Tech Spec Pages for Amendments 240 and 217 Regarding Standby Liquid Control System
ML070600510
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 02/28/2007
From:
NRC/NRR/ADRO/DORL/LPLI-1
To:
References
TAC MD1424, TAC MD1425
Download: ML070600510 (10)


Text

(4) PPLSu.squehann-a,-LLC, pursuant to the Act and 1C0 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal in accordance with the conditions specified herein and in Attachment 1 to this license. The preoperational tests, startup tests and other items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 240, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

For Surveillance Requirements (SRs) that are new in Amendment 178 to Facility Operating License No. NPF-1 4, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 178. For SRs that existed prior to Amendment 178, including SRs with modified acceptance criteria and SRs whose fromn,,nnn nf nh=rfnrmnnr, is heinn avt-nridrl th' first n-rfnrm-nncn r .... ..

it. rh ir.

at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 178.

(3) Conduct of Work Activities During Fuel Load and Initial Startup The operating licensee shall review by committee all facility construction, Preoperationa! Tetinn , anr System Demonstration -activitiesperformed concurrently with facility initial fuel loading or with the facility Startup Test Amendment No. 5, +-4-9,+7-8, +8e, +88, +94, 2L35, 2-36, 28-7, 238, 240

PPL Rev.

SLC SYSTEM 3.1.7 3.1 REACTIVITY CONTROL SYSTEMS 3.1.7 - -Standby Liquid Control (SLC) System LCO 3.1.7 Two SLC subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Concentration of sodium A. 1 Restore concentration of 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br /> pentaborate in solution is sodium pentaborate in not within limits of solution to within limits of Figure 3.1.7-1. Figure 3.1.7-1.

B. One SLC subsystem B.1 Restore SLC subsystem to 7 days inoperable for reasons OPERABLE status.

other than Condition A.

C. Two SLC subsystems C.1 Restore one SLC subsystem to 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br /> inoperable for reasons OPERABLE status.

other than Condition A.

D. Required Action and D.1 Be in MODE 3 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> associated Completion Time not met. AND D.2 Be in MODE 4 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br /> SUSQUEHANNA- UNIT 1 3.1-20 Amendment 1.7-6,224 240

PPL Rev.

SLC SYSTEM 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.7.1 Verify available volume of sodium pentaborate 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> solution is within the limits of Figure 3.1.7-1.

SR 3.1.7.2 Verify temperature of sodium pentaborate solution 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> is within the limits of Figure 3.1.7-2.

SR 3.1.7.3 Verify temperature of pump suction piping is within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> the limits of Figure 3.1.7-2.

SR 3.1.7.4 Verify continuity of explosive charge. 31 days SR 3.1.7.5 Verify the concentration of sodium pentaborate in 31 days solution is within the limits of Figure 3.1.7-1.

AND Once within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> after water or sodium pentaborate is added to solution AND Once within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> after solution temperature is restored within the limits of Figure 3.1.7-2 (continued)

SUSQUEHANNA - UNIT 1 3.1-21 Amendment 240

PPL Rev, SLC SYSTEM 3.1.7 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.1.7.6 Verify each SLC subsystem manual and power 31 days operated valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position, or can be aligned to the correct position.

SR 3.1.7.7 Verify each pump develops a flow rate Ž40.0 gpm In accordance with the at a discharge pressure Ž 1250 psig. Inservice Testing Program SR 3.1.7.8 Verify flow through one SLC subsystem pump into 24 months on a reactor pressure vessel. STAGGERED TEST BASIS SR 3.1.7.9 Verify all heat traced piping between storage tank 24 months and pump suction is unblocked.

AND Once within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> after solution temperature is restored within the limits of Figure 3.1.7-2 SR 3.1.7.10 Verify sodium pentaborate enrichment is Prior to addition to SLC tank.

Ž88 atom percent B-10.

SUSQUEHANNA - UNIT 1 TS / 3.1-22 Amendment 1-7-8, 221 240

PPL Rev.

