ML100550468
| ML100550468 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/04/2010 |
| From: | Michael Mahoney Plant Licensing Branch III |
| To: | Allen B FirstEnergy Nuclear Operating Co |
| Mahoney, M NRR/DORL/LPLIII- 2 415-3867 | |
| References | |
| TAC MD1405 | |
| Download: ML100550468 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555"()001 March 4, 2010 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 - WITHDRAWAL OF AN AMENDMENT REQUEST RE: EXCLUDE THE SOURCE RANGE NEUTRON FLUX INSTRUMENT CHANNEL PREAMPLIFIER FROM THE TECHNICAL SPECIFICATION CHANNEL CALIBRATION REQUIREMENTS (TAC NO. MD1405)
Dear Mr. Allen:
By letter dated June 2, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092020221), as supplemented by letter dated December 22,2009 (ADAMS Accession No. ML093630340), you applied for an amendment to the Davis-Besse Nuclear Power Station, Unit No.1 Operating License No. NPF-3. The proposed change would have excluded the source range neutron flux instrument channel preamplifier from the CHANNEL CALIBRATION requirements of Technical Specification (TS) 3.3.9, "Source Range Neutron Flux," and TS 3.9.2, "Nuclear Instrumentation." Subsequently, by letter dated February 16, 2010, you withdrew the amendment request.
The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of Consideration of Issuance of the proposed amendment had not been published in the Federal Register.
Michael Mahoney, Proje Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 cc: Distribution via Listserv
March 4, 2010 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 - WITHDRAWAL OF AN AMENDMENT REQUEST RE: EXCLUDE THE SOURCE RANGE NEUTRON FLUX INSTRUMENT CHANNEL PREAMPLIFIER FROM THE TECHNICAL SPECIFICATION CHANNEL CALIBRATION REQUIREMENTS (T AC NO. MD1405)
Dear Mr. Allen:
By letter dated June 2, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092020221), as supplemented by letter dated December 22, 2009 (ADAMS Accession No. ML093630340), you applied for an amendment to the Davis-Besse Nuclear Power Station, Unit No.1 Operating License No. NPF-3. The proposed change would have excluded the source range neutron flux instrument channel preamplifier from the CHANNEL CALIBRATION requirements of Technical Specification (TS) 3.3.9, "Source Range Neutron Flux," and TS 3.9.2, "Nuclear Instrumentation." Subsequently, by letter dated February 16, 2010, you withdrew the amendment request.
The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of Consideration of Issuance of the proposed amendment had not been published in the Federal Register.
Sincerely, IRA!
Michael Mahoney, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDorlLpl3-2 Resource RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource RidsNrrLATHarris Resource RidsRgn3-2MailCenter Resource RidsNrrDorlDpr Resource RidsNrrPMMMahoney Resource LPL3-2 r/f ADAMS Accession No. Ml100550468 NRR*106 NRRlLPL3-2/BC IPM NRRlLPL3-2/LA THarris SCampbell 03/4/10 03/4/10 OFFICIAL AGENCY RECORD