|
---|
Category:Technical Specifications
MONTHYEARML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 RA-21-0320, License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits2021-12-20020 December 2021 License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits ML18355A6102019-01-25025 January 2019 Issuance of Amendments to Revise the Licensing Basis for Protection from Tornado Generated Missiles ML18318A3582019-01-16016 January 2019 Issuance of Amendment Nos. 311 and 290 to Correct Non-Conservative Technical Specification 3.4.11, Pressurizer Power Operated Relief Valves Porvs) RA-17-0051, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating2017-11-21021 November 2017 Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating ML17269A0552017-10-25025 October 2017 McGuire, Units 1 and 2 - Issuance of Amendments Adopting Technical Specification Task Force Traveler TSTF-283-A, Revision 3 (CAC NOS. MF9098 and MF9099) ML17248A4692017-08-29029 August 2017 Tech Spec and Tech Spec Bases TS-LOEP & TSB-LOES ML17237A0472017-08-17017 August 2017 Document Transmittal Form Regarding Technical Specification - List of Effected Pages (Rev. 111) RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML17087A2732017-03-22022 March 2017 Issue Tech Specification List of Affected Pages (Loep), Revision 108 ML17087A2722017-03-22022 March 2017 Renewed Facility Operating License - Amendment 293 ML16236A0532016-09-26026 September 2016 Issuance of Amendments Regarding One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval ML16243A3532016-08-17017 August 2016 Technical Specifications 5.5, Revision 1 - Amendment No. 276/256 ML16139A4612016-05-10010 May 2016 Technical Specification 3.3.1, Rev. 001, Amendments 283 and 262 ML16075A3012016-04-26026 April 2016 Issuance of Amendments Regarding the Revision of the Steam Generator Technical Specifications to Reflect the Adoption of TSTF-510(CAC Nos. MF6139,MF6140,MF6141,MF6142,MF6143,MF6144. ML16067A2292016-04-0808 April 2016 Issuance of Amendments Regarding Removal of Obsolete Technical Specification Requirements MNS-15-068, License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors.2016-03-24024 March 2016 License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors. ML15306A1412016-03-16016 March 2016 Issuance of License Amendment Regarding Nuclear Service Water System Allowed Outrage Time Extension ML16004A3522016-02-0303 February 2016 Issuance of Amendment Request to Revise Technical Specification for Residual Heat Removal System Air Handler Unit 1 ML15174A1732015-08-24024 August 2015 Issuance of Amendments Regarding Technical Specification Definition of Rated Thermal Power ML15133A4532015-06-11011 June 2015 McGuire Nuclear Station, Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Cyber Security Plan Implementation Schedule Milestone 8 ML15063A2712015-04-14014 April 2015 Issuance of Amendments Technical Specification 3.1.3, Moderator Temperature Coefficient and TS 5.6.5, Core Operating Limits Report. ML15119A2182015-04-0707 April 2015 Technical Specification (TS) and Tech Spec Bases (Tsb) Manual ML15027A3662015-03-25025 March 2015 Issuance of Amendments DPC-NE-3001-P, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology MNS-15-013, Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS Requirement2015-03-23023 March 2015 Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS Requirement ML15002A3242015-02-12012 February 2015 McGuire Nuclear Station, and Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Areas ML14231A6342014-09-10010 September 2014 Issuance of Amendments Regarding Technical Specification 3.8.4, DC Sources-Operating, ML14211A4032014-08-27027 August 2014 Issuance of Amendments Regarding Technical Specification 3.3.2 in Support of Compliance with NRC Order EA-12-049 ML14142A0112014-05-0505 May 2014 Technical Specification & Technical Specification Bases ML13316A0072013-10-31031 October 2013 Updated Technical Specifications Manual and Bases ML13277A3602013-09-24024 September 2013 Technical Specifications Bases ML13135A1332013-04-25025 April 2013 Annual Radioactive Effluent Release Report ML12340A4062012-11-27027 November 2012 Technical Specifications & Technical Specification Bases Updates. Includes Tsb Loes (Revision 114) & Tsb 3.6.15 (Entire Section) Rev 125 ML12240A1962012-09-29029 September 2012 Issuance of Amendments, Regarding Changes to Diesel Generator Starting Air Pressure Limits ML12229A1462012-08-0909 August 2012 License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement ML12082A2102012-03-0505 March 2012 License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML11341A1102011-12-0505 December 2011 License Amendment Request for Changes to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation, Function 16(e) ML11318A1172011-11-0909 November 2011 License Amendment Request for Temporary Changes to Technical Specifications and Limited Duration Use of NUREG-0800, Section 3.5.1.3, Revision 3, to Allow Nuclear Service Water System (Nsws) 'A' Train Repair ML11131A1332011-09-12012 September 2011 License Amendment, Issuance of Amendments Regarding Technical Specification Changes to Allow Manual Operation of the Containment Spray System ML11140A0882011-05-12012 May 2011 Request for Exemption from Certain Requirements of 10 CFR 72.212(a)(2), 72.212(b)(2)(i), 72.212(b)(7) and 72.214 ML1106603442011-02-28028 February 2011 Technical Specification and Tec Spec Bases Updates ML1103200662011-01-24024 January 2011 Notice of Enforcement Discretion Request (Noed), Technical Specification (TS) Limiting Condition for Operation (LCO) 3.0.3 ML1032700962010-12-20020 December 2010 License Amendment, Issuance of Amendments Regarding Revision of Technical Specification (TS) 3.8.4 DC (Direct Current) Sources - Operating. ML1032706582010-11-18018 November 2010 Response to Request for Additional Information to Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements ML1022803352010-08-0404 August 2010 Technical Specification Updates ML1019504512010-08-0202 August 2010 Issuance of Amendments Regarding Replacement of Source Range and Intermediate Range Encore Detection Systems with Equivalent Neutron Monitoring Systems Using Fission Chamber Detectors (TAC ME1749 & ME1750) ML1021503242010-06-28028 June 2010 Technical Specifications and Technical Specifications Bases Updates 2024-04-08
