ML070810070
| ML070810070 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/19/2007 |
| From: | NRC/NRR/ADRO/DORL/LPLI-1 |
| To: | |
| References | |
| TAC MD1425 | |
| Download: ML070810070 (3) | |
Text
PPL Rev.
SLC System 3.1.7 3.1 REACTIVITY CONTROL SYSTEMS 3.1.7 Standby Liquid Control (SLC) System LCO 3.1.7 Two SLC subsystems shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Concentration of sodium A.1 Restore concentration of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> pentaborate in solution is sodium pentaborate in solution not within limits of to within limits of Figure 3.1.7-1.
Figure 3.1.7-1.
B.
One SLC subsystem B.1 Restore SLC subsystem to 7 days inoperable for reasons OPERABLE status.
other than Condition A.
C.
Two SLC subsystems C.1 Restore one SLC subsystem to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable for reasons OPERABLE status.
other than Condition A.
D.
Required Action and D.1 Be in MODE 3 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
AND D.2 Be in MODE 4 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I
SUSQUEHANNA - UNIT 2 3.1-20 Amendment 1 /1, 2#217 Pevise ly letter dated March 19, 2)07