Summary of Telephone Conference Call Held on April 11, 2007, Between the U.S. Nuclear Regulatory Commission and Wolf Creek Nuclear Operating Corporation, Concerning Draft Requests for Additional Information to the Wolf Creek Generating Stat
ML071240153
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/08/2007
From: Veronica Rodriguez
NRC/NRR/ADRO/DLR/RLRB
To:
Wolf Creek
Rodriguez V NRR/DLR/RLRB 415-3703
References
Download: ML071240153 (12)


Text

May 8, 2007 LICENSEE: Wolf Creek Nuclear Operating Corporation FACILITY: Wolf Creek Generating Station, Unit 1

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON APRIL 11, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND WOLF CREEK NUCLEAR OPERATING CORPORATION, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE WOLF CREEK GENERATING STATION, UNIT 1, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Wolf Creek Nuclear Operating Corporation held a telephone conference call on April 11, 2007, to discuss and clarify the staffs draft requests for additional information (D-RAIs) concerning the Wolf Creek Generating Station, Unit 1, license renewal application. The telephone conference call was useful in clarifying the intent of the staffs D-RAIs. provides a listing of the participants and Enclosure 2 contains a listing of the D-RAIs discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

/RA/

Verónica M. Rodríguez, Project Manager License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-482

Enclosures:

1. List of Participants
2. List of Draft Requests for Additional Information cc w/encls: See next page

ML071240153 OFFICE PM:RLRB:DLR LA:DLR BC:RLRB:DLR NAME VRodríguez SFigueroa RAuluck DATE 05/04/07 05/04/07 05/08/07 TELEPHONE CONFERENCE CALL WOLF CREEK GENERATING STATION, UNIT 1 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS APRIL 11, 2007 PARTICIPANTS AFFILIATIONS Verónica M. Rodríguez U.S. Nuclear Regulatory Commission (NRC)

Janak Raval NRC David Nold NRC Harold Walker NRC Lorrie Bell Wolf Creek Nuclear Operating Corporation (WCNOC)

Eric Blocher Strategic Teaming and Resource Sharing Alliance (STARS)

Paul Crawley STARS Richard Geiger STARS Al Saunders STARS Enclosure 1

DRAFT REQUESTS FOR ADDITIONAL INFORMATION WOLF CREEK GENERATING STATION, UNIT 1 LICENSE RENEWAL APPLICATION APRIL 11, 2007 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Wolf Creek Nuclear Operating Corporation held a telephone conference call on April 11, 2007, to discuss and clarify the following draft requests for additional information (D-RAIs) concerning the Wolf Creek Generating Station (WCGS), Unit 1, License Renewal Application (LRA).

Containment Spray System D-RAI 2.3.2.2-1 LRA Table 2.3.2-2 does not contain all the components highlighted in LRA drawing LR-WCGS-EN-M-12EN01 as components within the scope of license renewal. For example, LRA Table 2.3.2-2 lists closure bolting, piping, pump, tubing, valve, vortex breaker, among others; however, it does not list pump casings nor valve bodies. The staff requests that the applicant clarify this inconsistency. If these components are not within the scope of license renewal, the staff requests that the applicant justify their exclusion.

Discussion: The staff indicated to the applicant that the LRA does not address the pumps or valves as commodity groups; therefore, pump casings and valve bodies must be addressed.

The staff clarified that this applies to similar RAIs discussed in this letter. The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

D-RAI 2.3.2.2-2 Updated Safety Analysis Report (USAR) Section 6.2.2.1.2.2 describes the mechanical components in the containment recirculation sumps. It states that a baffle arrangement of grating, coarse screening and fine screening that completely surrounds the sumps to prevent floating debris and high density particles from entering. However, these baffle arrangements and their intended function(s) are not listed in LRA Table 2.3.2-2. The staff requests that the applicant justify the exclusion of these components from the scope of license renewal.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

D-RAI 2.3.2.2-3 USAR Section 6.2.5.2.2.2 states that the containment spray system is one element of a complement of factors and systems that ensure uniform mixing of hydrogen within the containment atmosphere following a loss of coolant accident. LRA Section 2.3.2.2 does not mention this function. The staff requests that the applicant clarify this inconsistency.

Discussion: The staff clarified that the USAR Section referenced should be USAR Section 6.2.5.3 instead of USAR Section 6.2.5.2.2.2. The applicant indicated that the question is clear.

This D-RAI will be sent as a formal RAI.

Enclosure 2

Containment Integrated Leak Rate Test System D-RAI 2.3.2.3-1 LRA Table 2.3.2-3 does not contain all the components highlighted in LRA drawing LR-WCGS-GP-M-12GP01 as components within the scope of license renewal. For example, LRA Table 2.3.2-3 lists closure bolting, piping, and valve; however, it does not list valve bodies.

