MONTHYEARML0619901172006-07-12012 July 2006 Discharge Monitoring Report for June 2006 Project stage: Request ML0631304422006-11-22022 November 2006 RAI, Technical Specification Change Request for Ultimate Heat Sink Project stage: RAI ML0634700292006-12-0707 December 2006 Technical Specifications (TS) Change 06-03 Ultimate Heat Sink (UHS) Temperature Increase and Elevation Changes Supplemental Information Project stage: Supplement ML0705301432007-01-26026 January 2007 Units 1 and 2 - Response to Request for Additional Information (RAI) for Technical Specifications (TS) Change 06-03 Project stage: Response to RAI ML0711601902007-04-26026 April 2007 Memo for Thomas H. Boyce - Staff Hydrologic Technical Evaluation Report for the Sequoyah Nuclear Plant, Units 1 & 2- Technical Specification Change Request for Ultimate Heat Sink Temperature (Tac No. MD2621) Project stage: Other ML0713502462007-05-0808 May 2007 Technical Specifications Change 06-03 Ultimate Heat Sink Temperature Increase and Elevation Changes - Supplemental Information No. 2 Project stage: Supplement ML0718305852007-07-0505 July 2007 Request for Additional Information Regarding Ultimate Heat Sink Project stage: RAI ML0720103892007-07-20020 July 2007 Technical Specifications (TS) Change 06-03 Ultimate Heat Sink (UHS) Temperature Increase and Elevation Changes - Request for Information (RAI) No. 2 Extension Project stage: Request ML0722903262007-08-14014 August 2007 Technical Specifications (TS) Change 06-03 Ultimate Heat Sink (UHS) Temperature Increase and Elevation Changes - Request for Information (RAI) No. 2 (TAC Nos. MD2621 & MD2622) Project stage: Request ML0723602942007-08-22022 August 2007 Units 1 and 2 - Technical Specifications (TS) Change 06-03 Ultimate Heat Sink (UHS) Temperature Increase and Elevation Changes - Request for Information (RAI) No. 2 Supplement Project stage: Supplement ML0727003212007-09-27027 September 2007 Memo: Temperature Issue for the Sequoyah Nuclear Plant, Units 1 & 2 - Technical Specification Change Request for Ultimate Heat Sink Temperature Increase and Elevation Changes Project stage: Other ML0724200432007-09-28028 September 2007 License Amendment, Increased Temperature and Level Limits of Ultimate Heat Sink Project stage: Other ML0727404672007-09-28028 September 2007 Technical Specifications, Increased Temperature and Level Limits of Ultimate Heat Sink Project stage: Other ML0733807402007-12-10010 December 2007 Corrected Pages to Safety Evaluation for Amendments Regarding Increased Temperature and Level Limits of Ultimate Heat Sink Project stage: Approval 2007-05-08
[Table View] |
Text
July, 20 2007 TVA-SQN-TS-06-03 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Gentlemen:
In the Matter of )
Docket Nos. 50-327 Tennessee Valley Authority )
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - UNITS 1 AND 2 - TECHNICAL SPECIFICATIONS (TS) CHANGE 06-03 ULTIMATE HEAT SINK (UHS)
TEMPERATURE INCREASE AND ELEVATION CHANGES - REQUEST FOR INFORMATION (RAI) NO. 2 EXTENSION (TAC NOS. MD2621 AND MD2622)
References:
- 1. NRC letter to TVA dated July 5, 2007, Sequoyah Nuclear Plant, Units 1 and 2 -
Request for Additional Information Regarding Ultimate Heat Sink (TAC Nos.
MD2621 and MD2622)
- 2. TVA Letter to NRC dated, July, 12, 2006, Sequoyah Nuclear Plant (SQN) - Units 1 and 2 - Technical Specifications (TS) Change 06-03 Ultimate Heat Sink (UHS) Temperature Increase and Elevation Changes Reference 1 requested additional information regarding the TVA proposed license amendment for revising the SQN ultimate heat sink limiting condition of operation (LCO) under Reference 2. Several discussions have been held between NRC and TVA regarding the depth of these questions. On July 18, 2007, NRC staff provided TVA personnel additional clarification of select questions. In light of these
U.S. Nuclear Regulatory Commission Page 2 July 20, 2007 clarifications, additional time will be needed to address the postulated dual unit shutdown impact associated with UHS licensing basis and limiting fouling factors for emergency diesel generators. This has been coordinated with SQNs NRC Project Manager, Brendan Moroney, and agreement was reached to provide our response by August 20, 2007.
If you have any questions about this change, please contact me at 843-7170.
Sincerely, Original signed by:
Glenn W. Morris Manager, Site Licensing and Industry Affairs cc: Mr. Brendan T. Moroney, Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop 08G-9a One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Lawrence E. Nanney, Director Division of Radiological Health Third Floor L&C Annex 401 Church Street Nashville, Tennessee 37243-1532