Response to Request for Additional Information for Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity
ML071170385
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/26/2007
From: Gerald Bichof
Dominion, Dominion Nuclear Connecticut
To:
Document Control Desk, NRC/NRR/ADRO
References
06-0001B, TAC MD2570
Download: ML071170385 (9)


Text

Dominion Nuclear Connecticut, Inc.

5000 Dominion Boulevard, Glen Allen, Virginid 2 3060 A p r i l 26, 2007 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 1 1555 Rockville Pike Rockville, MD 20852-2738 Serial No.

06-0001 B NL&OS/PRW RO Docket No.

50-336 License No.

DPR-65 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION APPLICATION FOR TECHNICAL SPECIFICATION IMPROVEMENT REGARDING STEAM GENERATOR TUBE INTEGRITY

/TAC NO. MD2570)

In a letter dated May 31, 2006, Dominion Nuclear Connecticut, Inc. (DNC) submitted a request to revise the steam generator tube integrity requirements in the Technical Specifications for Millstone Power Station Unit 2 (MPS2) consistent with NRC-approved Revision 4 to Technical Specification Task Force (TSTF) Traveler TSTF-449, "Steam Generator Tube Integrity."

In a facsimile dated March 20, 2007, the NRC forwarded a request for additional information (RAI). The response to the RAI is provided in Attachment 1 to this letter.

Revised marked up pages for MPS2 are provided in Attachment 2. Marked up Bases pages are provided for information only.

The changes provided in this submittal do not affect the conclusions of the Safety Summary and Significant Hazards Consideration discussion in the DNC letter dated May 31,2006.

If you have any questions in regard to the responses provided or require additional information, please contact Mr. David A. Sommers at (804) 273-2823.

Very truly yours, Gerald T. Bischof Vice President - Nuclear Engineering Commitments in this letter: None

Serial No. 06-0001 B Docket Nos. 50-336 Response to Request for Additional Information Page 2 of 3 Attachments: (2)

1. Response to Request for Additional Information.
2. Revised Marked Up Pages.

cc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11 555 Rockville Pike Mail Stop 8C2 Rockville. MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station

Serial No. 06-0001 B Docket Nos. 50-336 Response to Request for Additional Information Page 3 of 3 COMMONWEALTH OF VIRGINIA

)

COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Gerald T. Bischof, who is Vice President - Nuclear Engineering of Dominion Nuclear Connecticut, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this a6 day of @a,, 2007 My Commission Expires:

x &I, &3mg.

u Notary Public (SEAL)

Serial No. 06-0007 B Docket No. 50-336 ATTACHMENT I RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 2

Serial No. 06-0001 B Docket No. 50-336 Response to Request for Additional Information Page 1 of 1 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION MILLSTONE POWER STATION UNIT 2 By letter dated May 31, 2006, Dominion Nuclear Connecticut, Inc. (DNC), submitted a request to revise the steam generator tube integrity requirements in the Technical Specifications (TS) for Millstone Power Station Unit 2 (MPS2). In order for the Nuclear Regulatory Commission (NRC) staff to complete its review, responses to the following questions were requested.

NRC Question No. I In your February 14, 2007, letter, you indicated that you would be removing reference to sleeving (i.e., a repair method) in your [MPS2] technical specifications (refer to response to question 4). In doing so, it appears that a few references to sleeving (repair) were not deleted. Discuss your plans to remove the remaining references to tube repair in your [MPS2] technical specifications (e.g., in the second sentence of proposed Technical Specification 6.26a; in the second paragraph of the Limiting Condition for Operation Section in the Steam Generator Tube integrity Bases Section; and in the last paragraph of the Actions a.1 and a.2 Section in the Steam Generator Tube Integrity Bases Section).

DNC Response DNC is in agreement that each identified reference to a provision for sleeving of steam generator tubes as a repair option requires removal in the proposed MPS2 TSs and in the Bases pages that were provided for information.

Accordingly, Attachment 2 contains the revised marked up TS and Bases pages that did not previously remove the repair option. (Attachment 2 has corrected pages that include the first page of TS lnsert 6.26, and the first and fourth pages of the Bases lnsert B 314.4.5.)

NRC Question No. 2 In removing reference to tube repair in proposed [MPS2] TS 6.26.a, a typographical error was introduced. Please discuss your plans to modify [MPS2] TS 6.26.a to indicate that steam generator tubes are inspected or plugged to confirm that the performance criteria are being met. This typographical error also exists in Technical Specification Task Force (TSTF) Traveler TSTF-449.

DNC Response DNC agrees that a typographical error was introduced and has corrected this text in the replacement marked up page of the first page of TS lnsert 6.26.

(Refer to.)

Serial No. 06-0001B Docket No. 50-336 ATTACHMENT 2 APPLICATION FOR TECHNICAL SPECIFICATION IMPROVEMENT REGARDING STEAM GENERATOR TUBE INTEGRITY

{TAC NO. MD2570)

REVISED MARKED UP PAGES The Millstone Technical Specifications Bases Control Program controls revisions to the bases insert pages that are provided for information only in this submittal.

DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 2

Serial No. 06-0001 B Docket No. 50-336 INSERT 6.26 of TS Insert 6.26 6.26 Steam Generator (SG) Program A Steam Generator Program shall be established and implemented to ensure that SG tube integrity is maintained. In addition, the Steam Generator Program shall include the following provisions:

a.

Provisions for condition monitoring assessments: Condition monitoring assessment means an evaluation of the "as found" condition of the tubing with respect to the performance criteria for structural integrity and accident induced leakage. The "as found" condition refers to the condition of the tubing during a SG inspection outage, as determined from the inservice inspection results or by other means, prior to the plugging of tubes.

Condition monitoring assessments shall be conducted during each outage during which the SG tubes are inspected or plugged to confirm that the performance criteria are being met.

b.

Provision for performance criteria for SG tube integrity: SG tube integrity shall be maintained by meeting the performance criteria for tube structural integrity, accident induced leakage, and operational LEAKAGE.

Structural integrity performance criterion: All in-service steam generator tubes shall retain structural integrity over the full range of normal operating conditions (including STARTUP, operation in the power range, HOT STANDBY, and cool down and all anticipated transients included in the design specification) and design basis accidents. This includes retaining a safety factor of 3.0 against burst under normal steady state full power operation primary-to-secondary pressure differential and a safety factor of 1.4 against burst applied to the design basis accident primary-to-secondary pressure differentials. Apart from the above requirements, additional loading conditions associated with the design basis accidents, or combination of accidents in accordance with the design and licensing basis, shall also be evaluated to determine if the associated loads contribute significantly to burst or collapse. In the assessment of tube integrity, those loads that do significantly affect burst or collapse shall be determined and assessed in combination with the loads due to pressure with a safety factor of 1.2 on the combined primary loads and 1.0 on axial secondary loads.

Serial No. 06-0001 B Docket No. 50-336 INSERT 8 314.4.5 STEAM GENERATOR TUBE INTEGRITY of Insert B 314.4.5 The LC0 requires that steam generator (SG) tube integrity be maintained. The LC0 also requires that all SG tubes that satisfy the repair criteria be plugged in accordance with the Steam Generator Program.

During a SG inspection, any inspected tube that satisfies the Steam Generator Program repair criteria is removed from service by plugging. If a tube was determined to satisfy the repair criteria but was not plugged, the tube may still have tube integrity.

In the context of this Specification, a SG tube is defined as the entire length of the tube, including the tube wall between the tube-to-tubesheet weld at the tube inlet and the tube-to-tubesheet weld at the tube outlet. The tube-to-tubesheet weld is not considered part of the tube.

A SG tube has tube integrity when it satisfies the SG performance criteria. The SG performance criteria are defined in Specification 6.26, "Steam Generator Program,"

and describe acceptable SG tube performance. The Steam Generator Program also provides the evaluation process for determining conformance with the SG performance criteria.

There are three SG performance criteria: structural integrity, accident induced leakage, and operational LEAKAGE.

Failure to meet any one of these criteria is considered failure to meet the LCO.

The structural integrity performance criterion provides a margin of safety against tube burst or collapse under normal and accident conditions, and ensures structural integrity of the SG tubes under all anticipated transients included in the design specification. Tube burst is defined as, "The gross structural failure of the tube wall. The condition typically corresponds to an unstable opening displacement (e.g.,

opening area increased in response to constant pressure) accompanied by ductile (plastic) tearing of the tube material at the ends of the degradation." Tube collapse is defined as, "For the load displacement curve for a given structure, collapse occurs at the top of the load versus displacement curve where the slope of the curve becomes zero." The

Serial No. 06-0001 B Docket No. 50-336 inspection. If it is determined that tube integrity is not being maintained, ACTION b. applies.

of Insert B 314.4.5 I

I A Completion Time of 7 days is sufficient to complete the evaluation while minimizing the risk of plant operation with a SG tube that may not have tube integrity.

If the evaluation determines that the affected tube(s) have tube integrity, ACTION a.2 allows plant operation to continue until the next refueling outage or SG inspection provided the inspection interval continues to be supported by an operational assessment that reflects the affected tube(s).

However, the affected tube(s) must be plugged prior to entering HOT SHUTDOWN following the next refueling outage or SG inspection. This Completion Time is acceptable since operation until the next inspection is supported by the operational assessment.

b.1 and b.2 If the ACTIONS and associated Completion Times of ACTION a. are not met or if SG tube integrity is not being maintained, the reactor must be brought to HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

The allowed Completion Times are reasonable, based on operating experience, to reach the desired plant conditions from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE TS 4.4.5.1 REQUIREMENTS During shutdown periods the SGs are inspected as required by this SR and the Steam Generator Program. NEI 97-06, Steam Generator Program Guidelines (Reference I),

and its referenced EPRl Guidelines, establish the content of the Steam Generator Program. Use of the Steam Generator Program ensures thatthe inspection is appropriate and consistent with accepted industry practices.

During SG inspections a condition monitoring assessment of the SG tubes is performed. The condition monitoring assessment determines the "as found" condition of the SG tubes. The purpose of the condition monitoring assessment