The staff requests that the applicant clarify this inconsistency. If these components are not within the scope of license renewal, the staff requests that the applicant justify its exclusion.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Decontamination System D-RAI 2.3.2.4-1 LRA Table 2.3.2-4 does not contain all the components highlighted in LRA drawing LR-WCGS-HD-M-12HD01 as components within the scope of license renewal. For example, LRA Table 2.3.2-4 lists closure bolting, piping, valve; however, it does not list valve bodies. The staff requests that the applicant clarify this inconsistency. If these components are not within the scope of license renewal, the staff requests that the applicant justify its exclusion.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

D-RAI 2.3.2.4-2 LRA drawing LR-WCGS-HD-M-12HD01 shows 1-inch test connections (attached to 016-HBD-2 and 017-HBD-2) not highlighted in green. This would indicate that these 1-inch test connections are not within the scope of license renewal and not subject to an aging management review (AMR). The two 2-inch pipes shown in the drawing have an intended function of structural integrity (attached). The staff request that the applicant clarify whether the 1-inch test connections have the same intended function as the 2-inch pipes. If yes, the staff request that the applicant justify their exclusion from the scope of license renewal.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Containment Purge HVAC System D-RAI 2.3.2.7-1 LRA Table 2.3.2-7 does not contain all the components highlighted in LRA drawing LR-WCGS-GT-M-12GT01 as components within the scope of license renewal. For example, LRA Table 2.3.2-7 lists closure bolting, damper, pump, and valve; however, it does not list damper housings, pump casing, nor valve bodies. The staff requests that the applicant clarify this inconsistency. If these components are not within the scope of license renewal, the staff requests that the applicant justify their exclusion.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

D-RAI 2.3.2.7-2 LRA drawing LR-WCGS-GT-M-12GT01 does not highlight the safety-related / nonsafety-related interfaces (i.e., green to red) as within the scope of license renewal. However, LRA Table 2.3.2-7 shows structural integrity (attached) as an intended function for piping in the system. The staff requests that the applicant explain why this interface is not highlighted in the drawing. If this interface is not within the scope of license renewal, the staff requests that the applicant justify its exclusion.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

D-RAI 2.3.2.7-3 LRA Table 2.3.2-7 lists pressure boundary as an intended function for the component type of tubing. LRA drawing LR-WCGS-GT-M-12GT01 shows a 3/8-inch tubing located at heat exchanger No. 14 (at valves V0220 and V0221) which would suggest a leakage boundary (spatial) intended function. The staff requests that the applicant clarify this discrepancy.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Breathing Air System D-RAI 2.3.2.8-1 LRA Table 2.3.2-8 does not contain all the components highlighted in LRA drawing LR-WCGS-KB-M-12KB01 as components within the scope of license renewal. For example, LRA Table 2.3.2-8 lists closure bolting, piping, and valve; however, it does not list valve bodies.

The staff requests that the applicant clarify this inconsistency. If these components are not within the scope of license renewal, the staff requests that the applicant justify their exclusion.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

D-RAI 2.3.2.8-2 LRA drawing LR-WCGS-KB-M-12KB01 shows 1-inch test connections 004-HCD-1 and 005-HCD-1 not highlighted, indicating that there are not within the scope of license renewal and not subject to an AMR. Test connection 004-HCD-1 attaches to 002-HCD-2, and test connection 005-HCD-1 attaches to 003-HCD-2. As indicated in LRA Table 2.3.2-8 and by the red highlight shown in the drawing, pipes 002-HCD-2 and 003-HCD-2 have an intended function of structural integrity (attached) in accordance with 10 CFR 54.4(a)(2). It seems that these 1-inch test connections have the same intended function. Therefore, the staff requests that the applicant explain why test connections 004-HCD-1 and 005-HCD-1 and their attendant valves are not within the scope of license renewal and subject to an AMR.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Hydrogen Control System D-RAI 2.3.2.9-1 LRA Table 2.3.3-9 does not contain all the components highlighted in LRA drawing LR-WCGS-GS-M-12GS01 as components within the scope of license renewal. For example, LRA Table 2.3.3-9 lists closure bolting, piping, recombiner, and valve, among others; however, it does not list valve bodies nor recombiner housings. The staff requests that the applicant explain this inconsistency. If these components are not within the scope of license renewal, the staff requests that the applicant justify their exclusion.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

D-RAI 2.3.2.9-2 USAR 6.2.5.2.2.2 states that one of the system functions is to uniformly mix the hydrogen within the containment atmosphere following a loss-of-coolant accident. However, this is not addressed in the system description of LRA Section 2.3.2.9. Furthermore, there is no mention of this uniform mixing of hydrogen function in LRA Section 2.3.3.5, Containment Cooling System. The staff requests that the applicant clarify these inconsistencies.

