Technical Specifications Pages, Revises the SSES 2 Cycle 14 Minimum Critical Power Ratio Safety Limit in Section 2.1.1.2. for Two-loop and Single-Loop Operation and the References Listed in Section 5
ML070810063
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 03/19/2007
From:
NRC/NRR/ADRO/DORL/LPLI-1
To:
References
TAC MD3595
Download: ML070810063 (3)


Text

(4)

PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal (100% power) in accordance with the conditions specified herein and in Attachment 1 to this license. The preoperational test, startup tests and other items identified in to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 218, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

For Surveillance Requirements (SRs) that are new in Amendment 151 to Facility Operating License No. NPF-22, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 151. For SRs that existed prior to Amendment 151, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 151.

2.C.(3)

PPL Susquehanna, LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Review Report for the facility and as approved in Fire Protection Program, Section 9.5, SER, SSER#1, SSER#2, SSER#3, SSER#4, SSER#6, Safety Evaluation of Fire Protection Report dated August 9, 1989, Safety Evaluation Amendment No. +, P, +&3, +50, +5+, +5-3, +62, +69, -2+, 2-+-3, 2+4, 2+5, 2+7, 218

PPL Rev.

SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow

< 10 million Ibm/hr:

THERMAL POWER shall be *25% RTP.

2.1.1.2 With the reactor steam dome pressure > 785 psig and core flow

> 10 million Ibm/hr:

MCPR shall be > 1.11 for two recirculation loop operation or > 1.14 for single recirculation loop operation.

2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.

2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be < 1325 psig.

2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:

2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.

SUSUQUEHANNA - UNIT 2 TS / 2.0-1 Amendment 1i-&

%14, 2184,1 14218

PPL Rev.

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 COLR (continued)

10.

ANF-524(P)(A), "ANF Critical Power Methodology for Boiling Water Reactors," Advanced Nuclear Fuels Corporation.

11.

ANF-913(P)(A), "COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses," Advanced Nuclear Fuels Corporation.

12.

ANF-1358(P)(A), "The Loss of Feedwater Heating Transient in Boiling

.Water Reactors," Advanced Nuclear Fuels Corporation.
13.

EMF-2209(P)(A), "SPCB Critical Power Correlation," Siemens Power Corporation.

14.

EMF-CC-074(P)(A), "BWR Stability Analysis - Assessment of STAIF with Input from MICROBURN-B2," Siemens Power Corporation.

15.

NE-092-001A, "Licensing Topical Report for Power Uprate With Increased Core Flow," Pennsylvania Power & Light Company.

16.

Caldon, Inc., "TOPICAL REPORT: Improving Thermal Power Accuracy and Plant Safety while Increasing Operating Power Level Using the LEFTMT4 System," Engineering Report - 80P.

17.

Caldon, Inc., "Supplement to Topical Report ER-80P: Basis for a Power Uprate with the LEFM/Tm or LEFM CheckPlusTM System," Engineering Report ER-160P.

18.

NEDO-32465-A, "BWROG Reactor Core Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications."

c.

The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.

d.

The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.

continued SUSQUEHANNA - UNIT 2 TS / 5.0-23 Amendment 1.r9 1193, 184, 1M0, 1.92, 1.94, a18