SLC SYSTEM 3.1.7 FIGURE 3.1.7-1 Sodium Pentaborate Solution Volume Versus Concentration Requirements 12-0- 11 SRegion of Approved 010-C 10 - 14 S* (1350, 10)C Volume/Concentration 04-0 0 (1350,,10)

V) 7 6 I 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 Net Storage Tank Volume (gallons)

SUSQUEHANNA - UNIT 1 3.1-23 Amendment t?7' 240

(4) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal (100% power) in accordance with the conditions specified herein and in Attachment 1 to this license. The preoperational test, startup tests and other items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 217, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

For Surveillance Requirements (SRs) that are new in Amendment 151 to Facility Operating License No. NPF-22, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 151. For SRs that existed prior to Amendment 151, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to

-implementation -of-Amendment 151-, -. .. .. .. .. . .

2.C.(3) PPL Susquehanna, LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Review Report for the facility and as approved in Fire Protection Program, Section 9.5, SER, SSER#1, SSER#2, SSER#3, SSER#4, SSER#6, Safety Evaluation of Fire Protection Report dated August 9, 1989, Safety Evaluation Amendment No. +, 2, +&3, 1-5, +5+, +53, +62, +69, 2+2, 2+3, 2+4, 2-1-5, 217

PPL Rev.

SLC System 3.1.7 3.1 REACTIVITY CONTROL SYSTEMS 3.1.7 Standby Liquid Control (SLC) System LCO 3.1.7 Two SLC subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Concentration of sodium A.1 Restore concentration of 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br /> pentaborate in solution is sodium pentaborate in solution not within limits of to within limits of Figure 3.1.7-1. Figure 3.1.7-1.

B. One SLC subsystem B.1 Restore SLC subsystem to 7 days inoperable for reasons OPERABLE status.

other than Condition A.

C. Two SLC subsystems C.1 Restore one SLC subsystem to 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br /> inoperable for reasons OPERABLE status.

other than Condition A.

D. Required Action and D.1 Be in MODE 3 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> associated Completion Time not met. AND D.2 Be in MODE 4 SUSQUEHANNA - UNIT 2. 3.1-20 Amendment 10, 2/6 217

PPL Rev.

SLC System 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.7.1 Verify available volume of sodium pentaborate 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> solution is within the limits of Figure 3.1.7-1.

SR 3.1.7.2 Verify temperature of sodium pentaborate solution 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> is within the limits of Figure 3.1.7-2.

SR 3.1.7.3 Verify temperature of pump suction piping is within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> the limits of Figure 3.1.7-2.

SR 3.1.7.4 Verify continuity of explosive charge. 31 days SR 3.1.7.5 Verify the concentration of sodium pentaborate in 31 days solution is within the limits of Figure 3.1.7-1.

AND Once within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> after water or sodium pentaborate is added to solution AND Once within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> after solution temperature is restored within the limits of Figure 3.1.7-2 (continued)

SUSQUEHANNA - UNIT 2 3.1-21 Amendment 171 217

PPL Rev.

SLC System 3.1.7 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.1.7.6 Verify each SLC subsystem manuai and power 31 days operated valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position, or can be aligned to the correct position.

SR 3.1.7.7 Verify each pump develops a flow rate >_40.0 gpm In accordance with the at a discharge pressure > 1250 psig. Inservice Testing Program SR 3.1.7.8 Verify flow through one SLC subsystem pump into 24 months on a reactor pressure vessel. STAGGERED TEST BASIS SR 3.1.7.9 Verify all heat traced piping between storage tank 24 months and pump suction is unblocked.

AND Once within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> after solution temperature is restored within the limits of Figure 3.1.7-2 SR 3.1.7.10 Verify sodium pentaborate enrichment is Ž88 Prior to addition to SLC tank.

atom percent B-1 0.

SUSQUEHANNA - UNIT 2 TS / 3.1-22 Amendment 1<51-, 1CI 217

PPL Rev.

SLC System 3.1.7 FIGURE 3.1.7-1 Sodium Pentaborate Solution Volume Versus Sodium Pentaborate Solution Volume Versus Concentration Requirements 12-0-

o 11 4-) Region of Approved 0=0 (1350, (5

10) Volume/Concentration 0 '9 0..

(1965, 7) 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 Net Storage Tank Volume (gallons)

SUSQUEHANNA - UNiT 2 3. 1-23 Amendment 1'61 217