MONTHYEARML0710301382007-04-0404 April 2007 Submittal of February 23, 2007 Letter from Nuclear Electric Insurance Limited Project stage: Request ML0709502932007-04-0404 April 2007 FENOC Submittal of 2/23/07 Letter from Nuclear Electric Insurance Limited (NEIL) Project stage: Request ML0712102852007-04-30030 April 2007 G20070297 - 04/30/2007 David A. Lochbaum Ltr. Petition Pursuant to 2.206 - Protection Against Control Rod Drive Mechanism (CRDM) Nozzle Leakage Fast Corrosion Scenario or More Firstenergy Falsehoods Project stage: Other ML0713401932007-05-10010 May 2007 G20070297 - David Lochbaum Ltr. Re Supplement to Petition Pursuant to Section 2.206 - Protection Against Control Rode Drive Mechanism (CRDM) Nozzle Leakage Fast Corrosion Scenario or More Firstenergy Falsehoods Project stage: Supplement ML0713002452007-05-18018 May 2007 G20070297 - Letter to Mr. D. Lochbaum Protection Against Control Rod Drive Mechanism Nozzle Leakage Fast Corrosion Scenario or More Firstenergy Falsehoods - Davis-Besse Project stage: Other ML0715203432007-06-0707 June 2007 Notice of Meeting with Union of Concerned Scientists Re Davis-Besse Nuclear Power Station 10 CFR 2.206 Petition Concerning Protection Against Control Rod Drive Mechanism (CRDM) Nozzle Leakage Fast Corrosion Scenario Project stage: Request ML0718400042007-06-18018 June 2007 Transcript of Meeting with Union of Concerned Scientists Requesting Action Under 10CFR2.206 Regarding Protection Against Control Rod Drive Mechanism Nozzle Leakage Fast Corrosion Scenario Project stage: Request ML0717800282007-06-18018 June 2007 Union of Concerned Scientists' (Petitioner'S) Slides from June 18, 2007 Public Meeting with 2.206 Petition Review Board Exponent Report on 2002 RPV Head Corrosion Event at Davis-Besse Project stage: Request ML0718704432007-07-12012 July 2007 G20070297 - Mr. David Lochbaum Ltr Davis-Besse - 2.206 - Protection Against CRDM Nozzle Leakage Fast Corrosion Scenario Project stage: Other ML0718000822007-07-13013 July 2007 Summary of Public Meeting with Union of Concerned Scientists (Ucs) Petition for Enforcement Action Pursuant to 10 CFR 2.206 on Protection Against Control Rod Drive Mechanism Nozzle Leakage Fast Corrosion Scenario for Davis-Besse Project stage: Meeting 2007-05-18
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24248A2332024-09-0505 September 2024 Summary of the August 29, 2024, Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML23152A2552023-06-0505 June 2023 Summary of the May 17, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML22178A2312022-06-28028 June 2022 Summary of the June 22, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Davis Besse Nuclear Power Station ML22088A1972022-03-30030 March 2022 Summary of March 11, 2022, Call Regarding the Spring 2022 Steam Generator Tube Inspections ML22084A1022022-03-27027 March 2022 Reissue Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission ML22077A8062022-03-23023 March 2022 Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission ML21314A5362021-11-18018 November 2021 Summary of November 8, 2021, Meeting with Energy Harbor Nuclear Corp. Regarding Its Proposed Alternate for Examination of Steam Generator Welds at ML21180A4632021-06-29029 June 2021 Summary of the June 22, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant ML20240A2942020-08-27027 August 2020 July 23, 2020 Summary of Public Webinar to Discuss the Nrc 2019 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station and the Perry Nuclear Power Plant ML19249C7112019-09-0404 September 2019 Summary of the July 18, 2019 Public Outreach/Open House to Discuss the NRC 2018 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station ML18313A1982018-11-14014 November 2018 Summary of Meeting with Firstenergy Nuclear Operating Company Regarding Planned Submittal of Post-Shutdown Emergency Plan for Davis-Besse Nuclear Power Station ML18192A6522018-07-10010 July 2018 Summary of Public Meeting to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML17258A1462017-09-20020 September 2017 Summary of September 12, 2017, Meeting with Firstenergy Nuclear Operating Company Regarding Its Licensing Amendment Request to Adopt National Fire Protection Association Standard 805 at Davis-Besse Nuclear Power Station, Unit No. 1 ML17229B1362017-08-16016 August 2017 Summary of July 19, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML17087A1882017-03-28028 March 2017 Summary of Closed Meeting with Firstenergy Nuclear Operating Company Regarding Changes to the Davis-Besse Nuclear Power Station, Unit No. 1, Security Plan ML16197A0522016-07-14014 July 2016 Summary of June 21, 2016, Public Meeting with Firstenergy Nuclear Operating Company to Discuss the 2015 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Station ML16130A7502016-05-12012 May 2016 Summary of April 12, 2016, Teleconference