, Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information Center2017-05-24024 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information Center HNP-17-041, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete2017-05-22022 May 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Du HNP-17-033, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 112017-05-22022 May 2017 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 HNP-17-049, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations2017-05-18018 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations HNP-17-047, 10 CFR 50.54(q) Evaluation2017-05-18018 May 2017 10 CFR 50.54(q) Evaluation HNP-17-046, 10 CFR 50.54(q) Evaluation2017-05-18018 May 2017 10 CFR 50.54(q) Evaluation HNP-17-048, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations2017-05-18018 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations HNP-17-029, FSAR Amendment No. 612017-05-10010 May 2017 FSAR Amendment No. 61 HNP-17-024, Annual Environmental (Nonradiological) Operating Report2017-04-28028 April 2017 Annual Environmental (Nonradiological) Operating Report HNP-17-023, Annual Radioactive Effluent Release Report2017-04-28028 April 2017 Annual Radioactive Effluent Release Report HNP-17-034, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-1062017-04-25025 April 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106 HNP-17-035, Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk Evaluator2017-04-12012 April 2017 Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk Evaluator HNP-17-045, 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation2017-03-30030 March 2017 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation HNP-17-014, Annual Report in Accordance with Technical Specifications, Section 6.9.1.22017-02-16016 February 2017 Annual Report in Accordance with Technical Specifications, Section 6.9.1.2 2018-09-17 Category:License-Operator MONTHYEARML24127A1592024-05-0808 May 2024
[Table view]– Notification of Licensed Operator Initial Examination 05000400/2024302 RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000400/20243012024-02-21021 February 2024 – NRC Operator Licensing Examination Approval 05000400/2024301 ML22314A0912022-11-10010 November 2022 2A-2 Exam Final Items - Delay Release ML22314A0892022-11-10010 November 2022 2A-1 Exam Draft Items - Delay Release ML22291A1632022-10-18018 October 2022 301 Final SRO Written Exam Document ML22291A4322022-10-18018 October 2022 301 Final RO Written Exam Document ML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22034A5352022-02-0202 February 2022 Notification of Licensed Operator Initial Examination 05000400/2022301 ML21167A2922021-06-16016 June 2021 301 ADAMS 2B ML21167A3352021-06-16016 June 2021 301 ADAMS 2A-3 ML21167A3162021-06-16016 June 2021 301 ADAMS 2A-1 ML21167A3272021-06-16016 June 2021 301 ADAMS 2A-2 ML21111A3502021-04-21021 April 2021 March 2021 GFE- Public.Docx ML21106A2142021-04-0707 April 2021 301 Retake Approval Letter ML21060B1762021-03-0101 March 2021 301 Retake Corporate Notification Letter ML21028A4052021-01-25025 January 2021 301 ADAMS 2A-2 ML21028A4472021-01-25025 January 2021 301 ADAMS 2A-3 ML21028A3392021-01-25025 January 2021 301 ADAMS 2A-1 ML21028A1002021-01-18018 January 2021 301 ADAMS 2B ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21004A2352021-01-0404 January 2021 301 Exam Report Items - RO as Given Written Exam ML21004A2362021-01-0404 January 2021 301 Exam Report Items - SRO as Given Written Exam ML20311A1042020-11-0606 November 2020 Operator Licensing Written Examination Approval 05000400/2020301 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19100A1872019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Shearon Harris Nuclear Plant ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18240A1592018-08-28028 August 2018 301 Exam Administrative Items (ADAMS-2D) ML18240A1522018-08-28028 August 2018 301 Exam Final Items (ADAMS-2B)- Delay Release 2 Yrs ML18240A1462018-08-28028 August 2018 301 Exam Draft Items (ADAMS-2A) - Delay Release 2 Yrs ML18121A4382018-05-0101 May 2018 301 Final RO Written Exam - Delay Release 2 Yrs ML17192A4432017-07-11011 July 2017 301 Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML17192A4452017-07-11011 July 2017 301 Final Items (ADAMS-2B)- Delay Release 2 Yrs ML17192A4472017-07-11011 July 2017 301 Admin Items (ADAMS-2C)- Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16218A4992016-08-30030 August 2016 Initial Exam 2016301 Final SRO Written with Answer Key - Delay Release 2 Years ML16218A4942016-08-30030 August 2016 Initial Exam 2016301 Final RO Written with Answer Key - Delay Release 2 Years ML16197A5772016-07-12012 July 2016 Operator Licensing Written Examination Approval 05000400/2016301 