ML070300112
| ML070300112 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 01/26/2007 |
| From: | James Smith Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| EA-03-009 | |
| Download: ML070300112 (37) | |
Text
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 JAN 2 6 2007 U.
S.
Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555-0001 Gentlemen:
In the Matter of Tennessee Valley Authority
))
Docket No.
50-390 WATTS BAR NUCLEAR PLANT (WBN)
UNIT 1 -
FIRST REVISED NRC ORDER EA-03-009 ESTABLISHING INTERIM INSPECTION REQUIREMENTS FOR REACTOR PRESSURE VESSEL HEADS AT PRESSURIZED WATER REACTORS (PWRs)
BARE METAL INSPECTION RESULTS
References:
Unit 1 -
NRC Order EA-03-009 -
Interim Inspection Requirements for Reactor Pressure Vessel Heads (TAC No.
MB 7667) and Bulletin 2003-02 Leakage from Reactor Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity (TAC No.
MC 0576)"
- 2) NRC letter to TVA dated February 20,
- 2004, "Issuance of First Revised Order (EA-03-009)
Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors"
- 3)
TVA letter to NRC dated March 11, 2004, "Watts Bar Nuclear Plant (WBN)
Unit 1 -
Response to Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel (RPV)
Heads at Pressurized Water Reactors (PWRs)"
A/~oI Pr~,ted or, rcce e
U.S. Nuclear Regulatory Commission Page 2 JAN 2 6 2007 This letter provides the WBN Unit 1 60-day response to the reporting requirements listed in Section IV, Paragraph E of the First Revised NRC Order EA-03-009 dated February 20, 2004.
TVA consented to the First Revised Order for WBN in the Reference 3 letter. provides excerpts from the report entitled, "Watts Bar Unit 1, Cycle 07 Reactor Pressure Vessel Closure Head and Lower Head Remote Visual (VT-2)
Examination Final Report -
September 2006)"
which documents the complete inspection of the reactor pressure vessel (RPV) closure head and lower head.
The excerpts included in provide the details of the inspection results for the RPV closure head.
This is the second bare metal visual inspection of the RPV closure head performed in accordance with NRC Order EA-03-009.
The results of the first bare metal inspection of the RPV were provided in the Reference 1 letter.
Section IV, Paragraph C(3) of the subject order for plants that fall within the low susceptibility category require a bare metal visual examination of 100 percent of the RPV head surface (including 360 degrees around each RPV head penetration nozzle) at least every third refueling outage or every 5 years.
The results of the WBN Unit 1 Cycle 7 outage inspection identified that no penetration indicated boron leakage in the area of the annulus associated with inside surface CRDM weld cracking.
In addition, no boron was noted on the head surface with the origination point being from the penetrations.
Each penetration was accessible and satisfactorily examined.
Details of the closure head visual examination are provided in.
There are no regulatory commitments associated with this submittal.
If you have any questions concerning this matter, please call me at (423) 365-1824.
Sincerely, J.
D. Smith Manager, Site Licensing and Industry Affairs (Acting)
Enclosure cc:
See Page 2
U.S. Nuclear Regulatory Commission Page 3 JAN 2 6 2007 Enclosures cc (Enclosures):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr.
Brendan T. Moroney, Project Manager U.S.
Nuclear Regulatory Commission MS 08G9a One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 Atlanta, Georgia 30303
U.S. Nuclear Regulatory Commission Page 4 JAN 2 6 2007 JDS:BJT Enclosures cc (Enclosures):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr.
Brendan T.
Moroney, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9a One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S.
Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 Atlanta, Georgia 30303 A.
S.
H. Bryan, BR 4X-C J.
E.
- Hinman, ADM IB-WBN A. M. Hinson, EQB 2A-WBN M. J.
J. E.
Semelsberger, EQB 2W-WBN K. W. Singer, LP 6A-C M. D. Skaggs, ADM 1V-WBN E. J.
