Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML0636100612007-01-26026 January 2007 RAI, Response to Generic Letter 2003-01, Control Room Habitability, MB9840 Project stage: RAI ML0708904062007-03-22022 March 2007 Pilgrim, Response to NRC Request for Additional Information Regarding Response to Generic Letter 2003-001, Control Room Habitability Project stage: Response to RAI ML0715101912007-05-22022 May 2007 Pilgrim - Supplemental Follow-Up Response to NRC Generic Letter 2003-01 Project stage: Request ML0710902622007-06-0707 June 2007 NRC Receipt of Pilgrim Nuclear Power Station, Response to Generic Letter 2003-01 Control Room Habitability Project stage: Other 2007-03-22
[Table View] |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23300A0022023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 ML23143A0872023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 And Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 2024-09-18
[Table view] |
Text
En ter,ýEntergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Stephen J. Bethay Director, Nuclear Assessment March 22, 2007 U.S. Nuclear Regulatory Commission Attn: Document-Control Desk Washington, DC 20555
SUBJECT:
Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Docket 50-293 License No. DPR-35
REFERENCE:
Response to NRC Request for Additional Information Regarding Response to Generic Letter 2003-01 "Control Room Habitability" (TAC No. MB9840)1. NRC Letter "Pilgrim Nuclear Power Station -Request for Additional Information RE Response to Generic Letter 2003-01, Control Room Habitability" (TAC No. MB9840), dated 1/26/07 2. Entergy Letter 2.03.095, "Response to Generic Letter 2003-01, Control Room Habitability", dated 8/06/03 3. NRC Regulatory Guide 1.197, "Demonstrating Control Room SEnelope Integrity at Nuclear Power Reactors", dated May 2003 LETTER NUMBER: 2.07.015
Dear Sir or Madam:
This letter provides the response to the NRC request for additional information (Reference 1)regarding Entergy Nuclear Operations, Inc. (ENO), Pilgrim Nuclear Power Station's (PNPS)response to NRC GL 2003-01, 'Control Room Habitability," submitted to the NRC on August 6, 2003 (Reference 2). The additional information is provided in Attachment 1 to this letter.Attachment 2 contains the commitments made in this letter.If you have any questions or require additional information, please contact Mr. Bryan Ford, Licensing Manager, at (508) 830-8403.Sincerely, Director, Nuclear Safety Assura.n6e.
MJG/dI Entergy Nuclear Operations, Inc Pilgrim Nuclear Station Letter Number 2.07.015 Page 2
Attachment:
- 1. Entergy Response to NRC Request for Additional Information Regarding Response to Generic Letter 2003-01, "Control Room Habitability" (TAC No. MB9840)2. Summary of Commitments cc: Mr. James S. Kim, Project Manager Plant Licensing Branch I-1 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North 4D9A 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 U.S. Nuclear Regulator Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station Attachment 1 to letter 2.07.015 Entergy Response to NRC Request for Additional Information Regarding Response to Generic Letter 2003-01, "Control Room Habitability' (TAC No. MB9840)NRC RAI #1 Confirm that reactor control capability is maintained from either the control room or the alternate shutdown panel in the event of smoke (GL 2003-01, Item lb).Entergy Response Smoke inside of the main control room (MCR) return ductwork activates a smoke detector in the Main Control Room Environmental Control System (MCRECS) exhaust ductwork which in turn automatically places the system into the purge mode. The Control Room Operator can also manually place the MCRECS in the purge mode. This alignment supplies the MCR with 100% outside fresh air and sends the exhaust airflow outside of the building.During a fire or smoke event outside of the main control room that could compromise the Control Room Envelope (CRE) environment, if the fresh air intake draws smoke into the CRE the operators are directed by site procedures to place the Control Room ventilation in maximum recirculation mode and close one of the two control room supply dampers.If there is fire damage to the MCR, reactor control capability can be transferred to one of the fourteen Alternate Shutdown Panels (ASPs) located throughout the plant. These panels contain the controls and switches necessary to bring the plant to a Cold Shutdown condition.
The panels are designed such that MCR cables are bypassed when the panels are operated locally. Procedures provide instructions for shutting down and cooling the reactor from outside of the MCR.Based on the above, reactor control capability is still maintained in the event of smoke.NRC RAI #2 Explain how and at what frequency you confirm your control room envelope integrity and why this is adequate to demonstrate control room envelope integrity since you do not currently have a TS SR (GL 2003-01, Item 1 c).Entergy Response PNPS recently confirmed the CRE integrity through performance of a tracer gas test in December 2005. PNPS will submit a License Amendment Request (LAR) to adopt the Control Room Habitability Program as outlined in TSTF 448, rev. 3 by November 30, 2007.NRC RAI #3 Describe your plans to adopt TSTF -448 at Pilgrim, including a commitment to submit a license amendment request (LAR) based on TSTF -448.Enterqy Response PNPS will submit a License Amendment Request (LAR) to adopt TSTF-448 rev. 3 by November 30, 2007.Page 1 of 1 Attachment 2 to Letter 2.07.015 Summary of Commitments The following table identifies those actions committed to by Entergy in this document.Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
List of Regulatory Commitments TYPE SCHEDULED (Check one) COMPLETION ONE-TIME CONTINUING DATE (If Required)ACTION COMPLIANCE COMMITMENT Submit a License Amendment Request (LAR) to adopt TSTF-448 rev. 3 X 11/30/07 Page 1 of 1