MONTHYEARML0721200032007-08-0202 August 2007 Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 Tac No. MD4543) Project stage: Other ML0721300932007-08-0202 August 2007 Revised Pages of Facility Operating License No. DPR-43 Project stage: Other 2007-08-02
[Table View] |
|
---|
Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML17123A0282017-06-0707 June 2017 Enclosure 1 - KPS Amendment 220 Regarding Permanent Removal of Spent Fuel for the Spent Fuel Pool - LAR260 ML17052A5912017-05-0909 May 2017 KPS Amendment 219 - Removal of Cyber Security Requirements for Operating License ML16341C7912017-03-0202 March 2017 Enclosure 1 - Amendment to Facility Operating License ML16320A0442016-11-30030 November 2016 Amendment No. 217 ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML14237A0452015-02-13013 February 2015 Issuance of Amendment No. 215, Revise Operating License and Technical Specifications to the Permanently Defueled Technical Specifications Consistent with Permanent Cessation of Reactor Operation ML14008A2972014-06-23023 June 2014 Issuance of Amendment No. 213 - Deletion of License Conditions Associated with Extended Operations ML14111A2342014-06-0909 June 2014 Issuance of Amendment No. 212 Revise Operating License and Technical Specifications to the Permanently Defueled Technical Specifications Consistent with Permanent Cessation of Reactor Operation ML11192A2492011-08-31031 August 2011 Issuance of Amendment Regarding Cyber Security to Dominion Plants ML11102A0272011-07-29029 July 2011 Issuance of Amendment License Amendment Request to Change the Current Licensing Basis for Automatic Operation of Transformer Load Tap Changers ML1110105232011-04-29029 April 2011 Issuance of Amendment 208 Regarding Technical Specification Change Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection for 52.1 Effective Full Power Years ML0530403522011-02-24024 February 2011 Current Facility Operating License DPR-43, Tech Specs, Revised 10/07/2015 ML1101006002011-02-24024 February 2011 Renewed License ML1101005752011-02-24024 February 2011 Issuance of Renewed Facility Operating License No. DPR-043 for Kewaunee Power Station ML1033706912011-02-0202 February 2011 Part 080 ME2139 List of Acronyms and Abbreviations ML1020206622011-02-0202 February 2011 Issuance of Amendment for Conversion to Improved Technical Specifications with Beyond Scope Issues ML1002110292009-08-0303 August 2009 2009 Kewaunee Power Station Retake Examination Proposed Exam Files ML0912710592009-06-0101 June 2009 License Amendment No. 206, Containment Purge and Vent Isolation Valves Surveillance Requirement ML0905707102009-04-30030 April 2009 Issuance of Amendment No. 205 Seismic Analysis Methodology for the Auxiliary Building Crane ML0905708922009-04-27027 April 2009 Issuance of Amendment No. 204 Re. One-time Extension of the 15-Year Containment Integrated Leak Rate Test Interval ML0902805812009-02-0606 February 2009 Issuance of Amendment No. 203 Regarding Diesel Generator Fuel Storage Tank Capacity Requirement ML0833607832009-01-0909 January 2009 Issuance of Amendment Steam Line Isolation Function Applicability (Tac No. MD8544) ML0832906532008-12-30030 December 2008 License Amendment, Issuance of Amendment No. 201 Shield Building and Auxiliary Building Special Ventilation Train Filter Heater Requirements ML0829710792008-11-20020 November 2008 Issuance of Amendment to Relocate Spent Fuel Pool Crane Requirements from the Technical Specifications to the Technical Requirements Manual ML0829405472008-11-0606 November 2008 License Amendment, Increased the Minimum Required Safety Injection Accumulator Boron Concentration from 1900 parts-per-million (Ppm) to 2400 Ppm ML0816201402008-07-0202 July 2008 Issuance of Amendment Deletion of License Condition on Fuel Burnup ML0804603632008-03-28028 March 2008 Issuance of Amendment Regarding Nuclear Instrumentation System Permissive Setpoints ML0807701792008-03-28028 March 2008 Issuance of Amendments Licensing Basis Design Criteria Associated with Internal Flooding ML0728802892007-10-31031 October 2007 License Amendment Regarding Relocation of Technical Specifications Requirements ML0721300932007-08-0202 August 2007 Revised Pages of Facility Operating License No. DPR-43 ML0711100062007-05-18018 May 2007 Issuance of Amendment Refueling Water Storage Tank Boron Concentration ML0712001862007-05-0101 May 2007 Issuance of License Amendment 191 Regarding Emergency Diesel Generator Rated Load Testing ML0704300202007-03-0808 March 2007 Radiological Accident Analysis ML0631800362006-12-14014 December 2006 License Amendment 189 Regarding Referencing the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for Operation and Maintenance of Nuclear Power Plants ML0617002082006-07-17017 July 2006 Issuance of Amendment Steam Generator Tube Integrity ML0616402862006-07-12012 July 2006 Issuance of Amendment Surveillance Interval Extension ML0532100822005-11-18018 November 2005 Correction to Amendment 186 ML0521504282005-10-0404 October 2005 Issuance of License Amendment 186 Regarding Technical Specification Changes for Radioactive Effluents Control Program and Off-Site Dose Calculation Manual ML0518801062005-07-0505 July 2005 Issuance of Conforming Amendment Re Transfer of Facility Operating License from Nuclear Management Company, Wisconsin Public Service Corp and Wisconsin Power and Light Company to Dominion Energy Kewaunee, Inc ML0517100302005-06-21021 June 2005 Emergency License Amendment, Revises the TSs to Remove the Requirement to Have a Containment Spray Pump Suction Flow Path