May 18, 2007 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 - MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE APPLICATION (TAC NO. MD5240)
Dear Mr. Bezilla:
In a letter dated April 12, 2007, FirstEnergy Nuclear Operating Company (FENOC) submitted an application requesting to increase the licensed thermal power level for the Davis-Besse Nuclear Power Station, Unit No. 1. The proposed amendment would increase the licensed core power level by approximately 1.63 percent to 2817 megawatts thermal with the installation of the Caldon Leading Edge Flow Measurement (LEFM) CheckPlus ultrasonic flow TM measurement system.
The purpose of this letter is to provide you with the results of the Nuclear Regulatory Commission (NRC) staffs acceptance review of the application. Based on the information contained in your application, as compared to Regulatory Issue Summary 2002-03, dated January 31, 2002, the NRC staff has determined that FENOC has provided the necessary information for the NRC staff to begin a detailed technical review.
If you have any questions, please contact me at 301-415-4037.
Sincerely,
/RA/
Thomas J. Wengert, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 cc: See next page
Mr. Mark B. Bezilla May 18, 2007 Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 - MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE APPLICATION (TAC NO. MD5240)
Dear Mr. Bezilla:
In a letter dated April 12, 2007, FirstEnergy Nuclear Operating Company (FENOC) submitted an application requesting to increase the licensed thermal power level for the Davis-Besse Nuclear Power Station, Unit No. 1. The proposed amendment would increase the licensed core power level by approximately 1.63 percent to 2817 megawatts thermal with the installation of the Caldon Leading Edge Flow Measurement (LEFM) CheckPlus ultrasonic flow TM measurement system.
The purpose of this letter is to provide you with the results of the Nuclear Regulatory Commission (NRC) staffs acceptance review of the application. Based on the information contained in your application, as compared to Regulatory Issue Summary 2002-03, dated January 31, 2002, the NRC staff has determined that FENOC has provided the necessary information for the NRC staff to begin a detailed technical review.
If you have any questions, please contact me at 301-415-4037.
Sincerely,
/RA/
Thomas J. Wengert, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 cc: See next page DISTRIBUTION:
PUBLIC LPL3-2 R/F RidsNrrDorlLpl3-2 RidsNrrPMTWengert RidsNrrLAEWhitt RidsAcrsAcnwMailCenter RidsOgcRp RidsRgn3MailCenter RidsNrrDorlDpr TAlexion, NRR RidsNrrDpr ADAMS Accession Number: ML071300028 NRR-106 OFFICE LPL3-2/PM LPL3-2/LA DPR/PGCB/BC LPL3-2/BC NAME TWengert EWhitt CJackson RGibbs DATE 5/18/07 5/18/07 05/16/07 5/18/07 OFFICIAL RECORD COPY
Davis-Besse Nuclear Power Station, Unit 1 cc:
Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3065 5501 North State Route 2 Oak Harbor, OH 43449-9760 Director, Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4352 Resident Inspector U.S. Nuclear Regulatory Commission 5503 North State Route 2 Oak Harbor, OH 43449-9760 Stephen Helmer Supervisor, Technical Support Section Bureau of Radiation Protection Ohio Department of Health 35 East Chestnut Street, 7 Floor th Columbus, OH 43215 Carol OClaire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235-2206 Zack A. Clayton DERR Ohio Environmental Protection Agency P.O. Box 1049 Columbus, OH 43266-0149 State of Ohio Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Attorney General Office of Attorney General 30 East Broad Street Columbus, OH 43216 President, Board of County Commissioners of Ottawa County Port Clinton, OH 43252 President, Board of County Commissioners of Lucas County One Government Center, Suite 800 Toledo, OH 43604-6506 The Honorable Dennis J. Kucinich United States House of Representatives Washington, D.C. 20515 The Honorable Dennis J. Kucinich United States House of Representatives 14400 Detroit Avenue Lakewood, OH 44107 Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-18 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308
Davis-Besse Nuclear Power Station, Unit 1 cc:
Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308