January 26, 2007 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
PILGRIM NUCLEAR POWER STATION - REQUEST FOR ADDITIONAL INFORMATION RE: RESPONSE TO GENERIC LETTER 2003-01, CONTROL ROOM HABITABILITY (TAC NO. MB9840)
Dear Mr. Kansler:
By letters dated August 6, 2003 (Agencywide Documents Access and Management System
[ADAMS] Accession No. ML032260036), September 30, 2004 (ADAMS Accession No. ML042880297), and March 20, 2006 (ADAMS Accession No. ML060890468) Entergy Nuclear Operations, Inc. (Entergy), as operator of the Pilgrim Nuclear Power Station (Pilgrim),
responded to Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2003-01, Control Room Habitability for Pilgrim. The GL, requested confirmation that your facilitys control room meets the applicable habitability regulatory requirements and that the control room habitability systems are designed, constructed, configured, operated, and maintained in accordance with the facilitys design and licensing bases. Items 1b and 1c of the GL requested confirmation that reactor control capability is maintained from either the control room or the alternate shutdown panel in the event of smoke, and that your Technical Specification (TS) verify the integrity of the control room envelope, respectively. Item 1c requested that if your facility does not currently have TS surveillance requirements (SRs) for control room envelope integrity that you explain how and at what frequency you confirm your control room envelope integrity and why this is adequate to demonstrate control room envelope integrity.
In your September 30, 2004, response, you discussed the existence of an Alternate Shutdown Panel in Section 2.8, however, in your response to Item 1(b), you did not confirm that reactor control capability is maintained from either the control room or the alternate shutdown panel in the event of smoke which was specifically requested by GL 2003-01, Item 1b.
In your September 30, 2004, response, you stated that you plan to use the guidance developed by the NEI Technical Specification Task Force (TSTF) and inleakage test results to determine changes to the TSs if required. In your response, you did not mention any plans to adopt TSTF-448 Control Room Habitability.
Therefore, the NRC staff requests that you resubmit your response to Items 1b and 1c of GL 2003-01 as follows:
- 1.
Confirm that reactor control capability is maintained from either the control room or the alternate shutdown panel in the event of smoke (GL 2003-01, Item 1b).
- 2.
Explain how and at what frequency you confirm your control room envelope integrity and why this is adequate to demonstrate control room envelope integrity since you do not currently have a TS SR (GL 2003-01, Item 1c).
M. Kansler 3.
Describe your plans to adopt TSTF-448 at Pilgrim, including a commitment to submit a license amendment request (LAR) based on TSTF-448.
The commitment should include a milestone for completion (such as within 90 days of the NRCs approval of TSTF-448), or in the event that you decide not to submit an LAR to adopt applicable sections of TSTF-448 into your TSs, that you provide: (a) an acceptable alternative that includes an SR in accordance with Regulatory Guide 1.197 and NEI 99-03 that will be acceptable to the staff; and, (b) in light of the commitment made by the majority of the respondents to adopt applicable portions of TSTF-448, explain your rational (including any potential hardship) for not committing to the industry standard (GL 2003-01, Item 1c).
This request for additional information was discussed with your staff on December 27, 2006, and it was agreed that your response would be provided within 60 days from the date of this letter.
If you have any questions, please contact me at 301-415-1388.
Sincerely,
/RA/
James J. Shea, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page
M. Kansler 3.
Describe your plans to adopt TSTF-448 at Pilgrim, including a commitment to submit a license amendment request (LAR) based on TSTF-448.
The commitment should include a milestone for completion (such as within 90 days of the NRCs approval of TSTF-448), or in the event that you decide not to submit an LAR to adopt applicable sections of TSTF-448 into your TSs, that you provide: (a) an acceptable alternative that includes an SR in accordance with Regulatory Guide 1.197 and NEI 99-03 that will be acceptable to the staff; and, (b) in light of the commitment made by the majority of the respondents to adopt applicable portions of TSTF-448, explain your rational (including any potential hardship) for not committing to the industry standard (GL 2003-01, Item 1c).
This request for additional information was discussed with your staff on December 27, 2006, and it was agreed that your response would be provided within 60 days from the date of this letter.
If you have any questions, please contact me at 301-415-1388.
Sincerely,
/RA/
James J. Shea, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page DISTRIBUTION:
PUBLIC LPL1-1 R/F RidsNrrDorlLpl1-1 RidsOGCMailCenter RidsNrrDirsItsb RidsAcrsAcnwMailCenter RidsNrrPMJBoska RidsNrrLASLittle ECobey, RI CJackson JRobinson Accession Number: ML063610061 OFFICE LPL1-1\\PM LPL1-1\\LA SCVB\\BC PGCB\\BC LPL1-1\\BC NAME JShea SLittle RDennig CJackson JBoska DATE 01/04/07 01/11/07 11-07-06 01/26/07 01/26/07 Official Record Copy
Pilgrim Nuclear Power Station cc:
Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Senior Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA 02360 Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA 02332 Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 MA Department of Public Health Radiation Control Program Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129 Secretary of Public Safety Executive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426 Mr. Kevin H. Bronson General Manager, Plant Operations Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Stephen J. Bethay Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Bryan S. Ford Manager, Licensing Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
Pilgrim Nuclear Power Station cc:
Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Oscar Limpias Vice President, Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwarz Vice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.
639 Loyola Avenue New Orleans, LA 70113 Mr. James Sniezek 5486 Nithsdale Drive Salisbury, MD 21801-2490 Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306 Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA 19348