Vigluicci, WT 6A-K B. A. Wetzel, BR 4X-C K. W. Whittenburg, SP2B-C Sequoyah Licensing Files, OPS 4C-SQN
ENCLOSURE 1 Excerpts from Report "Watts Bar Unit 1, Cycle 07 Reactor Pressure Vessel Closure Head and Lower Head Remote Visual (VT-2) Examination Final Report -
September 2006)"
ENCLOSURE 1
Excerpts from Report "Watts Bar Unit 1, Cycle 07 Reactor Pressure Vessel Closure Head and Lower Head Remote Visual (VT-2) Examination Final Report -
September 2006)"
T69 061122 115
,Q& /2- /3 WATTS BAR UNIT 1, CYCLE 07 REACTOR PRESSURE VESSEL CLOSURE HEAD AND LOWER HEAD REMOTE VISUAL (VT-2)
EXAMINATION
- FINAL REPORT - SEPTEMBER 2006 Prepared for:
Component Engineering Prepared by:
Inspection Services Organization tan Lockwood, ISI NDE uperv i isor
- fank Lelonard, NDAELeve~l III V-isuýal J.:,,e(f, Date Date
Watts Bar Unit 1, Cycle 7 - RPV Closure Head REPORT Remote Visual (VT-2) Penetration Examination Final Report Section Description 1.0 Examination Report 2.0 Exam Results:
Sorted by Penetration L.D and Scan Paths 3.0 Photographs 4.0 Resolution Verification 5.0 Scan Path Map 1
Watts Bar Unit 1, Cycle 7 - RPV Closure Head REPORT Remote Visual (VT-2) Penetration Examination Final Report Visual Examination Report Summary INTRODUCTION During the Watts Bar Unit 1, Cycle 7 Refueling Outage, remote visual (VT) examinations were performed on the outside surface of the Reactor Pressure Vessel (RPV) Closure Head and penetrations. The examinations were performed from September 17 - 18, 2006 by Tennessee Valley Authority's (TVA's) Inspection Services Organization (ISO) and Vistas Corporation.
SUMMARY
The VT examinations were accomplished to address the integrity of the RPV closure head penetrations, including the Control Rod Drive mechanisms (CRD's), Upper Head Injection (UHI) and the Vent line. A total of 83 penetrations were examined, including (78) CRD's, (4) UHI's and (1) Vent line. The examinations were performed to address NRC Order EA-03-009, "Interim Inspection Requirements for Reactor Pressure Vessel Heads At Pressurized Water Reactors". The examination scenario was aimed at determining whether boric acid deposits were emanating from the annulus of the penetrations and identifying the presence of boric acid deposits on the RPV head.
The work was performed as part of the WEN/ISI program, augmented exam section, of 1-TRI-0-1 0, revision 13. In addition, the examinations fulfill NRC Order EA-03-009, Section 3 (a), Bare Metal Visual Examination of 100% of the RPV head penetration nozzles and surrounding head surface.
1
Watts Bar Unit 1, Cycle 7 - RPV Closure Head REPORT Remote Visual (VT-2) Penetration Examination Final Report TECHNICAL DISCUSSION Remote VT Equipment TVA contracted with Vistas Corporation to provide remote VT equipment to examine the RPV head penetrations. The remote examinations were performed with Vista's magnetic crawlers, outfitted with twin high resolution color cameras, each having adjustable LED lighting arrays. The cameras were located on the front and rear of the remote crawlers.
Access to the examination area was obtained by lifting the insulation shroud approximately 5 inches from the vessel head and installing temporary wooden wedges for stabilization.
The remote crawler was installed on the head surface and guided between the rows of penetrations.
The examinations were recorded on Digital 8 video cassette's for archival and off-line review. All penetration annulus areas and the head surface in the area on the penetrations were examined and digitally recorded.
Procedure/Documentation ISO provided Level IIl's certified in Visual examination to review and evaluate all data on-line. All acquired data also had an independent review by certified Level III VT examination personnel. Examination protocol was designed to incorporate the recommendations of the Electric Power Research Institute's (EPRI) Technical Report, entitled "Visual Examination for Leakage of PWR Reactor Head Penetrations on Top of RPV Head", Revision 2 of 1006296, including 2002 Inspection Results. The examination was conducted in accordance with TVA's Nondestructive Examination (NDE) Procedure N-VT-1 7, Revision 4, "Visual Examination for Leakage of PWR Head Penetrations".
The visual examination process utilized enhanced VT-2 methodology with camera resolution established on characters less than or equal to.105" high, representative of VT-3 sensitivity.
2
Watts Bar Unit 1, Cycle 7 - RPV Closure Head REPORT Remote Visual (VT-2) Penetration Examination Final Report Examination Process An examination Scan Plan was developed in order to ensure that examinations were performed in a logical sequence, while minimizing radiation exposure and validating positional accuracy. A raster pattern was chosen as the most effective method for performing the examinations and consisted of 22 separate scans.
A total of 323 sequences were performed to examine all penetrations. With the exception of the outer scan rows, each penetration was examined during two scans which consisted of examining four, 90-degree + segments of each penetration to ensure 100% coverage of the annulus area. The outer scan rows, that included the peripheral penetrations, were examined using two scans that covered 180-degrees + of the penetration that resulted in 100% coverage. During the examination of each penetration, the head area adjacent to the penetrations was also visually examined for boron deposits.
Radiation work permit number 8071 was used for the inspection work. The data acquisition equipment staging area was located on top of Reactor Coolant Pump Plug No.2.
RESULTS No penetrations indicated boron leakage in the area of the annulus associated with inside surface CRDM weld cracking. In addition, no boron was noted on the head surface with the origination point being from the penetration(s). All penetrations were satisfactorily examined. All penetrations were accessible with the Vista's magnetic crawlers.
3
Watts Bar RPV Closure Head, Remote Visual Unit 1, Cycle 07 (VT-2) Penetration Examination Results
=E 0
L0 6
6 0
0 00 w
0 RA CrE z
.2 z
Tape 043 X RAS C
-S
-w CC 0
62 L-9 o
064
'X 0RAS 2
Count E-9 10
=
2 OA I
0 7M r-9 0
082 X
RAS 0
38 L-9 M
004 X
(_
a.__
I_ (min:sec)gg 00 a
a r-Lm m
cc z
I UComments 1
74 L-180 1
00:00 X
RAS 1
67 L-180 1
03:30
. X RAS Wedge obstruction.
1 66 L-180 1
04:39 X RAS 2
62 L-90 1
06:47 X
07:22 X
RAS 2
74 R-90 1
08:26 X RAS 2
43 L-90 1
09:42 X
RAS Out of sequence 2
67 R-90 1
09:08 X
RAS Out of sequence 2
38 L-90 1
10:40 X
RAS I
_eenote_1 2
42 L-90 1
11:19 X
RAS Seenote_1 2
66 R-90 1
11:54 X RAS Called 54. Corrected to 42.
2 54 L-90 1
12:50 X
RAS 2
UPIAH-D L-90 1
13:25 X
RAS 3
UPIAH-A L-90 1
14:10 X
_eenote_1 3
51 L-90 1
14:32 X RAS No audio of penetration I.D. Location only stated 31 62 R-90 1
15:20
__X RAS 3
31 L-31 1
16:02
_____X RAS 3
55 R-90 1
00:00 X
RAS See note 1. Tape count re-zero.
3 23 L-90 1
00:37 X
RAS See note 1 3
43 R-90 1
01:03 X
RAS See note 1 3
18 L-90 1
01:32 X
RAS See note 1 31 38 R-90 1
01:58 X
RAS See note 1. Loose coating 3
22 L-90 1
02:55 X
RAS See note 1 3
42 R-90 1
02:22 X
RAS See note 1 3
30 L-90 1
03:18
__X RAS See note 1 3
54 R-90 1
04:00
_______X RAS See note 1 3
50 L-90 1
04:37
_______X RAS See note 1 131 UPIAH-D R-90 T
05:15
__X RAS 131 65 L-9 oT 05:43
_X RAS WBN U1C7 RPV Closure Head VT Page 1 of 12 Rev. 0 "
Watts Bar Unit 1, Cycle 07 RPV Closure Head, Remote Visual (VT-2) Penetration Examination Results 0
0M o
o 0
0 m0se) 0 M EC a
0Tape cc o
-0 O
cc~
Count LO-OE>
-0' 2 L 0
CI 0
a)0 a) a) (1 Clg 0
0 a) -
EE w'z cj, a.
