July 20, 2007 Mr. Jack Davis, Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

FERMI POWER PLANT, UNIT 2 NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Davis:

On October 1, 2007, the NRC will begin the baseline inservice inspection (NRC Procedure 71111.08) at the Fermi Power Plant, Unit 2. This on-site inspection is scheduled to be performed October 1 through 4, 2007.

Experience has shown that this inspection is resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group identifies information necessary to ensure that the inspector is adequately prepared. The second group identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. R. Salmon of your organization. If there are any questions about this inspection or the material requested, please contact the inspector Mr. M. Holmberg at (630) 829-9748.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's

J. Davis document system (ADAMS), is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-341 License No. NPF-43

Enclosure:

INSERVICE INSPECTION DOCUMENT REQUEST cc w/encl:

J. Plona, Vice President, Nuclear Generation K. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators State Liaison Officer, State of Michigan Wayne County Emergency Management Division

J. Davis document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-341 License No. NPF-43

Enclosure:

INSERVICE INSPECTION DOCUMENT REQUEST cc w/encl:

J. Plona, Vice President, Nuclear Generation K. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators State Liaison Officer, State of Michigan Wayne County Emergency Management Division DOCUMENT NAME: C:\\FileNet\\ML072010441.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII N

NAME MHolmberg: ls DHills DATE 07/19/07 07/20/07 OFFICIAL RECORD COPY

Letter to Mr. J. Davis from Mr. D. E. Hills dated July 20, 2007.

SUBJECT:

FERMI POWER PLANT UNIT 2 NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION:

TEB LXR1 AXM8 RidsNrrDirsIrib GEG KGO RMM3 CAA1 DRPIII DRSIII PLB1 TXN

INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 1

Inspection Dates:

October 1 through 4, 2007 Inspection Procedure:

IP 71111.08, Inservice Inspection Inspector:

Mel Holmberg (630) 829-9748 A.

Information Requested for the In-office Preparation Week The following information in hard copy (or electronic format CD - preferred), in care of Mr. M. Holmberg by September 17, 2007, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The inspector will select specific items from the information requested below, and request a list of additional documents needed on-site for your staff. If you have any questions regarding this information, please call the inspector as soon as possible.

1)

A detailed schedule of nondestructive examinations (NDE) planned for Class 1 and 2 systems, and containment, performed as part of your ASME Code, ISI Program during the scheduled inspection week.

2)

A copy of the NDE procedures used to perform the examinations identified in A.1 (including calibration procedures). For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI of the ASME Code, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers).

3)

A copy of ASME Section XI, Code Relief Requests applicable to the examinations identified in A(1), and if a risk based ISI program has been implemented, please provide the ADAMs ML No. for the NRC safety evaluation (and related NRC correspondence) which approved this program.

4)

A list identifying NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, visual (VT-1, VT-2, VT-3)), which have identified relevant indications on Code Class 1 and 2 systems, since the beginning of the last refueling outage.

5)

List with short description of the welds in Code Class 1 and 2 systems, which have been fabricated due to component repair/replacement activities since the beginning of the last Unit 2 refueling outage and identify the system, weld number, and reference applicable documentation.

INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 2

6)

If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the inspection period, provide a detailed description of the welds to be examined, and the extent of the planned examination.

7)

List with description of ISI related issues (e.g., piping, vessel or support degradation/damage or errors in piping, vessel or support examinations) entered into your corrective action system (for either Unit) since the beginning of the last refueling outage. Please provide the key words used in searching the corrective action data base.

B.

Information to be Provided On-site to the Inspector at the Entrance Meeting (October 1, 2007) 1)

For welds selected by the inspector from A.5 above, provide copies of the following documents:

(a)

Document of the weld number and location (e.g., system, train, branch);

(b)

Document with a detail of the weld construction; (c)

Applicable Code Edition and Addenda for weldment; (d)

Applicable Code Edition and Addenda for welding procedures; (e)

Applicable weld procedures (WPS) used to fabricate the welds; (f)

Copies of procedure qualification records (PQRs) supporting the WPS on selected welds; (g)

Copies of mechanical test reports identified in the PQRs above; and (h)

Copies of the nonconformance reports for the selected welds.

2)

For the nondestructive examination reports with relevant indications on Code Class 1 and 2 systems selected by the inspector from A.4 above, provide a copy of the examination records and associated corrective action documents.

3)

For the ISI related corrective action issues selected by the inspector from A.7 above, provide a copy of the corrective actions and supporting documentation.

4)

Provide documentation that the ISI Program manager has reviewed NDE personnel certification records for personnel performing NDE during the current refueling outage. Also for each NDE UT examiner qualified to Appendix VII and VIII of Section XI provide the records (with dates) for the most recent completion of their practical hands on training.

INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 3

5)

Copy of the most recently completed Section XI reactor coolant system pressure test, documenting the results of VT-2 inspections.

6)

Ready access (e.g., copies provided to the inspector for use during the inspection at the on-site inspection location) to the Editions of the ASME Code (Sections V, IX, and XI) applicable to the inservice inspection program and the repair/replacement program.