Regarding Steam Generator Tube Inservice Inspection ML14177A5782016-02-22022 February 2016 November 13, 2013, Summary of Meeting with Firstenergy Nuclear Operating Company to Discuss Delay in Submittal of Fire Risk Reduction Amendment Request ML16006A3512016-01-20020 January 2016 December 17,2015 Summary of Meeting with Firstenergy Nuclear Operating Company on Its License Amendment Request to Revise the Emergency Diesel Generator Surveillance Requirements at Davis-Besse Nuclear Power Station, Unit 1 ML16007A3962016-01-12012 January 2016 Summary of January 5, 2016, Meeting with Firstenergy Nuclear Operating Company on Its Planned License Amendment Request to Revise the Emergency Action Level Scheme at Davis-Besse Nuclear Power Station, Unit No. 1 ML15196A5162015-07-24024 July 2015 Summary of Telephone Conference Call Held on May 06, 2015, and May 19, 2015 Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company ML15170A2862015-06-18018 June 2015 Summary of the Public Open House Regarding Davis-Besse Nuclear Power Station ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis ML15056A4562015-04-20020 April 2015 Summary of Teleconference Call Held February 20, 2015, Between U.S. Nuclear Regulatory Commission and First Energy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station ML14325A7782014-12-16016 December 2014 October 6, 2014, Summary of Pre-Application Meeting with Firstenergy Nuclear Operating Company to Discuss Proposed Combination of Site Emergency Plans ML14224A6142014-08-12012 August 2014 Summary of Public Meeting to Discuss the 2013 Performance of Davis-Besse Nuclear Power Station ML14160B1032014-07-10010 July 2014 June 6, 2014 Summary of Meeting with FENOC Flooding Hazard Reevaluation Extension Request for Beaver Valley Power Station, Units 1 and 2 and Flooding Hazard Reevaluation Report for Davis-Besse Nuclear Power Station, Unit 1 ML14099A4642014-05-0606 May 2014 Summary of Public Meetings to Discuss Draft Supplement 52 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Davis-Besse Nuclear Generating Station, Unit 1 ML14099A3392014-04-22022 April 2014 March 27, 2014, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and First Energy Nuclear Operating Company Concerning Commitment 13 of the Safety Evaluation Report Pertaining to the Davis Besse Unit 1, Licens ML14080A1842014-03-21021 March 2014 Summary of Webinar Meeting to Discuss NRC Inspection Activities Associated with the Davis-Besse Nuclear Power Station Installation of Two New Steam Generators ML13240A0702013-08-29029 August 2013 8 22 2013 DB NRC Telecon Summary License Condition ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13182A4082013-07-17017 July 2013 Summary of Telephone Conference Call Held on October 16, 2012, Between NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station, LRA (TAC No. ME640) ML13197A2572013-07-17017 July 2013 5 28 2013 DB Hs Bolts Telecon Summary ML13149A2862013-07-12012 July 2013 Summary of Telephone Conference Call Held on May 2, 2013, Between the NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station License Renewal Application ML13182A4432013-07-12012 July 2013 Summary of Telephone Conference Call Held on April 11, 2013, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Powe ML13149A2882013-07-0909 July 2013 May 9, 2013, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Stat ML13168A2422013-06-14014 June 2013 6/11/2013 - Summary of Open House to Discuss the 2012 Davis-Besse Nuclear Power Station End-Of-Cycle Performance ML13091A3272013-03-29029 March 2013 Summary of Public Meeting to Discuss the Davis-Besse Replacement Activities ML13051A0682013-03-26026 March 2013 January 16, 2013 Summary of Telephone Conference Call Held Between U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company ML13051A6602013-03-26026 March 2013 Summary of Telephone Conference Call Held on January 23, 2013, Between the NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station, LRA ML13025A0272013-02-14014 February 2013 October 23, 2012 Summary of Telephone Conference Call Held Between the Nuclear Regulatory and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station, License ML12277A4082012-10-0303 October 2012 September 26, 2012, Summary of Public Meeting to Discuss FENOC Fleet Performance ML12243A2832012-08-30030 August 2012 Summary of Public Meeting to Discuss Nrc'S Review of Fenoc'S Root Cause Analysis of Davis-Besse Shield Building Cracks ML12237A0432012-08-24024 August 2012 August 15, 2012 - Summary of Public Meeting to Discuss the Davis-Besse Nuclear Power Station, Unit 1, End-Of-Cycle Plant Performance Assessment ML12165A3502012-07-16016 July 2012 Summary of Conference Call for Stream Generator Tube Inservice Inspections for Spring 2012 Refueling Outage ML12195A1132012-07-16016 July 2012 Summary of Public Meeting with FENOC Regarding Licensing Practices and Processes ML12052A1792012-05-15015 May 2012 July 19, 2011, Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station ML12061A2582012-04-0202 April 2012 Summary of Telephone Conference Call Held on July 12,2011, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power ML12059A0782012-04-0202 April 2012 Summary of Telephone Conference Call Held on February 9, 2012, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Pow 2024-09-05