ML16054A5432016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000400/2016301 ML15013A2312015-01-13013 January 2015 Initial Exam 2014-302 Draft Administrative Documents ML15013A2352015-01-13013 January 2015 Initial Exam 2014-302 Draft RO Written Exam ML15013A2382015-01-13013 January 2015 Initial Exam 2014-302 Draft SRO Written Exam ML15013A2412015-01-13013 January 2015 Initial Exam 2014-302 Draft Simulator Scenarios ML15013A2452015-01-13013 January 2015 Initial Exam 2014-302 Draft Sim_IN-Plant JPMs ML15013A2492015-01-13013 January 2015 Initial Exam 2014-302 Draft Administrative JPM ML15013A2512015-01-13013 January 2015 Initial Exam 2014-302 Final Administrative Documents ML15013A2622015-01-13013 January 2015 Initial Exam 2014-302 Final Simulator Scenarios 2024-05-08 Category:Part 55 Examination Related Material MONTHYEARML24127A1592024-05-0808 May 2024
[Table view]– Notification of Licensed Operator Initial Examination 05000400/2024302 RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000400/20243012024-02-21021 February 2024 – NRC Operator Licensing Examination Approval 05000400/2024301 ML22314A0892022-11-10010 November 2022 2A-1 Exam Draft Items - Delay Release ML22314A0912022-11-10010 November 2022 2A-2 Exam Final Items - Delay Release ML22291A1632022-10-18018 October 2022 301 Final SRO Written Exam Document ML22291A4322022-10-18018 October 2022 301 Final RO Written Exam Document ML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22034A5352022-02-0202 February 2022 Notification of Licensed Operator Initial Examination 05000400/2022301 ML21167A2922021-06-16016 June 2021 301 ADAMS 2B ML21167A3352021-06-16016 June 2021 301 ADAMS 2A-3 ML21167A3162021-06-16016 June 2021 301 ADAMS 2A-1 ML21167A3272021-06-16016 June 2021 301 ADAMS 2A-2 ML21106A2142021-04-0707 April 2021 301 Retake Approval Letter ML21060B1762021-03-0101 March 2021 301 Retake Corporate Notification Letter ML21028A3392021-01-25025 January 2021 301 ADAMS 2A-1 ML21028A4052021-01-25025 January 2021 301 ADAMS 2A-2 ML21028A4472021-01-25025 January 2021 301 ADAMS 2A-3 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21004A2362021-01-0404 January 2021 301 Exam Report Items - SRO as Given Written Exam ML21004A2352021-01-0404 January 2021 301 Exam Report Items - RO as Given Written Exam ML20311A1042020-11-0606 November 2020 Operator Licensing Written Examination Approval 05000400/2020301 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations RA-19-0237, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19100A1872019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Shearon Harris Nuclear Plant ML18240A1592018-08-28028 August 2018 301 Exam Administrative Items (ADAMS-2D) ML18240A1462018-08-28028 August 2018 301 Exam Draft Items (ADAMS-2A) - Delay Release 2 Yrs ML18240A1522018-08-28028 August 2018 301 Exam Final Items (ADAMS-2B)- Delay Release 2 Yrs ML18121A4382018-05-0101 May 2018 301 Final RO Written Exam - Delay Release 2 Yrs ML17192A4432017-07-11011 July 2017 301 Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML17192A4452017-07-11011 July 2017 301 Final Items (ADAMS-2B)- Delay Release 2 Yrs ML17192A4472017-07-11011 July 2017 301 Admin Items (ADAMS-2C)- Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16218A4992016-08-30030 August 2016 Initial Exam 2016301 Final SRO Written with Answer Key - Delay Release 2 Years ML16218A4942016-08-30030 August 2016 Initial Exam 2016301 Final RO Written with Answer Key - Delay Release 2 Years ML16197A5772016-07-12012 July 2016 Operator Licensing Written Examination Approval 05000400/2016301 ML16054A5432016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000400/2016301 ML15013A2622015-01-13013 January 2015 Initial Exam 2014-302 Final Simulator Scenarios ML15013A2752015-01-13013 January 2015 Initial Exam 2014-302 General Correspondence ML15013A2712015-01-13013 January 2015 Initial Exam 2014-302 Final Administrative JPMs ML15013A2672015-01-13013 January 2015 Initial Exam 2014-302 Final Sim_IN-Plant JPMs ML15013A2512015-01-13013 January 2015 Initial Exam 2014-302 Final Administrative Documents ML15013A2492015-01-13013 January 2015 Initial Exam 2014-302 Draft Administrative JPM ML15013A2452015-01-13013 January 2015 Initial Exam 2014-302 Draft Sim_IN-Plant JPMs ML15013A2412015-01-13013 January 2015 Initial Exam 2014-302 Draft Simulator Scenarios ML15013A2382015-01-13013 January 2015 Initial Exam 2014-302 Draft SRO Written Exam ML15013A2352015-01-13013 January 2015 Initial Exam 2014-302 Draft RO Written Exam ML15013A2312015-01-13013 January 2015 Initial Exam 2014-302 Draft Administrative Documents ML15013A5232015-01-0808 January 2015 December 2014 - Shearon Harris Generic Fundamentals Examination Results IR 05000400/20143022014-12-30030 December 2014 NRC Operator License Examination Report 05000400/2014302 2024-05-08 |