[Table view] |
Text
(4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts-as required any byproduct, source or special nuclear material without restrictionto chemical or physical form,- for sample -
analysis or instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproducts and special nuclear materials as may be produced by the operation of McGuire Nuclear Station, Units 1 and 2, and; (6) Pursuant to the Act and 10 CFR Parts 30 and 40, to receive, possess and process for release or transfer such byproduct material as may be produced by the Duke Training and Technology Center.
C. This renewed operating license shall be deemed to contain and Is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below.
(1) Maximum Power Level The licensee is authorized to operate the facility at a reactor core full steady state power level of 3411 megawatts thermal (100%).
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 239 are hereby Incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3) Updated Final Safety Analysis Report The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on December 16, 2002, describes certain future activities to be completed before the period of extended operation.
Duke shall complete these activities no later than June 12, 2021, and shall notify the NRC In writing when implementation of these activities is complete and can be verified by NRC Inspection.
The Updated Final Safety Analysis Report supplement as revised on December 16, 2002, described above, shall be Included Inthe next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71 (e)(4), following issuance of this renewed operating license.
Until that update is complete, Duke may make changes to the programs provided that Duke evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
Renewed License No. NPF-9 Amendment No. 239
\ \
(4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample_
analysis or instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproducts and special nuclear materials as may be produced by the operation of McGuire Nuclear Station, Units 1 and 2; and, (6) Pursuant to the Act and 10 CFR Parts 30 and 40, to receive, possess and process for release or transfer such byproduct material as may be produced by the Duke Training and-Technology Center.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below.
(1) Maximum Power Level The licensee is authorized to operate the facility at a reactor core full steady state power level of 341.1 megawatts thermal (100%).
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 221 are hereby incorporated into this renewed operating
- license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3) Updated Final Safety Analysis Report The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on December 16, 2002, describes certain future activities to be completed before the period of extended operation.
Duke shall complete these activities no later than March 3, 2023, and shall notify the NRC in writing when Implementation of these activities is complete and can be verified by NRC Inspection.
The Updated Final Safety Analysis Report supklement as revised on December 16, 2002, described above, shall be Included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71(e)(4), following issuance of this renewed operating license.
Until that update is complete, Duke may make changes to the programs described-in such supplement without-prior-Commission approval, provided that Duke evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59, and otherwise complies with the requirements in that section.
Renewed License No. NPF-17 Amendment No. 221
Organization 5.2 5.0 ADMINISTRATIVE CONTROLS 5.2 Organization 5.2.1 Onsite and Offsite Organizations Onsite and offsite organizations shall be established for unit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting safety of the nuclear power plant.
- a. Lines of authority, responsibility, and communication shall be defined and established throughout highest management levels, intermediate levels, and all operating organization positions. These relationships shall be documented and updated, as appropriate, in organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the UFSAR;
- b. The Station Manager shall be responsible for overall safe operation of the plant and shall have control over those onsite activities necessary for safe operation and maintenance of the plant;
- c. The Vice President of McGuire Nuclear Site shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety;
- d. The Group Vice President Nuclear Generation Department will be the Senior Nuclear Executive and have corporate responsibility for overall nuclear safety; and
- e. The individuals who train the operating staff, carry out radiation protection, or perform quality assurance functions may report to the appropriate onsite manager; however, these individuals shall have sufficient organizational freedom to ensure their independence from operating pressures.
(continued)
McGuire Units 1 and 2 5.2-1 Amendment Nos. 239, 221