ML070680293
| ML070680293 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 02/27/2007 |
| From: | Gordon Peterson Duke Energy Carolinas, Duke Power Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML070680293 (6) | |
Text
Duke GARY R.
PETERSON d fPower, Vice President McGuire Nuclear Station A Duke Energy Company Duke Power MG01 VP / 12700 Hagers Ferry Rd.
Huntersville, NC 28078-9340 704 875 5333 704 875 4809 fax grpeters@duke-energy. corn February 27, 2007 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Subject:
Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC (Duke)
McGuire Nuclear Station, Unit 1 Docket Numbers 50-369 Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds
References:
1/ Letter from Duke to NRC, same subject, dated February 9, 2007.
2/
Letter from Duke to NRC, Relief Request 07-GO-001, dated January 24, 2007.
This letter supplements the reference letters and is in response to our phone conversations with NRC staff on February 21 and February 22, 2007.
McGuire commits to completing the mitigation of Alloy 600/82/182 Pressurizer Butt Welds for McGuire Unit 1 during the refueling outage in March of 2007 as previously stated in Reference Letter
- 1. McGuire also confirms the commitments stated in Reference Letter 2 regarding submitting mitigation information to the NRC following the McGuire Unit 1 restart.
The NRC will be informed if McGuire revises any of these commitments.
If there are any questions, please contact P.
T.
Vu at (704) 875-4302.
www.dukepower. com
U.S. Nuclear Regulatory Commission February 27, 2007 Page 2 Very truly yours, Gary R. Peterson Attachment
U.S. Nuclear Regulatory Commission February 27, 2007 Page 3 xc (with attachment):
W.D.
Travers, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 Atlanta, GA 30303 J.B. Brady, Senior Resident Inspector U.S. Nuclear Regulatory Commission McGuire Nuclear Station J.F. Stang, Jr., Senior Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 H4A Rockville, MD 20852-2738
U.S. Nuclear Regulatory Commission February 27, 2007 Page 4 bxc (with attachment):
B.G. Davenport (ON02DB)
R.D. Hart (CN01RC)
R.L. Gill (ECO50)
D.H. Llewellyn (EC07C)
C.R. Frye (EC07C)
J.M. Shuping (EC07C)
ELL (EC050)
C.J. Thomas (MG01RC)
K.L. Ashe (MG01RC)
P.T. Vu (MG01RC)
S.C. Ballard (MG05SE)
H.E. Vanpelt (MG05SE)
H.V. Dinh (MG05SE)
K.L. Crane (MG01RC)
Ricky Branch (MG01MM)
MNS Master File MC-801.01 (MG01DM)
U.S. Nuclear Regulatory Commission February 27, 2007 Page 5 Attachment Commitments
U.S. Nuclear Regulatory Commission February 27, 2007 Attachment Page 1 of 1 Commitments Inspection and Mitigation of Alloy 600/82/182 Pressurizer Butt Welds The following commitment is contained in this letter.
Action Commitment Completion Date Repair Mitigation of Alloy 600/82/182 1 EOC 18 Pressurizer Butt Welds for McGuire 3/2007 Unit 1 as stated in our February 9,
_2007 letter.