[Table view] |
Text
July 13, 2007 LICENSEE: FirstEnergy Nuclear Operating Company (FENOC)
FACILITY: Davis-Besse Nuclear Power Station
SUBJECT:
SUMMARY
OF JUNE 18, 2007, PUBLIC MEETING REGARDING THE PETITION FOR ENFORCEMENT ACTION PURSUANT TO 10 CFR 2.206 ON PROTECTION AGAINST CONTROL ROD DRIVE MECHANISM NOZZLE LEAKAGE FAST CORROSION SCENARIO FOR DAVIS-BESSE NUCLEAR POWER STATION (TAC NO. MD5449)
On June 18, 2007, a Category 1 public meeting was held at the U.S. Nuclear Regulatory Commission (NRC) Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to provide the Union of Concerned Scientists (UCS) an opportunity to present additional relevant information concerning their petition submitted under Title 10 of the Code of Federal Regulations (10 CFR) Part 2.206. This meeting also provided the NRC staff and FirstEnergy Nuclear Operating Company (the licensee) with an opportunity to ask clarifying questions concerning the submitted petition. A list of meeting attendees is provided as Enclosure 1.
BACKGROUND Mr. David Lochbaum (the petitioner) of the UCS had requested an opportunity to address the NRCs Petition Review Board (PRB) after learning that the PRBs initial recommendation was to reject Items #2 and #3 of his April 30, 2007, petition request (Agencywide Documents Access and Management System (ADAMS) Accession No. ML071300245).
By verbal communication on May 29, 2007, the petitioner had been informed that the PRBs initial recommendation was to reject Item #2 (the request for shutdown of all pressurized water reactors if the Exponent Report was validated by independent review) because the NRC had performed an assessment and had determined that an immediate safety concern did not exist.
The PRB determined that the request met one of the criteria for rejection described in Management Directive 8.11, since this issue had already been the subject of NRC staff review and evaluation. In addition, the NRC staffs evaluation of the May 10, 2007, supplement to the petition request concluded that it did not raise any new issues that would cause the NRC to change its assessment of the Exponent Report.
The petitioner was also informed that the PRBs initial recommendation was to reject Item #3 (revoke Davis-Besses operating license for providing inaccurate information if the Exponent Report was invalidated by independent review) for review because the petition did not meet all the criteria necessary for reviewing petitions, under 10 CFR 2.206, as described in Management Directive 8.11. Specifically, in his request, the petitioner did not present facts sufficient to constitute a basis for the requested action.
At the conclusion of the May 29, 2007, telephone call, the petitioner requested an opportunity to address the PRB at a public meeting.
MEETING
SUMMARY
The petitioner presented slides and supplemental information in support of his request for enforcement action for Items #2 and #3 of his petition request. See ADAMS Accession Nos.
ML071780028 and ML071780029, respectively. The petitioner presented additional information to support his request for the NRC to revoke the operating license for Davis-Besse, for what the petitioner believed was inaccurate information submitted to the NRC.
Following the presentation, the NRC staff asked clarifying questions of the petitioner about the presentation. A court reporter was present during the public meeting. A transcript of the proceedings is publicly available (ADAMS Accession No. ML071840004).
Members of the public were in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-4037, or tjw2@nrc.gov.
/RA/
Thomas J. Wengert, Project Manager Plant Licensing Branch LPLIII-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
List of Attendees cc w/encls: See next page
ML071780028 and ML071780029, respectively. The petitioner presented additional information to support his request for the NRC to revoke the operating license for Davis-Besse, for what the petitioner believed was inaccurate information submitted to the NRC.
Following the presentation, the NRC staff asked clarifying questions of the petitioner about the presentation. A court reporter was present during the public meeting. A transcript of the proceedings is publicly available (ADAMS Accession No. ML071840004).
Members of the public were in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-4037, or tjw2@nrc.gov.