Discussion: The staff clarified that the USAR Section referenced should be USAR Section 6.2.5.3 instead of USAR Section 6.2.5.2.2.2. The applicant indicated that the question is clear.

This D-RAI will be sent as a formal RAI.

D-RAI 2.3.2.9-3 LRA Table 2.3.2-9 indicates that portions of the piping subject to an AMR have a structural integrity (attached) intended function. The system function described in LRA Section 2.3.2.9 does not indicate that portions of the hydrogen control system are within scope of license renewal in accordance with the 10 CFR 54.4(a)(2) criteria. The staff requests that the applicant clarify this inconsistency.

Discussion: The applicant indicated that the question is clear. The applicant clarified that the LRA is showing an omission and that it will address this question accordingly. This D-RAI will be sent as a formal RAI.

D-RAI 2.3.2.9-4 LRA drawing LR-WCGS-GS-M-12GS01 appears to have at least one piping segment that has a structural integrity (attached) intended function pursuant to 10 CFR 54.4(a)(2). For example, pipe 026-HB0-6, located downstream of the seismic flag at butterfly valve V021 at coordinate F-4, appears to be a carbon steel pipe with a structural integrity (attached) intended function.

This would be in agreement with LRA Table 2.3.2.9. However, there are multiple occurrences of what appears to be stainless steel test connections beyond the seismic anchor point identified on the drawing. In most cases it is not obvious whether the test connection is stainless steel pipe or tubing. At coordinate B-3 and B-7, there is stainless steel tubing connected beyond the seismic anchor valves V0109 and V010, which appear to be safety-related to nonsafety-related interfaces. The staff requests that the applicant clarify whether the component type tubing should also include a structural integrity (attachment) intended function. In addition, the staff requests that the applicant clarify similar inconsistencies in LRA Section 2.3.2.9 and its drawing.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Auxiliary Building HVAC System D-RAI 2.3.3.8-1 LRA Table 2.3.3-8 does not contain all the components highlighted in LRA drawings LR-WCGS-GL-M-12GL01, LR-WCGS-GL-M-12GL02, and LR-WCGS-GL-M-12GL03 as components within the scope of license renewal. For example, LRA Table 2.3.3-8 lists closure bolting, damper, ductwork, fan, and flex connector, among others; however, it does not list damper housings, heating coil housings, pump casing, valve bodies, nor fan housings. The staff requests that the applicant clarify this inconsistency. If these and other applicable components are not within the scope of license renewal, the staff requests that the applicant justify their exclusion.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Control Building HVAC System D-RAI 2.3.3.9-1 LRA Table 2.3.3-9 does not contain all the components highlighted in LRA drawings LR-WCGS-GK-M-12GK01, LR-WCGS-GK-M-12GK02, LR-WCGS-GK-M-12GK03, and LR-WCGS-GK-M-12GK04 as components within the scope of license renewal. For example, LRA Table 2.3.3-9 lists adsorber, closure bolting, compressor, damper, ductwork, fan, flex connector, pump, and valve, among others; however, it does not list housings for filter adsorption units including its high-efficiency particulate air (HEPA) filters, charcoal adsorbers, and moisture separators), compressor housings, fire dampers, damper housings including fire damper housings, heating coil housings, pump casings, valve bodies, supply and return grills, air intake louvers and associated housings, nor fan housings. The staff requests that the applicant clarify this inconsistency. If these and other applicable components (e.g., sealants, wall sealants, pressure boundary sealants, metal screens to protect against any debris for air intake or air discharge (purge), etc.) are not within the scope of license renewal, the staff requests that the applicant justify their exclusion.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Fuel Building HVAC System D-RAI 2.3.3.10-1 LRA Table 2.3.3-10 does not contain all the components highlighted in LRA drawings LR-WCGS-GG-M-12GG01, and LR-WCGS-GG-M-12GG02 as components within the scope of license renewal. For example, LRA Table 2.3.3-10 lists adsorber, closure bolting, damper, ductwork, fan, and flex connectors, among others; however, does not list housings for filter adsorber units (including its HEPA filters, charcoal adsorbers, and moisture separators),

damper housings, fire dampers and associated housings, heating coil housings, pump casings, valve bodies, nor fan housings. The staff requests that the applicant clarify this inconsistency.