from the Containment Sump ML0516000912005-06-20020 June 2005 Issuance of Amendment Auxiliary Feedwater System ML0503902742005-04-0606 April 2005 Issuance of License Amendment 182 Relocation of Surveillance Requirements ML0505407072005-03-24024 March 2005 License Amendment, Revised Technical Specification Rod Position Indication ML0435001062005-02-15015 February 2005 Issuance of License Amendment 180 Administrative Changes to Technical Specifications ML0433800022004-12-22022 December 2004 Issuance of Amendment Deletion of Requirements for Submittal of Occupational Radiation Exposure Reports, Reports of Challenges to and Failures of the Pressurizer Power Operated Relief Valves and Safety Valves ML0431200302004-10-29029 October 2004 Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat... ML0514402972004-10-26026 October 2004 Revision to Emergency Action Levels, Facility Operating License as Amended Through October 21, 2004 Document ML0426400982004-10-0505 October 2004 License Amendment, Revises TS 3.3.a.2.B, by Extending Completion Time from 1 Hour to 24 Hours for an Accumulator That Is Inoperable for Any Reason Other than Failure to Meet Minimum Boron Concentration Requirements ML0416100952004-09-24024 September 2004 Issuance of Amendment No. 177 Re. Revision of TS 3.3.e, Service Water System ML0422300682004-09-22022 September 2004 License Amendment No. 176, Revise TS 3.10.f.2 to Add an Allowed Outage Time for the Individual Rod Position Indication (Irpi) System of 24 Hours with More than One Irpi Group Inoperable & Adds the Definition of Immediately to TS Section 1.0 2017-06-07
[Table view] |
Text
REVISED PAGES OF FACILITY OPERATING LICENSE NO. DPR-43 DOCKET NO. 50-305 KEWAUNEE POWER STATION Replace the following page of the Facility Operating License No. DPR-43 with the attached revised pages. The changed area is identified by a marginal line.
REMOVE INSERT Page 4 Page 4
--- Page 5 Page 4a Page 5a
(6) Steam Generator Upper Lateral Supports The design of the steam generator upper lateral supports may be modified by reducing the number of snubbers from four (4) to one (1) per steam generator.
(7) Deleted (8) Operator Actions The auxiliary feedwater system local manual operator actions as described in the License Amendment Request submitted May 5, 2005, and supplemented on June 9, 2005, shall be eliminated no later than completion of Kewaunee refueling outage R-29.
(9) Surveillance Test Interval Relaxation In lieu of the specified frequencies, Dominion Energy Kewaunee, Inc. may complete the surveillance requirements noted in Table 2.C.(9) on page 4a during the fall 2006 refueling outage, but not later than October 7, 2006.
(10) Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(a) Fire fighting response strategy with the following elements:
- 1. Pre-defined coordinated fire response strategy and guidance
- 2. Assessment of mutual aid fire fighting assets
- 3. Designated staging areas for equipment and materials
- 4. Command and control
- 5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
- 1. Protection and use of personnel assets
- 2. Communications
- 3. Minimizing fire spread
- 4. Procedures for implementing integrated fire response strategy
- 5. Identification of readily-available pre-staged equipment
- 6. Training on integrated fire response strategy
- 7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
- 1. Water spray scrubbing
- 2. Dose to onsite responders Amendment No. 187 Revised by letter dated August 21, 2006 Revised by letter dated August 2, 2007 4
D. The licensee shall comply with applicable effluent limitations and other limitations and monitoring requirements, if any, specified pursuant to Section 401(d) of the Federal Water Pollution Control Act Amendments of 1972.
E. This license is effective as of the date of issuance, and shall expire at midnight on December 21, 2013.
FOR THE ATOMIC ENERGY COMMISSION Original Signed by A. Giambusso, Deputy Director for Reactor Projects Directorate of Licensing
Attachment:
Appendices A and B - Technical Specifications Date of Issuance: December 21, 1973 Amendment No. 187 Revised by letter dated August 21, 2006 Revised by letter dated August 2, 2007 5
Table 2.C.(9)
Surveillance Table Item Title Requirement Number Table 4.1-1 5 Reactor Coolant Flow - Calibration Table 4.1-1 6 Pressurizer Water Level - Calibration Table 4.1-1 7 Pressurizer Pressure - Calibration Table 4.1-1 11 a Steam Generator Low Level - Calibration Table 4.1-1 11 b Steam Generator High Level - Calibration Table 4.1-1 21 Containment Sump Level - Test Table 4.1-1 30 Fore Bay Water Level - Test Table 4.1-1 33 PORV Block Valve Position Indicator - Calibration Table 4.1-1 36 Reactor Coolant System Subcooling Monitor - Calibration and Test Table 4.1-1 42 Steam Generator Level (Wide Range) - Calibration Table 4.1-3 4 Containment Isolation Trip - Test 4.4.c.1 .b Shield Building Ventilation System Tests 4.5.a.1 Safety Injection System Tests 4.5.a.2 Containment Vessel Internal Spray System 4.5.a.3 Containment Fancoil Units Tests 4.5.b.2.F Residual Heat Removal System valve interlocks 4.6.a.2 Automatic start of each diesel generator, load shedding, and restoration to operation of particular vital equipment 4.6.a.3 Diesel Generator Inspection 4.6.a.4 Diesel Generator Load Rejection Test 4.14 Testing And Surveillance Of Shock Suppressors (Snubbers) 4.17.a.2 Control Room Postaccident Recirculation System 6.12.b System Integrity Program Integrated Leak Tests Amendment No, 187 Revised by letter dated August 21, 2006 Revised by letter dated August 2, 2007 5a