Revised Pages of Facility Operating License No. DPR-43
ML072130093
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 08/02/2007
From:
NRC/NRR/ADRO/DORL/LPLIII-1
To:
Milano P, NRR/DORL/LPLIII-1, 415-1457
Shared Package
ML072120002 List:
References
EA-02-026, TAC MD4543
Download: ML072130093 (4)


Text

REVISED PAGES OF FACILITY OPERATING LICENSE NO. DPR-43 DOCKET NO. 50-305 KEWAUNEE POWER STATION Replace the following page of the Facility Operating License No. DPR-43 with the attached revised pages. The changed area is identified by a marginal line.

REMOVE INSERT Page 4 Page 4

--- Page 5 Page 4a Page 5a

(6) Steam Generator Upper Lateral Supports The design of the steam generator upper lateral supports may be modified by reducing the number of snubbers from four (4) to one (1) per steam generator.

(7) Deleted (8) Operator Actions The auxiliary feedwater system local manual operator actions as described in the License Amendment Request submitted May 5, 2005, and supplemented on June 9, 2005, shall be eliminated no later than completion of Kewaunee refueling outage R-29.

(9) Surveillance Test Interval Relaxation In lieu of the specified frequencies, Dominion Energy Kewaunee, Inc. may complete the surveillance requirements noted in Table 2.C.(9) on page 4a during the fall 2006 refueling outage, but not later than October 7, 2006.

(10) Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders Amendment No. 187 Revised by letter dated August 21, 2006 Revised by letter dated August 2, 2007 4

D. The licensee shall comply with applicable effluent limitations and other limitations and monitoring requirements, if any, specified pursuant to Section 401(d) of the Federal Water Pollution Control Act Amendments of 1972.

E. This license is effective as of the date of issuance, and shall expire at midnight on December 21, 2013.

FOR THE ATOMIC ENERGY COMMISSION Original Signed by A. Giambusso, Deputy Director for Reactor Projects Directorate of Licensing

Attachment:

Appendices A and B - Technical Specifications Date of Issuance: December 21, 1973 Amendment No. 187 Revised by letter dated August 21, 2006 Revised by letter dated August 2, 2007 5

Table 2.C.(9)

Surveillance Table Item Title Requirement Number Table 4.1-1 5 Reactor Coolant Flow - Calibration Table 4.1-1 6 Pressurizer Water Level - Calibration Table 4.1-1 7 Pressurizer Pressure - Calibration Table 4.1-1 11 a Steam Generator Low Level - Calibration Table 4.1-1 11 b Steam Generator High Level - Calibration Table 4.1-1 21 Containment Sump Level - Test Table 4.1-1 30 Fore Bay Water Level - Test Table 4.1-1 33 PORV Block Valve Position Indicator - Calibration Table 4.1-1 36 Reactor Coolant System Subcooling Monitor - Calibration and Test Table 4.1-1 42 Steam Generator Level (Wide Range) - Calibration Table 4.1-3 4 Containment Isolation Trip - Test 4.4.c.1 .b Shield Building Ventilation System Tests 4.5.a.1 Safety Injection System Tests 4.5.a.2 Containment Vessel Internal Spray System 4.5.a.3 Containment Fancoil Units Tests 4.5.b.2.F Residual Heat Removal System valve interlocks 4.6.a.2 Automatic start of each diesel generator, load shedding, and restoration to operation of particular vital equipment 4.6.a.3 Diesel Generator Inspection 4.6.a.4 Diesel Generator Load Rejection Test 4.14 Testing And Surveillance Of Shock Suppressors (Snubbers) 4.17.a.2 Control Room Postaccident Recirculation System 6.12.b System Integrity Program Integrated Leak Tests Amendment No, 187 Revised by letter dated August 21, 2006 Revised by letter dated August 2, 2007 5a