Technical Specifications, Increase the Allowed Outage Time from 72 Hours to 7 Days for the Inoperability of the Steam Supply to the Turbine-Driven AFW Pump or the Inoperability of the Turbine-Driven AFW
ML070330612
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/31/2007
From: Nerses V
NRC/NRR/ADRO/DORL/LPLI-2
To: Christian D
Dominion Nuclear Connecticut
nerses V, NRR//DORL, 415-1484
Shared Package
ML070310571 List:
References
TAC MD0028
Download: ML070330612 (4)


Text

Connecticut, in accordance with the procedures and limitations set forth in this renewed operating license; (2) Pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to .receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level The licensee is authorized to operate the facility at steady-state reactor core power levels not in excess of 2700 megawatts thermal.

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 2 9 7 , are hereby incorporated in the renewed license.

The licensee shall operate the facility in accordance with the Technical Specifications.

Renewed License No. DPR-65

PLANT SYSTEMS AUXILIARY FEEDWATER PUMPS LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three steam generator auxiliary feedwater pumps shall be OPERABLE with:

a. Two feedwater pumps capable of being powered from separate OPERABLE emergency busses, and
b. One feedwater pump capable of being powered from an OPERABLE steam supply system.

APPLICABILITY: MODES 1, 2 and 3.

ACTION:

Inoperable Equipment Required ACTION I

a. Turbine-driven auxiliary feedwater pump due to one steam supply being inoperable.
a. Restore affected equipment to OPERABLE status within 7 days. If these ACTIONS are not met, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT I

SHUTDOWN within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b. b. Restore affected equipment to OPERABLE status within 7 days. If these ACTIONS are not met, be in at least

NOTE - -- - HOT SHUTDOWN within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Only applicable if MODE 2 has not been entered following REFUELING One turbine-driven auxiliary feedwater pump in MODE 3 following REFUELING

c. One auxiliary feedwater pump c. Restore the auxiliary feedwater pump to OPERABLE in MODE 1, 2, or 3 for reasons status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. If these ACTIONS are not met, other than a. or b. above, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
d. Two auxiliary feedwater d. Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in pumps in MODE 1, 2, or 3. HOT SHUTDOWN within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

MILLSTONE - UNIT 2 3/4 7-4 Amendment No. 64, 6, 90, 44-, -236, 297

PLANT SYSTEMS AUXILIARY FEEDWATER PUMPS LIMITING CONDITION FOR OPERATION ACTION: (Continued)

Inoperable Equipment Required ACTION

e. Three auxiliary feedwater e.

pumps in MODE 1, 2, or 3.

- - - - - -- NOTE LCO 3.0.3 and all other LCO required ACTIONS requiring MODE changes are suspended until one AFW pump is restored to OPERABLE status.

Immediately initiate ACTION to restore one auxiliary feedwater pump to OPERABLE status.

SURVEILLANCE REQUIREMENTS 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE:

a. At least once per 31 days by verifying each auxiliary feedwater manual, power operated, and automatic valve in each water flow path and in each steam supply flow path to the steam turbine driven pump, that is not locked, sealed, or otherwise secured in position, is in the correct position.
b. By verifying the developed head of each auxiliary feedwater pump at the flow test point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5. (Not required to be performed for the steam turbine driven auxiliary feedwater pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after reaching 800 psig in the steam generators. The provisions of Specification 4.0.4 are not applicable to the steam turbine driven auxiliary feedwater pump for entry into MODE 3.)

MILLSTONE - UNIT 2 3/4 7-5 Amendment No. *--, 6-3, 28Z, 2 9 7

PLANT SYSTEMS AUXILIARY FEEDWATER PUMPS SURVEILLANCE REQUIREMENTS (Continued)

c. At least once per 18 months by verifying each auxiliary feedwater automatic valve that is not locked, sealed, or otherwise secured in position, actuates to the correct position, as designed, on an actual or simulated actuation signal.
d. At least once per 18 months by verifying each auxiliary feedwater pump starts automatically, as designed, on an actual or simulated actuation signal.
e. By verifying the proper alignment of the required auxiliary feedwater flow paths by verifying flow from the condensate storage tank to each steam generator prior to entering MODE 2 whenever the unit has been in MODE 5, MODE 6, or defueled for a cumulative period of greater than 30 days.

MILLSTONE - UNIT 2 3/4 7-5a Amendment No. 297 1