Category:Inspection Report Correspondence
MONTHYEARML19158A2952019-06-0707 June 2019 Notification of Evaluation of Changes, Tests, and Experiments Inspection (05000298/2019003) and Request for Information ML18190A2032018-07-0606 July 2018 Notification of NRC Triennial Heat Sink Performance Inspection (05000298/2018003) and Request for Information IR 05000298/20164052016-07-19019 July 2016 Cover Letter for NRC Security Inspection Report 05000298/2016405 IR 05000298/20154022016-03-0202 March 2016 Non-Public Security Inspection Plan for Cooper Nuclear Station (NRC Physical Security Inspection Report Number 05000298/2015402) IR 05000298/20154032015-04-0303 April 2015 IR 05000298/2015403, on 03/27/2015, Cooper Nuclear Station - NRC Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7. IR 05000298/20134042013-05-28028 May 2013 NRC Security Inspection Report 05000298-13-404. Cover Letter IR 05000298/20105012011-01-10010 January 2011 IR 05000298-10-501, on 12/31/2010, Cooper Nuclear Station - NRC Annual Emergency Preparedness IR 05000498/20105012011-01-10010 January 2011 IR 05000498-10-501 and 05000499-10-501, on 12/31/2010, South Texas Project Electric Generating Station, Unit 1 and 2 - NRC Emergency Preparedness Annual IR 05000298/20094012010-03-26026 March 2010 NRC Physical Security Annual Inspection Report 05000298-09-401 ML0907211072009-03-12012 March 2009 Notification of NRC Initial Operator Licensing Examination 05000298-09-301 ML0805605062008-02-25025 February 2008 IR 05000298-08-003, 04/15/2008 - 04/18/2008, Cooper Nuclear Station - Notification of Inspection and Request for Information IR 05000298/20075012008-02-21021 February 2008 IR 05000298-07-501, on 12/31/2007, 01/01/2007, for Cooper Nuclear Station - Emergency Preparedness Annual Inspection Report IR 05000298/20074022007-12-12012 December 2007 IR 05000298-07-402, on 11/29/2007, Cooper Nuclear Station - NRC Physical Security Inspection Report ML0719200742007-07-0909 July 2007 IR 05000298-07-401, on 06/04/2007 - 06/07/2007, for Cooper Nuclear Station, Security Baseline Inspection, Security Training - Letter Only IR 05000298/20060082006-08-14014 August 2006 IR 05000298-06-008 07/14/2006 Cooper Nuclear Station - non-SGI Letter Only ML0518002512005-06-29029 June 2005 IR 05000298-05-002 - Cooper Nuclear Station - Reply to Denial of Noncited Violation IR 05000298/20050012005-03-0202 March 2005 Annual Assessment Letter - Cooper Nuclear Station (IR 05000298-05-001) ML0226604592002-09-20020 September 2002 IR 05000298-02-07 Appendix to Cooper Nuclear Station Supplemental Inspection IR 05000298/20023012002-09-0505 September 2002 IR 05000298-02-301, on August 5-9, 2002; Nebraska Public Power District; Cooper Nuclear Station IR 05000298/20010082002-05-0303 May 2002 IR 05000298/2001-008, Cooper Nuclear Station, Inspection on 12/30/2001 - 04/06/2002, Related to Mitigating System, Occupational Radiation Safety & Security Posture. Non-Cited Violations Noted IR 05000298/20010072002-02-0404 February 2002 IR 05000298/2001-007; 10/07/2001-12/29/2001; Nebraska Public Power District; Cooper Nuclear Station. Integrated Resident/Regional Report; Fire Protection, Operability Evaluations, Surveillance Testing, Occupational Radiation Safety. Non-cit IR 05000298/20010112002-01-0909 January 2002 IR 05000298/2001-011, on 11/12 Through 12/11/2001, Nebraska Public Powers District, Cooper Nuclear Station, Supplemental Inspection for a Degraded Emergency Preparedness Cornerstone in the Reactor Safety Strategic Performance Area 2019-06-07
[Table view] Category:Letter
MONTHYEARML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information IR 05000298/20224022022-09-29029 September 2022 NRC Security Inspection Report 05000298/2022402 (Full Report) IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) IR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20220022022-07-28028 July 2022 Integrated Inspection Report 05000298/2022002 ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements IR 05000298/20224012022-06-29029 June 2022 Security Baseline Inspection Report 05000298/2022401 IR 05000298/20224032022-06-28028 June 2022 Security Baseline Inspection Report 05000298/2022403 IR 05000298/20220102022-06-16016 June 2022 Triennial Fire Protection Inspection