min:sec) 6 c. o m~.0 0
o a
zCmet 4
75 L-90 1
06:20 X
X RAS Streaks seen on CRDM, reported in RF01.
4 56 L-90 1
08:33 X
RAS 4
UPIAH-A R-90 1
09:04 X
RAS 4
32 L-90 1
09:31 X
RAS 4
51 R-90 1
09:53 X
RAS 4
15 L-90 1
10:23 X
RAS 4
31 R-90 1
10:49 X
RAS 4
23 R-90 1
11:22 X
RAS 4
6 L-90 1
11:55 X
RAS 4
18 R-90 1
12:21 X
X RAS 4
10 L-90 1
13:02 X
RAS 4
22 R-90 1
13:33 X
RAS 4
14 L-90 1
14:06 X
RAS 4
30 R-90 1
14:41 X
RAS 4
37 L-90 1
15:08 X
RAS 4
50 R-90 1
15:51 X
RAS 4
61 L-90 1
16:13 X
RAS 4
65 R-90 1
16:47 X
RAS 4
78 L-90 1
17:29 X
RAS 5
68 L-90 1
18:31 X
RAS Wedge in view-No obstruction 5
75 R-90 1
19:42 X
RAS Wedge in view-No obstruction 5
44 L-90 1
20:27 X
RAS 5
56 R-90 1
20:54 X
RAS 5
24 L-90 1
21:25 X
RAS 5
32 R-90 1
22:02 X
RAS Loose coating 5
11 L-90 1
22:41 X
RAS 5
15 R-90 1
23:13 X
RAS Heavy coating at crevice. No Obstruction 5
3 L-90 1
24:40 X
RAS See note 2.
5 6
R-90 1
25:08 X
RAS WBN U1C7 RPV Closure Head VT Page 2 of 12 Rev. 0
Watts Bar Unit 1, Cycle 07 RPV Closure Head, Remote Visual (VT-2) Penetration Examination Results c E Count 0
0 2:XR 6
000 0
90 1
756X A
cn~~~
(mneCUo 0
.2E
- 0) c 0 tM r-
~
~
Cmet 5
29 L-90 1
28:19 X RAS 5
37 R-90 1
29:26 X RAS Heavy coating at crevice. No Obstruction 5
49 L-90 1
30:17
___X RAS 5
61 R-90 1
30:56 X RAS 5
73 L-90 1
31:14 X RAS 5
78 R-90 1
31:41 X RAS End of tape 1.
6 68 iR-90 2
00:00 X RAS Start tape 2.
6 39 L-90 2
00:32 X RAS 6
44 R-90 2
01:02 X
RAS 6
19 L-90 2
01:30 0 (n X RAS 6
24 R-90 2
01:56 mX RAS 6
7 L-90 2
02:22 X RAS 6
11 R-90 2
02:48 X RAS 6
3 R-90 2
03:14 X RAS 6
Vent-i 360-Deg.
2 03:52 X RAS Obtained 1800. See Tape 4, TO 14:43 for remaining.
6 1
L-90 5
15:22 X
RAS See note 3.
6 2
R-90 5
16:00 X
RAS 6
21 L-90 5
16:32 X
RAS 6
29 R-90 5
17:12 X RAS 6
41 L-90 5
17:41 X
RAS 6
49 R-90 5
17:12 X
RAS 6
73 R-90 5
18:00 X RAS 7
69 L-90 2
06:20 X RAS 7
45 L-90 2
06:57 X RAS 7
39 R-90 2
07:17 X
RAS WBN U1C7 RPV Closure Head VT Page 3 of 12 Rev. 0
Watts Bar Unit 1, Cycle 07 Head, Remote Visual (VT-2) Penetration Examination Results RPV Closure z
.o z*
Tape c*
'* E
.Ec cc-4 0
IM ca I
a 2
a,-
r
- -u Count
.o 2- >
O 0
) -Q" g
6 0
0 mne 0
0 O0m t'w c=j, n
Comments
_M ___a_
-. &-nscQ.
7 25 L-90 2
07:50 X RAS Heavy coating at crevice. No Obstruction 7
19 R-90 2
09:25
__X RAS 7
7 R-90 2
09:45 0X RAS 7
4 L-90 2
10:14 X
RAS See note 3.
7 1
R-90 2
10:53
___X RAS See note 3.
7 5
L-90 2
11:34 X
RAS See Note 3.
7 13 L-90 2
12:32 X RAS 7
9 R-90 2
13:09 X
RAS 7
28 L-90 2
13:30 X
RAS 7
21 R-90 2
14:01 X
RAS 7
48 L-90 2
14:21 X
RAS See NRAS 7
41 L-90 2
14:53 X RAS 7
72 L-90 2
15:32 X
X X RAS Small debris in crevice. See note 4.
8 76 L-90 2
17:20 X
RAS 8
69 R-90 2
17:59 X
RAS 8
57 L-90 2
18:52 X
RAS 8
45 R-90 2
19:35 X RAS 8
33 L-90 2
20:20 X
X X
RAS 8
25 R-90 2
20:49 X RAS 8
16 R-90 2
21:24 X
RAS 8
12 L-90 2
21:52 X
RAS 8
4 R-90 2
21:18 X RAS 8
8 L-90 2
23:02 X RAS See note 3.
8 5
R-90 2
23:54 X RAS See note 3.
8 17 L-90 2
24:28 X
RAS 8
13 R-90 2
25:11 X
RAS 8
36 L-90 2
25:37 X RAS 8
28 R-90 2
26:25 X
RAS 8
60 L-90 2
26:45 X
RAS WBN U1C7 RPV Closure Head VT Page 4 of 12 Rev. 0
Watts Bar Unit 1, Cycle 07 Head, Remote Visual (VT-2) Penetration Examination Results RPV Closure oE 0
.2 r I*-
M.
cc~-
0 cc 2
w 0
CCU S *i-:
.2 z
Tape T "
a*
Count
.8 0 E >0" r
eo M-r-
0 &-
0 'a c-c I
(min:sec) a COL) a2v rn =Z' cc. "
o z
I Comments 8
48 R-90 2
27:29 X
RAS 8
72 R-90 2
28:03 X
RAS See scan 7, tape 2, TC 15:32. End tape 2.
9 76 R-90 3
00:30 X
FCL Called 63. Corrected to 76. Start tape 3.
9 63 L-90 3
01:10 X
FCL Called 57. Corrected to 63.
9 57 R-90 3
01:40 X
FCL 9
52 L-90 3
02:43 X
FCL 9
33 R-90 3
04:04 X
FCL 9
34 L-90 3
05:18 X
FCL 9
16 R-90 3
06:58 X
FCL 9
26 L-90 3
07:14 X
FCL 9
12 R-90 3
08:23 X
FCL 9
20 L-90 3
08:49 X
FCL 9
8 R-90 3
10:06 X
FCL 9
27 L-90 3
10:49 X
FCL 9
35 L-90 3
11:11 X
FCL 9
17 R-90 3
11:50 X
FCL.
