ML070470208

From kanterella
Jump to navigation Jump to search
Inservice Inspection Owner'S Activity Report
ML070470208
Person / Time
Site: Surry Dominion icon.png
Issue date: 02/15/2007
From: Gerald Bichof
Dominion, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
07-0062
Download: ML070470208 (8)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 2326 1 February 15, 2007 U.S. Nuclear Regulatory Commission Serial No.: 07-0062 Attention: Document Control Desk NLOSIGDM: RO Washington, D.C. 20555 Docket No.: 50-281 License No.: DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

SURRY POWER STATION UNIT 2 INSERVICE INSPECTION OWNER'S ACTIVITY REPORT As allowed by ASME Code Case N-532-1, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1," the Form OAR-1 for Surry Unit 2 refueling outage S2R20 is enclosed. This document contains reporting requirements for the first period of the fourth ten-year inservice inspection interval for Surry Unit 2 from May 24, 2005 through the duration of the S2R20 refueling outage that was completed on November 20, 2006. The first period ends on May 9,2007.

Should you have any questions regarding this submittal, please contact Mr. Gary Miller at (804) 273-2771.

Very truly yours,

%erald T. Bischof (/

Vice President - Nuclear Engineering Commitments made in this letter: None

Attachment:

1. Owner's Activity Report (Form OAR-I), Surry Unit 2 Refueling Outage S2R20, First Period of the Fourth Ten-Year IS1 Interval

Serial No.07-0062 Docket No. 50-281 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I1 Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23 T85 Atlanta, Georgia 30303 Mr. N. P. Garrett NRC Senior Resident lnspector Surry Power Station Mr. S. P. Lingam NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9A Rockville, Maryland 20852 Mr. L. N. Olshan NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9A Rockville, Maryland 20852 Mr. R. A. Smith Authorized Nuclear lnspector Surry Power Station

Serial No.07-0062 Docket No. 50-281 Attachment Owner's Activity Report (Form OAR-I)

Surry Unit 2 Refueling Outage S2R20 First Period of the Fourth Ten-Year IS1 Interval Virginia Electric and Power Company (Dominion)

SURRY POWER STATION, S2 R20 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT

. th Report Number: 2 1 - 2 ! l l n l o ~ 3 4 . 1 st p .

eud, 7nd R Owner Virginia Electric and Power Company, 5000 Dominion Boulevard, Glen Allen, VA 23060 Unit No. 2 Commercial service date 05/01/73 Refueling outage no. S2 R20 Current inspection interval dth Current inspection period 1St Edition and Addenda of Section XI applicable to the inspection plan 199812000 Edition Date and revision of inspection plan IS1 Plan Revision 3 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan NA I CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.

N/A Expiration Date N/A Date 2 - r-07 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Virqinia and employed by HSB - CT of Hartford. CT have inspected the items described in this Owner's Activity Report, during the period 5/24/05 to 11/20/06 , and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs. replacements, evaluations and corrective measures described in this report. Furthermore, neither the inspector nor his employer shall be liable, in any manner for any personal injury or property damage or loss of any kind arising with this inspection.

Commissions VA 883(R)

Inspector's Signature National Board, State, Province, and Endorsements Date dl/?/-

SURRY POWER STATION UNIT 2 S2 R20 OUTAGE FORM OAR-I OWNER'S ACTIVITY REPORT TABLE I ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinations Examinations Examinations Credited (%) To Examination Required for Credited for Credited (%) Date for The Category The Interval This Period* For The Interval Remarks Period**

B-A 0% Note 3 Note 4 B-D Note 4 Note 5 Note 5 B-K Note 6 Note 6 Note 5 Note 6 Note 6 B-0 Note 6 B-P Note 1 B-Q Note 7 C-A Note 4 C-B Note 4 C-C C-F-1 C-F-2 C-H Note 2 D-A D-B Note 2 F-A R-A

  • This number reflects only examinations completed during this report period 5/24/05 to 11/20/06.
    • This percentage reflects total examinations completed within the 1st Period.

Note 1 The Class 1 leakage test is performed every refueling outage and was completed on 11/19/06.

Note 2 The numbers represent total number of periods over the inspection interval. The 1st Period ends May 9, 2007 at which time all System Pressure Tests should be completed for the period.

Note 3 Deferral is permissible by the Code and Code Case N-623.

Note 4 Relief Request CMP-007 was approved for certain welds that will now be covered by VT-2 exams in conjunction with the period System Pressure Test. Total required changed.

Note 5 Total examinations required will change based on when a pump or valve is disassembled for maintenance, repair or examination.

Note 6 Deferral is permissible per the Code.

Note 7 The extent and frequency of Steam Generator eddy current testing is governed by Surry Technical Specifications.

SURRY POWER STATION UNIT 2 S2 R20 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE Flaw or Relevant Condition Found During Scheduled Section XI Exam Item Flaw Characterization Exam or Test Category Number Item Description (IWA-3300) (Yes or No)

None for this reporting period.

SURRY POWER STATION UNIT 2 S2 R20 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Condition Found Repair, During Replacement, Scheduled Date WR Code or Corrective Item Description Description of Work Section XI Completed Plan #

Class Measure Examination or I I Test 1 Replacement I Boric acid found on flange 1 Replace fasteners Yes 2

3 3 ..

4"-WS-569-1136 3 Repair I ID weld repair of 96" pipe I Weld repair