Report 05000298/2022010 ML22140A1612022-06-0808 June 2022 Proposed Inservice Inspection Alternative RR5-01 Revision 1 ML22147A1122022-06-0101 June 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022301 ML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 IR 05000298/20220012022-04-28028 April 2022 Integrated Inspection Report 05000298/2022001 IR 05000298/20224042022-04-13013 April 2022 Material Control and Accounting Program Inspection Report 05000298/2022404 - (Public) ML22084A6032022-04-0404 April 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection 05000298/2022002 and Request for Information ML22090A2892022-04-0101 April 2022 John Larson'S Invitation to Participate in the 8th Nuclear Regulatory Commission'S Workshop on Vendor Oversight ML22045A0012022-03-31031 March 2022 Proposed Inservice Inspection Alternative RI5- 02 Revision 3 IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) IR 05000298/20210042022-01-24024 January 2022 Integrated Inspection Report 05000298/2021004 ML21350A0582021-12-21021 December 2021 Withdrawal of an Amendment Request ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements 2024-01-03
[Table view] Category:Inspection Report
MONTHYEARIR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information IR 05000298/20224022022-09-29029 September 2022 NRC Security Inspection Report 05000298/2022402 (Full Report) IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) IR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20220022022-07-28028 July 2022 Integrated Inspection Report 05000298/2022002 IR 05000298/20224012022-06-29029 June 2022 Security Baseline Inspection Report 05000298/2022401 IR 05000298/20224032022-06-28028 June 2022 Security Baseline Inspection Report 05000298/2022403 IR 05000298/20220102022-06-16016 June 2022 Triennial Fire Protection Inspection Report 05000298/2022010 IR 05000298/20220012022-04-28028 April 2022 Integrated Inspection Report 05000298/2022001 IR 05000298/20224042022-04-13013 April 2022 Material Control and Accounting Program Inspection Report 05000298/2022404 - (Public) ML22084A6032022-04-0404 April 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection 05000298/2022002 and Request for Information IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) IR 05000298/20210042022-01-24024 January 2022 Integrated Inspection Report 05000298/2021004 IR 05000298/20210032021-11-0404 November 2021 Integrated Inspection Report 05000298/2021003 IR 05000298/20210112021-10-19019 October 2021 CNS2021011 TI194 RPT Jfd, Cooper Nuclear Station - Temporary Instruction 2515/194 Report 05000298/2021011 IR 05000298/20214022021-10-12012 October 2021 Security Baseline Inspection Report 05000298/2021402 IR 05000298/20210052021-09-0101 September 2021 CNS Mid-Cycle Inspection Plan Transmittal Letter for Cooper Nuclear Station (Report 05000298/2021005) IR 05000298/20210022021-08-0909 August 2021 Integrated Inspection Report 05000298/2021002 IR 05000298/20213012021-07-29029 July 2021 NRC Retake Examination Report 05000298/2021301 IR 05000298/20210122021-07-27027 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000298/2021012 IR 05000298/20210102021-06-0707 June 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000298/2021010 IR 05000298/20210012021-05-0505 May 2021 CNS2021001-IR-AS, Cooper Nuclear Station - Integrated Inspection Report 05000298/2021001 IR 05000298/20214012021-05-0404 May 2021 Security Baseline Inspection Report 05000298/2021401 IR 05000298/20200062021-03-0303 March 2021 Annual Assessment Letter for Cooper (Report 05000298/2020006) IR 05000298/20200042021-02-0303 February 2021 Integrated Inspection Report 05000298/2020004 ML21026A3112021-01-27027 January 2021 Notification of NRC Design Bases Assurance Inspection (Team) (NRC Inspection Report 05000298/2021010) and Initial Request for Information IR 05000298/20203022020-11-18018 November 2020 NRC Examination Report 05000298/2020302 IR 05000298/20200032020-11-0202 November 2020 Integrated Inspection Report 05000298/2020003 and Independent Spent Fuel Storage Installation Inspection Report 07200066/2020001 IR 05000298/20204202020-10-0505 October 2020 Cover Letter for Cooper Nuclear Station - Security Inspection Report 05000298/2020420 2020 IR 05000298/20204112020-09-17017 September 2020 Security Baseline Inspection Report 05000298/2020411 IR 05000298/20203012020-09-15015 September 2020 NRC Examination Report 05000298/2020301 IR 05000298/20200052020-09-0101 September 2020 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2020005) IR 05000298/20200022020-07-22022 July 2020 Integrated Inspection Report 05000298/2020002 IR 05000298/20204102020-07-21021 July 2020 Security Baseline Inspection Report 05000298/2020410 2023-09-01
[Table view] |
See also: IR 05000298/2007401
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
July 9, 2007
Stewart B. Minahan,
Vice President-Nuclear and CNO
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
SUBJECT: COOPER NUCLEAR STATION - NRC SECURITY TEAM INSPECTION
REPORT 05000298/2007401
Dear Mr. Minahan:
On June 7, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a security
baseline inspection at your Cooper Nuclear Station. The inspection covered one or more of the
key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The
enclosed inspection report documents the inspection results, which were discussed on
June 07, 2007, with Mr. Michael J. Colomb, General Manager, Plant Operations, and other
members of your staff.
The inspection examined activities conducted under your license as they relate to security and
compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel.
This report documents one finding of very low security significance (i.e. Green as determined by
the Physical Protection Significance Determination Process). The deficiency was promptly
corrected or compensated for, and the plant was in compliance with applicable physical
protection and security requirements within the scope of this inspection before the inspectors
left the site.
The finding was NRC identified.
NRC is treating this violation as a noncited violation consistent with Section VI.A.1 of the NRC
Enforcement Policy because of the very low security significance of the violation and because it
was entered into your corrective action program. If you contest this non-cited violation, you
should provide a response within 30 days of the date of this inspection report, with the basis for
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Nebraska Public Power District -2-
your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk,
Washington DC 20555-0001; with copies to the Regional Administrator Region IV; the Director,
Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC
20555-0001; and the NRC Resident Inspector at the Cooper Nuclear Station facility.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room). However, because of the security-related concerns
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters
enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for
your response, if any. This practice will ensure that your response will not be made available
electronically for public inspection in the NRC Public Document Room or from the NRCs
document system, ADAMS. If Safeguards Information is necessary to provide an acceptable
response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark
your entire response Security-Related Information-Withhold Under 10 CFR 2.390. and follow
the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Michael P. Shannon, Chief
Plant Support Branch
Division of Reactor Safety
Docket: 50-298
License: DPR-46
Nonpublic Enclosure:
Inspection Report 05000298/2007401
w/Attachment: Supplemental Information
cc w/o enclosure:
Gene Mace
Nuclear Asset Manager
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Nebraska Public Power District -3-
John C. McClure, Vice President
and General Counsel
Nebraska Public Power District
P.O. Box 499
Columbus, NE 68602-0499
P. V. Fleming, Licensing Manager
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
Ronald D. Asche, President
and Chief Executive Officer
Nebraska Public Power District
1414 15th Street
Columbus, NE 68601
Kevin V. Chambliss, Director of
Nuclear Safety Assurance
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
H. Floyd Gilzow, State Liaison Officer
Missouri Department of Natural Resources
Lewis and Clark State Office Building
1101 Riverside Drive
Jefferson City, MO 65101
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION