ML070810070

From kanterella
Jump to navigation Jump to search

Tech Spec Pages, Correction to Amendment No. 217 (TAC No. MD1425), Technical Specifications, 3.1 Reactivity Control Systems
ML070810070
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 03/19/2007
From:
NRC/NRR/ADRO/DORL/LPLI-1
To:
References
TAC MD1425
Download: ML070810070 (3)


Text

PPL Rev.

SLC System 3.1.7 3.1 REACTIVITY CONTROL SYSTEMS 3.1.7 Standby Liquid Control (SLC) System LCO 3.1.7 Two SLC subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Concentration of sodium A.1 Restore concentration of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> pentaborate in solution is sodium pentaborate in solution not within limits of to within limits of Figure 3.1.7-1. Figure 3.1.7-1.

B. One SLC subsystem B.1 Restore SLC subsystem to 7 days inoperable for reasons OPERABLE status. I other than Condition A.

C. Two SLC subsystems C.1 Restore one SLC subsystem to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable for reasons OPERABLE status.

other than Condition A.

D. Required Action and D.1 Be in MODE 3 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. AND D.2 Be in MODE 4 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SUSQUEHANNA - UNIT 2 3.1-20 Amendment 1 /1, 2#217 Pevise ly letter dated March 19, 2)07