Revised Pages of Facility Operating License DPR-38, DPR-47 and DPR-55 B.5.b
ML072290004
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/16/2007
From:
NRC/NRR/ADRO/DORL/LPLII-1
To:
Olshan L N, NRR/DLPM, 415-1419
Shared Package
ML072260285 List:
References
EA-02-026, TAC MD4712, TAC MD4713, TAC MD4714
Download: ML072290004 (7)


Text

ENCLOSURE 1 REVISED PAGES OF RENEWED FACILITY OPERATING LICENSES DPR-38, DPR-47, AND DPR-55 DOCKET NOS. 50-269, 50-270, AND 50-287 OCONEE NUCLEAR STATION. UNITS 1. 2. AND 3 Replace the following pages of the Renewed Facility Operating Licenses. The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.

REMOVE INSERT Renewed License DPR-38 Renewed License DPR-38 Page 8 Page 8 Page 9 Renewed License DPR-47 Renewed License DPR-47 Page 8 Page 8 Page 9 Renewed License DPR-55 Renewed License DPR-55 Page 8 Page 8 Page 9

December 27, 1984; December 5, 1988; and August 21, 1989 subject to the following provision:

The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

E Physical Protection Duke Power Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains safeguards information protected under 10 CFR 73.21, is entitled: "Duke Energy Physical Security Plan" submitted by letter dated September 8, 2004, and supplemented on September 30, 2004, October 15, 2004, October 21. 2004, and October 27, 2004.

F. In the update to the UFSAR required pursuant to 10 CFR 50.71 (e)(4) scheduled for July, 2001, the licensee shall update the UFSAR to include the UFSAR supplement submitted pursuant to 10 CFR 54.21(d) as revi-ed on March 27, 2000. Until the UFSAR update is complete, the licensee may make changes to the programs described in its UFSAR supplement without prior Commission approval, provided that the licensee evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

G. The licansee's UFSAR supplement submitted pursuant to 10 CFR 54.21(d), as revised on March 27, 2000, describes certain future inspection activities to be completed before the period of extended operation. The licensee shall complete these activities no later than February 6, 2013.

Renewed License No. DPR-38 Revised by letter dated August 16, 2007

H. Mitiaation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and [hat include the'following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use-of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders
4. This renewed license is effective as of the date of issuance and shall expire at midnight on February 6, 2033.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By Roy P. Zimmerman Roy P. Zimmerman, Acting Director Office of Nuclear Reactor Regulation

Attachment:

1) Appendix A - Technical Specifications Renewed License No. DPR-38 Date of Issuance: May 23, 2000 Renewed Licehse No. DPR-38 Amendment No. f5 Revised by letter dated August 16, 2007

December 27, 1984; December 5, 1988; and August 21, 1989 subject to the following provision:

The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

E Physical Protection Duke Power Company LLC shall fully implement and maintain in effect all provisions the Commission-approved physical security, training and qualificationof and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains safeguards information protected under 10 CFR 73.21, is entitled: "Duke Energy Physical Security Plan" submitted by letter dated September 8, 2004, and supplemented on September 30, 2004, October 15, 2004, October 21, 2004, and October 27, 2004.

F. In the update to the UFSAR required pursuant to 10 CFR 50.71(e)(4) scheduled for July, 2001, the licensee shall update the UFSAR to include the UFSAR supplement submitted pursuant to 10 CFR 54.21 (d) as revised on March 27, 2000. Until the UFSAR update is complete, the licensee may make changes to the programs described in its UFSAR supplement without prior Commission approval, provided that the licensee evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

G. The licensee's UFSAR supplement submitted pursuant to 10 CFR 54.21(d), as

-revised on March 27, 2000, describes certain future inspection activities to be completed before the period of extended operation. The licensee shall complete these activities no later than February 6, 2013.

Renewed License No. DPR-47 Revised by letter dated August 16, 2007

H. Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders
4. This renewed license is effective as of the date of issuance and shall expire at midnight on October 6, 2033.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By Roy P. Zimmerman Roy P. Zimmerman, Acting Director Office of Nuclear Reactor Regulation

Attachment:

1) Appendix A - Technical Specifications Renewed License No. DPR-47 Date of issuance: May 23, 2000 Renewed License No. DPR-47 Amendment No. 7-Revised by letter dated August 16, 2007

December 27, 1984; Decsmber 5, 1988; and August 21, 1989 subject to the following provision:

The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

E Physical Protection Duke Power Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualificalion and' safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains safeguards information protected under 10 CFR-73.21, is entitled: 'Duke Energy Physical Security Plan" submitted by letter dated September 8, 2004, and supplemented on September 30, 2004, October 15, 2004, October 21, 2004, and October 27, 2004.

F. In the update to the UFSAR required pursuant to 10 CFR 50.71 (e)(4) scheduled for July, 2001, the licensee shall update the UFSAR to include the UFSAR supplement submitted pursuant to 10 CFR 54.21(d) as revised on March 27, 2000. Until-the UFSAR update is complete, the licensee may make changes to the programs described in its UFSAR supplement without prior Commission approval, provided that the licensee evaluates each such change pursuant to the criteria set fbrth in 10 CFR 50.59 and othernuise complies with the requirements in that section.

G. The licensee's UFSAR supplement submitted pursuant to 10 CFR 54.21(d), as revised on March 27, 2000, describes certain future inspection activities to be completed before the period of extended operation. The licensee shall complete these activities no later than February 6, 2013.

Renewed License No. DPR-55 16, 2007 Revised by letter dated August

H. Mitiqation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders
4. This renewed license is effective as of the date of issuance and shall expire at midnight on July 19, 2034.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By Roy P. Zimmerman Roy P. Zimmerman, Acting Director Office of Nuclear Reactor Regulation

Attachment:

1) Appendix A - Technical Specifications Renewed License No. DPR-55 Date of issuance: May 23, 2000 Renewed License No. DPR-55 Amendment No. 356 Revised by letter dated August 16, 2007