Duke Energy Corporation - Supplemental Response to April 29, 2003, NRC Order Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors (EA-03-086)
ML042600048
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  
Issue date: 09/08/2004
From: Barron H
Duke Power Co
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
EA-03-086
Download: ML042600048 (2)


Text

-*

Duke SAFEGUARDS INFORMATION HENRY B. BARRON PabPower Group VP, Nuclear Generation and A Duke Energy Company Chief Nuclear Officer Duke Power EC07H / 526 South Church Street Charlotte, NC 28202-1802 Mailing Address:

PO Box 1006 EC07H Charlotte, NC 28201-1006 704 382 2200 September 8, 2004 704 382 6056 fax hbarron@duke-energy. corn U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Duke Energy Corporation Oconee Nuclear Station, Units 1, 2, and 3 NRC Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units I and 2 NRC Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 NRC Docket Nos. 50-413, 50-414 Supplemental Response to April 29, 2003, NRC Order Requiring Compliance With Revised Design Basis Threat For Operating Power Reactors (EA-03-086)

The U.S. Nuclear Regulatory Commission ("NRC") issued an Order dated April 29, 2003, requiring compliance with Revised Design Basis Threat ("Order EA-03-086") and other security related Orders (collectively "Orders") in Docket Nos. 50-269, 50-270, 50-287, Oconee Nuclear Station, 50-369, 50-370, McGuire Nuclear Station, and 50-413, 50-414, Catawba Nuclear Station. On June 2, 2003, pursuant to 10 CFR §50.4 and Conditions III A.1, B.l and B.2, Duke Energy Corporation ("Duke") submitted its response to Order EA-03-086. On April 27, 2004 Duke submitted a supplemental response to Order EA-03-086.

Duke responded to Requests for Additional Information ("RAI") in letters dated July, 7, 2004, July 13, 2004, July 22, 2004, August 9, 2004 (two separate letters, both dated August 9, 2004),

and August 12, 2004. In each letter, Duke made the following commitment, "upon resolution of this and forthcoming NRC RAI, Duke will submit a revision to the April 27, 2004 submittal." In accordance with 10 CFR §50.4, Duke hereby submits its second supplemental response to Order EA-03-086. This supplement includes as Attachment I, revision I to the Physical Security Plan submitted on April 27, 2004 and fulfills the commitments stated in the aforementioned responses to RAIs. Attachment II includes a discussion of changes made to the Physical Security Plan that were the subject of a telephone discussion between the NRC and Duke on August 26, 2004.

Attachment III is a synopsis of changes reflected in revision I of the Physical Security Plan.

SAFEGUARDS INFORMATION NOTE: T}IE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE www.dukepower.com PROTECTED ACCORDINGLY. UPON SEPARATION OF THIE ATTACIIMENT, THIS LETTER IS "DECONTROLLED."

I SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission September 8, 2004 Page 2 The attached information contains Safeguards Information and is subject to the restrictions described in 10 CFR §73.21.

Also, the attached information contains licensee physical protection information. Therefore, Duke requests that it be withheld from public disclosure pursuant to 10 CFR §2.390(d)(1).

If you have any questions regarding this submittal, please contact Randall D. Hart, Catawba Nuclear Station, at (803) 831-3622.

Sincerely, Henry B. Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer Attachments SAFEGUARDS INFORMATION NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."