ML070610096
| ML070610096 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 02/27/2007 |
| From: | Bezilla M FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 3315 | |
| Download: ML070610096 (4) | |
Text
FENOC FirstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor, Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President - Nuclear Fax: 419-321-7582 10 CFR 26.71(d)
Docket Number 50-346 License Number NPF-3 Serial Number 3315 Febr.uary 27, 2007 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Semiannual Fitness-For-Duty Report, July - December 2006 for the Davis-Besse Nuclear Power Station Ladies and Gentlemen:
Pursuant to 10 CFR 26.71 (d), "Recordkeeping Requirements," FirstEnergy Nuclear Operating Company (FENOC) submits the semiannual Fitness-For-Duty (FFD) report for the period of July through December 2006 for the Davis-Besse Nuclear Power Station, Unit 1 (DBNPS). provides FENOC's DBNPS FFD Program Performance Data. Attachment 2 provides a summary of management actions taken by FENOC based on positive FFD testing results and presumptive positives, and a list of FFD event reports submitted by FENOC.
If you have any questions or require further information, please contact Mr. Dale R. Wuokko, Manager, Regulatory Compliance (Acting), at (419) 321-7120.
Very truly yours,
//
GMW/s Attachments cc:
Regional Administrator, NRC Region IIl DB-1 NRC/NRR Project Manager DB-1 Senior NRC Resident Inspector Utility Radiological Safety Board 401-1
Docket Number 50-346 License Number NPF-3 Serial Number 3315 Page 1 of 1 Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 FirstEneray Nuclear Operatinci Companv December 31, 2006 6 Months Ending Company Davis-Besse Nuclear Power Station Location Mark A. Hoffman, Supervisor, Nuclear Access Contact Name Cutoffs: Screen/Confirmation (ng/ml)
Z Appendix A to 10 CFR 26 (419) 321-7338 Phone Marijuana Cocaine Opiates 100/15 300/150 300/300 Amphetamines Phencyclidine Alcohol (%BAC) 1000/500 25/25 0.04 0.03 (work status 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or greater) 0.02 (work status 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or greater)
Testing Results Licensee Employees Long-Term Short-Term Contractor Personnel Contractor Personnel Average Number of Individuals in Random 832 0
98 Population Categories
- Tested
- Positive
- Tested
- Positive
- Tested
- Positive Pre-Access 60 0
0 0
81 3
For Post Accident 0
0 0
0 0
0 Cause Observed Behavior 2
0 0
0 1
1 Random 258 0
0 0
29 1
Follow-up 15 0
0 0
1 0
Other 0
0 0
0 0
0 Total 335 0
0 0
112 5
Breakdown of Confirmed Positive Tests for Specific Substances Mari-Refusal Subver-juari-Cocaine Opiates Amphe-Phency-Alcohol juana tamines clidine to test sion Licensee Employees 0
0 0
0 0
0 0
0 Long-Term Contractors 0
0 0
0 0
0 0
0 Short-Term Contractors 3
1 0
0 0
1 0
1 Total 3*
1 0
0 0
1 0
1*
5-
- One individual attempted to subvert testing - an observed test was confirmed positive for marijuana
Docket Number 50-346 License Number NPF-3 Serial Number 3315 Page 1 of 1 Fitness For Duty Report Performance Data and Summary of Management Actions From July 1, 2006, through December 31, 2006, the Davis Besse Nuclear Power Station (DBNPS) Fitness for Duty (FFD) records indicate the following results:
Licensee Employees Licensee individuals for all categories, no confirmed positives were reported.
Short-Term Contractors For Short-term Contractors, five individuals were confirmed positive for a single substance. All individuals were denied access to the facility.
Pre-Access Category:
In the pre-access category for short-term contractors, four individuals received confirmed posi-tive results for a single substance. Three of the confirmed positive results were for marijuana and one positive result was for alcohol.
Random Category:
In the random category under the short-term contractors, one individual was confirmed positive for cocaine.
For-Cause/Subversion:
One short-term contractor was tested under the pre-access category; however, the collected specimen was not within temperature range. The individual admitted to using someone else's specimen during an interview. An observed for-cause test was completed and the results were confirmed positive for marijuana. This individual was denied unescorted access for a minimum of three years due to his attempt to subvert the drug screening process and for testing positive for marijuana. This individual is counted as one of the confirmed positive results for marijuana in the Pre-Access Category above.
List of Events Reported No Fitness-For-Duty events were reported under the provisions of 10 CFR 26.73 by the DBNPS during this reporting period (July - December 2006).
Note: FENOC does not perform onsite initial drug screening tests; therefore, there are no unconfirmed positive results on which to base management actions.
Docket Number 50-346 License Number NPF-3 Serial Number 3315 Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager, Regulatory Compliance (Acting), at (419) 321-7120 at Davis-Besse of any questions regarding this document or associated regulatory commitments.
COMMITMENTS DUE DATE None N/A