Harris Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2007 09:48:20 Report 22 3
PSB1-EP
- EP EXERCISE Baseline Inspections 04/09/2007 04/13/2007 1
7111401 IP Exercise Evaluation Baseline Inspections 04/09/2007 04/13/2007 1
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 04/09/2007 04/13/2007 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 04/09/2007 04/13/2007 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 04/09/2007 04/13/2007 1
71151-EP03 IP Alert & Notification System 2
- REQUAL INSPECTION Baseline Inspections 05/21/2007 05/25/2007 1
7111111B IP Licensed Operator Requalification Program 1
PSB1-RP
- RP PUBLIC PRE-INSP. VISIT Baseline Inspections 06/11/2007 06/13/2007 1
7112101 IP Access Control to Radiologically Significant Areas 5
LIC RENE
- LICENSE RENEWAL INSPECTION License Renewal Insp 07/09/2007 07/27/2007 1
71002 IP License Renewal Inspection 5
OL PREP
- INITIAL EXAM PREP Not Applicable 07/09/2007 07/13/2007 1
V23259 HARRIS/JULY 2007 EXAM AT POWER FACILIITES 4
PSB1-RP
- RP PUBLIC BASELINE INSP Baseline Inspections 07/09/2007 07/13/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/09/2007 07/13/2007 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 07/09/2007 07/13/2007 1
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/09/2007 07/13/2007 1
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/09/2007 07/13/2007 1
71151 IP Performance Indicator Verification 4
PI&R WK1
- PI&R INSPECTION - WK 1 Baseline Inspections 07/30/2007 08/03/2007 1
71152B IP Identification and Resolution of Problems 5
OL EXAM
- INITIAL EXAM Not Applicable 08/06/2007 08/17/2007 1
V23259 HARRIS/JULY 2007 EXAM AT POWER FACILIITES 4
PI&R WK2
- PI&R INSPECTION - WK 2 Baseline Inspections 08/13/2007 08/17/2007 1
71152B IP Identification and Resolution of Problems 1
EB3-HS
- HEAT SINK Baseline Inspections 09/10/2007 09/14/2007 1
7111107B IP Heat Sink Performance 1
EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)
Safety Issues 10/07/2007 10/12/2007 1
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
2 EB3-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 10/08/2007 10/12/2007 1
7111108P IP Inservice Inspection Activities - PWR 4
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 02/25/2008 02/29/2008 1
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 02/25/2008 02/29/2008 1
7111117B IP Permanent Plant Modifications This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Harris Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2007 09:48:20 Report 22 6
EB1-CDBI
- COMPONENT DESIGN BASIS INSPECTION Baseline Inspections 03/31/2008 04/04/2008 1
7111121 IP Component Design Bases Inspection Baseline Inspections 04/14/2008 04/18/2008 1
7111121 IP Component Design Bases Inspection Baseline Inspections 04/28/2008 05/02/2008 1
7111121 IP Component Design Bases Inspection Baseline Inspections 05/12/2008 05/16/2008 1
7111121 IP Component Design Bases Inspection 1
PSB1-EP
- EP INSP Baseline Inspections 04/07/2008 04/11/2008 1
7111402 IP Alert and Notification System Testing Baseline Inspections 04/07/2008 04/11/2008 1
7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 04/07/2008 04/11/2008 1
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 04/07/2008 04/11/2008 1
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 04/07/2008 04/11/2008 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 04/07/2008 04/11/2008 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 04/07/2008 04/11/2008 1
71151-EP03 IP Alert & Notification System 4
PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 08/25/2008 08/29/2008 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 08/25/2008 08/29/2008 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 08/25/2008 08/29/2008 1
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 08/25/2008 08/29/2008 1
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 08/25/2008 08/29/2008 1
71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 08/25/2008 08/29/2008 1
71151-PR01 IP RETS/ODCM Radiological Effluent 5
EB2-TFP
- TRIENNIAL FIRE PROTECTION Baseline Inspections 09/02/2008 09/04/2008 1
7111105T IP Fire Protection [Triennial]
Baseline Inspections 09/22/2008 09/26/2008 1
7111105T IP Fire Protection [Triennial]
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.