ML071170330

From kanterella
Jump to navigation Jump to search
Reactor and Senior Reactor Operator Initial Examinations - Crystal River Examination Report - 05000302-07-301
ML071170330
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/27/2007
From: Haag R
Division of Reactor Safety II
To: Young D
Progress Energy Florida
References
50-302/07-301, NUREG-1021 ER-07-301
Download: ML071170330 (4)


See also: IR 05000302/2007301

Text

April 27, 2007

Mr. Dale E. Young, Vice President

Crystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing &

Regulatory Programs

15760 West Power Line Street

Crystal River, FL 34428-6708

SUBJECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -

CRYSTAL RIVER NUCLEAR PLANT 05000302/2007301

Dear Mr. Young:

In a telephone conversation on April 26, 2007, between Mr. Frank Dola, Supervisor, Licensed

Operator Initial Training, and Mr. Mark Bates, Senior Operations Engineer, arrangements were

made for the administration of licensing examinations at the Crystal River Nuclear Plant.

Arrangements were made to administer the written examination during the week of October 29,

2007 and the operating test during the weeks of October 22, 2007 and October 29, 2007. The

on-site preparatory week is scheduled for the week of October 1, 2007.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in Revision 9, of NUREG-1021, "Operator Licensing Examination Standards for

Power Reactors." The NRC regional office will discuss with your staff any changes that might

be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by August 17, 2007. The written examinations, operating tests, and the supporting

reference materials identified in Attachment 2 of ES-201 will be due by September 7, 2007.

Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall

approve the outlines, examinations, and tests before they are submitted to the NRC for review

and approval. All materials shall be complete and ready-to-use. Any delay in receiving the

required examination and reference materials, or the submittal of inadequate or incomplete

materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examination is being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior reactor operator license applications (Office of Management and Budget (OMB) approval

FPC

2

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any) (OMB approval number 3150-0090) at least 30 days before the examination

date. If the applications are not received at least 30 days before the examination date, a

postponement may be necessary. Signed applications certifying that all training has been

completed should be submitted at least 14 days before the examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0018, which expires on June 30, 2009. The

public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, and completing and reviewing the collection of information. Send comments on any

aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the

Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of

Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS

is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public

Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Dola has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mark Bates at (404) 562-4612, (Internet E-mail:

MAB7@NRC.GOV), or me at (404) 562-4607, (Internet E-mail: RCH@NRC.GOV).

Sincerely,

\\\\RA\\\\

Robert C. Haag, Chief

Operations Branch

Division of Reactor Safety

Docket No. 50-302

License No. DPR-72

cc: (See page 3)

FPC

3

cc contd:

Daniel L. Roderick

Director Site Operations

Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

Jon A. Franke

Plant General Manager

Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

Phyllis Dixon

Manager Nuclear Assessment

Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

Michael J. Annacone

Engineering Manager

Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

R. Alexander Glenn

Associate General Counsel (MAC - BT15A)

Florida Power Corporation

Electronic Mail Distribution

Steven R. Carr

Associate General Counsel - Legal Dept.

Progress Energy Service Company, LLC

Electronic Mail Distribution

Attorney General

Department of Legal Affairs

The Capitol PL-01

Tallahassee, FL 32399-1050

William A. Passetti

Bureau of Radiation Control

Department of Health

Electronic Mail Distribution

Craig Fugate, Director

Division of Emergency Preparedness

Department of Community Affairs

Electronic Mail Distribution

Chairman

Board of County Commissioners

Citrus County

110 N. Apopka Avenue

Inverness, FL 36250

Jim Mallay

Framatome Technologies

Electronic Mail Distribution

Ronald W. Davis,

Training Manager

Crystal River Nuclear Plant

8200 W Venable Street

Crystal River, FL 34429

_________________________

OFFICE

RII:DRS

RII:DRS

RII:DRP

SIGNATURE

MAB7

RCH

MEE

NAME

MBates

BHaag

MErnstes

DATE

4/27/2007

4/27/2007

4/27/2007

4/ /2007

4/ /2007

4/ /2007

4/ /2007

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO