OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
July 9, 2007
Stewart B. Minahan,
Vice President-Nuclear and CNO
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - NRC SECURITY TEAM INSPECTION
REPORT 05000298/2007401
Dear Mr. Minahan:
On June 7, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a security
baseline inspection at your Cooper Nuclear Station. The inspection covered one or more of the
key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The
enclosed inspection report documents the inspection results, which were discussed on
June 07, 2007, with Mr. Michael J. Colomb, General Manager, Plant Operations, and other
members of your staff.
The inspection examined activities conducted under your license as they relate to security and
compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel.
This report documents one finding of very low security significance (i.e. Green as determined by
the Physical Protection Significance Determination Process). The deficiency was promptly
corrected or compensated for, and the plant was in compliance with applicable physical
protection and security requirements within the scope of this inspection before the inspectors
left the site.
The finding was NRC identified.
NRC is treating this violation as a noncited violation consistent with Section VI.A.1 of the NRC
Enforcement Policy because of the very low security significance of the violation and because it
was entered into your corrective action program. If you contest this non-cited violation, you
should provide a response within 30 days of the date of this inspection report, with the basis for
Nebraska Public Power District
-2-
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk,
Washington DC 20555-0001; with copies to the Regional Administrator Region IV; the Director,
Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC
20555-0001; and the NRC Resident Inspector at the Cooper Nuclear Station facility.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room). However, because of the security-related concerns
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters
enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for
your response, if any. This practice will ensure that your response will not be made available
electronically for public inspection in the NRC Public Document Room or from the NRCs
document system, ADAMS. If Safeguards Information is necessary to provide an acceptable
response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark
your entire response Security-Related Information-Withhold Under 10 CFR 2.390. and follow
the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Michael P. Shannon, Chief
Plant Support Branch
Division of Reactor Safety
Docket: 50-298
License: DPR-46
Nonpublic Enclosure:
Inspection Report 05000298/2007401
w/Attachment: Supplemental Information
cc w/o enclosure:
Gene Mace
Nuclear Asset Manager
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
Nebraska Public Power District
-3-
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
John C. McClure, Vice President
and General Counsel
Nebraska Public Power District
P.O. Box 499
Columbus, NE 68602-0499
P. V. Fleming, Licensing Manager
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
Ronald D. Asche, President
and Chief Executive Officer
Nebraska Public Power District
1414 15th Street
Columbus, NE 68601
Kevin V. Chambliss, Director of
Nuclear Safety Assurance
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
H. Floyd Gilzow, State Liaison Officer
Missouri Department of Natural Resources
Lewis and Clark State Office Building
1101 Riverside Drive
Jefferson City, MO 65101