/RA/
Thomas J. Wengert, Project Manager Plant Licensing Branch LPLIII-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
List of Attendees cc w/encls: See next page DISTRIBUTION:
PUBLIC T. Mensah, NRR LPL3-2 R/F J. Collins, NRR RidsNrrDorlLpl3-2 W. Bateman, NRR RidsNrrPMTWengert B. Burgess, RIII RidsNrrLAEWhitt RidsRgn3MailCenter RidsOgcRp M. Schwartz, OE RidsAcrsAcnwMailCenter H. Nieh, NRR R. Jasinski, NRR L. Clark, OGC RidsNrrAdro T. Bloomer, EDO Region III RidsNrrDorl RidsEdoMailCenter RidsNrrDci RidsNrrDpr G. Longo, OGC Package: ML071900187 Summary Accession No.: ML071800082 Meeting Notice Accession No.: ML071520343 Petitioners Slides Accession No.: ML071780028 Petitioners Handout Accession No.: ML071780029 Meeting Transcript Accession No.: ML071840004 NRC-001 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME TWengert Ewhitt, TLH for RGibbs DATE 7/13/07 7/13/07 7/13/07 LIST OF ATTENDEES PUBLIC MEETING ON JUNE 18, 2007 DAVIS-BESSE 2.206 PETITION ON PROTECTION AGAINST CONTROL ROD DRIVE MECHANISM NOZZLE LEAKAGE FAST CORROSION SCENARIO NRC - HQ Giovanna Longo OGC Ho Nieh DPR Tanya Mensah DPR Stacey Rosenberg DPR Tom Wengert DORL Russell Gibbs DORL Lisa Regner Observer Bruce Burgess Region III Lauren Casey Observer Heather Jones Observer Holly Cruz DPR Yeon-Ki Chung DLR Jay Collins DCI Michele Evans DCI Vanice Perin DPR Undine Shoop OEDO Jessica Ruber OEDO Sandra Hackworth OI Petitioner David Lochbaum UCS Licensee Greg Halnon FENOC Dave Jenkins FENOC Members of the Public Paul Gunter NIRS Jeff Spalding Clifford & Garde Sandra Shepherd Clifford & Garde Tim Matthews Morgan Lewis Robert Haemer Pillsbury Winthrop Shaw Pittman Jane Diecker Morgan Lewis Tom Schmutz Morgan Lewis The following individuals participated by teleconference:
NRC - RIII Jim Gavula Region III Joe Ulie Region III Paul Zurawski Region III Richard Smith Region III Enclosure
Davis-Besse Nuclear Power Station, Unit No. 1 cc:
Manager, Site Regulatory Compliance Attorney General FirstEnergy Nuclear Operating Company Office of Attorney General Davis-Besse Nuclear Power Station 30 East Broad Street Mail Stop A-DB-3065 Columbus, OH 43216 5501 North State Route 2 Oak Harbor, OH 43449-9760 President, Board of County Commissioners of Ottawa County Director, Ohio Department of Commerce Port Clinton, OH 43252 Division of Industrial Compliance Bureau of Operations & Maintenance President, Board of County 6606 Tussing Road Commissioners of Lucas County P.O. Box 4009 One Government Center, Suite 800 Reynoldsburg, OH 43068-9009 Toledo, OH 43604-6506 Regional Administrator, Region III The Honorable Dennis J. Kucinich U.S. Nuclear Regulatory Commission United States House of Representatives Suite 210 Washington, D.C. 20515 2443 Warrenville Road Lisle, IL 60532-4352 The Honorable Dennis J. Kucinich United States House of Representatives Resident Inspector 14400 Detroit Avenue U.S. Nuclear Regulatory Commission Lakewood, OH 44107 5503 North State Route 2 Oak Harbor, OH 43449-9760 Joseph J. Hagan President and Chief Nuclear Officer Stephen Helmer FirstEnergy Nuclear Operating Company Supervisor, Technical Support Section Mail Stop A-GO-14 Bureau of Radiation Protection 76 South Main Street Ohio Department of Health Akron, OH 44308 35 East Chestnut Street, 7th Floor Columbus, OH 43215 David W. Jenkins, Attorney FirstEnergy Corporation Carol OClaire, Chief, Radiological Branch Mail Stop A-GO-15 Ohio Emergency Management Agency 76 South Main Street 2855 West Dublin Granville Road Akron, OH 44308 Columbus, OH 43235-2206 Danny L. Pace Zack A. Clayton Senior Vice President, Fleet Engineering DERR FirstEnergy Nuclear Operating Company Ohio Environmental Protection Agency Mail Stop A-GO-14 P.O. Box 1049 76 South Main Street Columbus, OH 43266-0149 Akron, OH 44308 State of Ohio Manager, Fleet Licensing Public Utilities Commission FirstEnergy Nuclear Operating Company 180 East Broad Street Mail Stop A-GO-2 Columbus, OH 43266-0573 76 South Main Street Akron, OH 44308
Davis-Besse Nuclear Power Station, Unit 1 cc:
Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Mr. Mark B. Bezilla Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308