If these and other applicable components (e.g., duct sealants, wall sealants, pressure boundary sealants, etc.) are not within the scope of license renewal, the staff requests that the applicant justify their exclusion.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Essential Service water Pumphouse Building HVAC System D-RAI 2.3.3.11-1 LRA Table 2.3.3-11 does not contain all the components highlighted on LRA drawing LR-WCGS-GD-M-K2GD01 as components within the scope of license renewal. For example, LRA Table 2.3.3-11 lists closure bolting, damper, ductwork, and fan, among others; however, it does not list damper housings, intake and exhaust louvers with their associated housings and plenums nor fan housings. The staff requests that the applicant clarify this inconsistency. The staff requests that the applicant clarify this inconsistency. If these and other applicable components are not within the scope of license renewal, the staff requests that the applicant justify their exclusion.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Miscellaneous Building HVAC System D-RAI 2.3.3.12-1 LRA Table 2.3.3-12 does not contain all the components highlighted on LRA drawing LR-WCGS-GF-M-12GF01 as components within the scope of license renewal. For example, LRA Table 2.3.3-12 lists closure bolting, damper, ductwork, fan, and flex connector, among others; however, it does not list damper housings, heating coil housings, pump casings, valve bodies, nor fan housings. The staff requests that the applicant clarify this inconsistency. If these and other applicable components are not within the scope of license renewal, the staff requests that the applicant justify their exclusion.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Diesel Generator Building HVAC System D-RAI 2.3.3.13-1 LRA Table 2.3.3-13 does not contain all the components highlighted on LRA drawing LR-WCGS-GM-M-12GM01 as components within the scope of license renewal. For example, LRA Table 2.3.3-13 lists closure bolting, damper, ductwork, fan, and flex connector, among others; however, it does not list damper housings, valves and valve bodies, intake and exhaust louvers and associated housings and plenums nor fan housings. The staff requests that the applicant clarify this inconsistency. If these and other applicable components are not within the scope of license renewal, the staff requests that the applicant justify their exclusion.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Turbine Building HVAC System D-RAI 2.3.3.20-1 LRA Tables 2.3.3-20 and 3.3.2-20 does not contain all the components highlighted on LRA drawings LR-WCGS-GE-M-12GE01 and LR-WCGS-GE-M-12GE02 as components within the scope of license renewal. For example, LRA Table 2.3.3-20 lists closure bolting, damper, ductwork, and flex connector; however, it does not list damper housings, fire dampers nor fire damper housings. The staff requests that the applicant clarify this inconsistency. If these and other applicable components are not within the scope of license renewal, the staff requests that the applicant justify their exclusion.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Memo to Wolf Creek Nuclear Operating Corp, from V. Rodriguez dated May 8, 2007 DISTRIBUTION:

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON APRIL 11, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND WOLF CREEK NUCLEAR OPERATING CORPORATION, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE WOLF CREEK GENERATING STATION, UNIT 1, LICENSE RENEWAL APPLICATION HARD COPY DLR RF E-MAIL:

PUBLIC RWeisman SSmith (srs3)

SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDci RidsNrrDra RidsNrrDe RidsNrrDeEemb RidsNrrDeEeeb RidsNrrDss RidsOgcMailCenter RidsNrrAdes VRodriguez CJacobs JDonohew GPick, RIV SCochrum, RIV CLong, RIV SRay DNguyen VGoel DNold JRaval

Wolf Creek Generating Station cc:

Jay Silberg, Esq. Supervisor Licensing Pillsbury Winthrop Shaw Pittman, LLP Wolf Creek Nuclear Operating Corporation 2300 N Street, NW P.O. Box 411 Washington, DC 20037 Burlington, KS 66839 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Resident Inspectors Office/Callaway Plant 611 Ryan Plaza Drive, Suite 400 8201 NRC Road Arlington, TX 76011-7005 Steedman, MO 65077-1032 Senior Resident Inspector Kevin J. Moles, Manager U.S. Nuclear Regulatory Commission Regulatory Affairs P.O. Box 311 Wolf Creek Nuclear Operating Corporation Burlington, KS 66839 P.O. Box 411 Burlington, KS 66839 Chief Engineer, Utilities Division Kansas Corporation Commission Lorrie I. Bell, Project Manager 1500 SW Arrowhead Road Wolf Creek Nuclear Operating Corporation Topeka, KS 66604-4027 P.O. Box 411 Burlington, KS 66839 Office of the Governor State of Kansas Mr. James Ross Topeka, KS 66612 Nuclear Energy Institute 1776 I Street, NW, Suite 400 Attorney General Washington, DC 20006-3708 120 S.W. 10th Avenue, 2nd Floor Topeka, KS 66612-1597 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839 Thomas A. Conley, Section Chief Radiation and Asbestos Control Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839