September 16, 2008 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
DRAFT SAFETY EVALUATION FOR NUCLEAR ENERGY INSTITUTE (NEI)
TOPICAL REPORT (TR) WCAP-16308-NP, REVISION 0, PRESSURIZED WATER REACTOR OWNERS GROUP [(PWROG)] 10 CFR [TITLE 10 OF THE CODE OF FEDERAL REGULATIONS] 50.69 PILOT PROGRAM -
CATEGORIZATION PROCESS - WOLF CREEK GENERATING STATION (TAC NO. MD4229)
Dear Mr. Riley:
By letter dated September 25, 2006, as supplemented by letters dated October 22, 2007, and July 15, 2008, the NEI submitted TR WCAP-16308-NP, Revision 0, Pressurized Water Reactor Owners Group 10 CFR 50.69 Pilot Program - Categorization Process - Wolf Creek Generating Station, to the U.S. Nuclear Regulatory Commission (NRC) staff for review on behalf of the PWROG. Enclosed for NEI review and comment is a copy of the NRC staff's draft safety evaluation (SE) for the TR.
Twenty working days are provided to you to comment on any factual errors or clarity concerns contained in the SE. The final SE will be issued after making any necessary changes and will be made publicly available. The NRC staff's disposition of your comments on the draft SE will be discussed in the final SE. To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SE showing proposed changes and provide a summary table of the proposed changes.
If you have any questions, please contact Sean Peters at 301-415-1842.
Sincerely,
/RA/
Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689
Enclosure:
Draft SE cc w/encl: See next page
September 16, 2008 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
DRAFT SAFETY EVALUATION FOR NUCLEAR ENERGY INSTITUTE (NEI)
TOPICAL REPORT (TR) WCAP-16308-NP, REVISION 0, PRESSURIZED WATER REACTOR OWNERS GROUP [(PWROG)] 10 CFR [TITLE 10 OF THE CODE OF FEDERAL REGULATIONS] 50.69 PILOT PROGRAM -
CATEGORIZATION PROCESS - WOLF CREEK GENERATING STATION (TAC NO. MD4229)
Dear Mr. Riley:
By letter dated September 25, 2006, as supplemented by letters dated October 22, 2007, and July 15, 2008, the NEI submitted TR WCAP-16308-NP, Revision 0, Pressurized Water Reactor Owners Group 10 CFR 50.69 Pilot Program - Categorization Process - Wolf Creek Generating Station, to the U.S. Nuclear Regulatory Commission (NRC) staff for review on behalf of the PWROG. Enclosed for NEI review and comment is a copy of the NRC staff's draft safety evaluation (SE) for the TR.
Twenty working days are provided to you to comment on any factual errors or clarity concerns contained in the SE. The final SE will be issued after making any necessary changes and will be made publicly available. The NRC staff's disposition of your comments on the draft SE will be discussed in the final SE. To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SE showing proposed changes and provide a summary table of the proposed changes.
If you have any questions, please contact Sean Peters at 301-415-1842.
Sincerely,
/RA/
Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689
Enclosure:
Draft SE cc w/encl: See next page DISTRIBUTION:
PUBLIC PSPB Reading File RidsNrrDpr JFair RidsNrrDprPspb RidsNrrPMTMensah RidsNrrLADBaxley RidsNrrDe RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNrrDci RidsNrrDeEmcb RidsNrrDra RidsNrrDciCptb RidsNrrDciCpnb RidsNrrSPeters TScarbrough KHoffman SDinsmore RidsNrrDraApla SRosenberg (HardCopy)
ADAMS ACCESSION NO.: ML082600748 (Package); ML082140863 (Letter); ML082140868 (Draft SE)
- No major changes to SE input.
NRR-043 OFFICE PSPB/PM PSPB/LA DCI/CPTB*
DCI/CPNB*
DE/EMCB DRA/APLA*
PSPB/BC NAME SPeters DBaxley JMcHale TChan KManoly MRubin SRosenberg DATE 08/01/08 8/18/08 07/08/08 07/08/08 08/22/08 07/22/08 09/16/08 OFFICIAL RECORD COPY
3/25/08 Nuclear Energy Institute Project No. 689 cc:
Mr. Anthony Pietrangelo, Vice President Regulatory Affairs Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org Mr. Jack Roe, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jwr@nei.org Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 brinkmcb@westinghouse.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com Mr. Alexander Marion, Executive Director Nuclear Operations & Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. John Butler, Director Safety-Focused Regulation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mike Melton, Senior Project Manager 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 man@nei.org Dennis Buschbaum PWROG Chairman Comanche Peak Steam Electric Station 6322 North Farm to Marked Rd 56 Mail Code E15 Glen Rose, TX 76043 Dennis.Buschbaum@luminant.com