9 53 L-90 3
12:25 X
FCL 9
36 R-90 3
13:06 X
FCL 9
UPIAH-C L-90 3
12:27 X FCL 9
60 R-90 3
14:16 X FCL 10 63 R-90 3
16:17 X
FCL Duct tape residue. Seen on tape 3, TC 01:10 10 UPIAH-B L-90 3
15:05 X
FCL 10 52 R-90 3
16:55 X
FCL 10 58 L-90 3
19:00 X
FCL 10 34 R-90 3
19:29 X
FCL 10 46 L-90 3
20:55 X
FCL_
10 26 R-90 3
21:33 X
FCL 10 40 L-90 3
21:55 X
FCL 10 20 R-90 3
22:14
-X FCL WBN U1C7 RPV Closure Head VT Page 5 of 12 Rev. 0
Watts Bar Unit 1, Cycle 07 RPV Closure Head, Remote Visual (VT-2) Penetration Examination Results c~~
c c
02:
o.2 c
r-
._L oo6 o
o
_)
- o.
-J i*
(min:sec)~g o
o: m'*
o:=
.0*
z
- Z.1_E Comments 10 47 L-90 3
22:35
__________X FCL 10 27 R-90 3
23:10 X FwL 10 59 L-90 3
23:30 X FOL 10 35 R-90 3
24:17 2X FL 10 64 L-90 3
24:45 X
FCL 10 53 R-90 3
25:14 X FCL 10 UPIAH-C R-90 3
25:47 X
FCL 10 UPIAH-B R-90 3
26:45 X
FCL 11 58 R-90 3
29:20 X
FCL Changed camera. Res check at T.C. 28:39 11 70 L-90 3
29:40 X
FCL 11 46 R-90 3
20:09 X
FCL 11 40 R-90 3
30:29 X
FCL 11 71 L-90 3
31:30 X
FCL 11 47 R-90 T
31:48 X
FCL 11 77 L-90 3
32:09 X
FCL 11 59 R-90 3
33:07 X
FCL 11 64 R-90 3
33:28 X
FCL 12 70 R-180 3
34:00 X
FCL i2 71 R-180 3
34:57 X
FCL 12 77 R-180 3
35:50 X FCL 13 UPIAH-D R-90 3
36:37 X
FCL 13 54 R1-90 3
37:06 X
FCL 13 66 L-90 3
37:30 X FCL 13 42 R-90 3
38:00 X
FCL 13 38 R-90 3
38:16 X
FCL 13 67 L-90 3
38:34 X
F-CL.
13 43 R-90 3
38:48 X
FCL 13 74 L-90 3
39:00 X
FCL 13 55 R-90 3
39:29 I-X FCL WBN U1C7 RPV Closure Head VT Page 6 of 12 Rev. 0
Watts Bar Unit 1, Cycle 07 Head, Remote Visual (VT-2) Penetration Examination Results RPV Closure a)
(
i~ ec 4-Cu C
X C
0
= :
C
.2 r-R-9 r %9-E wFCL cc 05 0
6 40:)
0 o, S
Q rC 10 Tape 40 C0L 4 54 L-9 3
41)2 C
FCLZ w1 30 R-9 0
3 cc: 'a FCO
_n I
(
-J I~ (min: sec)o.
oc r-C
-~C M
M E_
E z
W~
Comments 131 62 R-90 3 1239:43 X FCL 14 65 R-90 3
40:08 X
FCL 14 UPIAH-D L-90 3
40:55 X
FCL 14 50 R-90 3
41:08 X
FCL 14 54 L-90 3
41:22 X
FCL 14 30 R-90 3
41:48 X
FCL 14 42 L-90 3
42:04 X
FCL 14 22 R-90 3
42:16 X
FCL 14 38 L-90 3
42:43 X
FCL 14 18 R-90 3
42:56 X
FCL 14, 43 L-90 3
43:22 X
FCL 14 23 R-90 3
43:51 X
FCL 14 55 L-90 3
44:33 X
FCL 14 31 R-90 3
45:10 "
X FCL 14 62 L-90 3
45:50 X FCL 14 51 R-90 3
46:09 X
FCL 14 UP3AH-A R-90 3
46:27 X
FCL 15 78 R-90 3
46:59 X
FCL 15 65 L-90 3
47:32 X
FCL 15 61 R-90 3
47:50 X
FCL 15, 50 L-90 3
48:35 X
FCL 15 37 R-90 3
49:08 X
49:26 X
FOL 15 14 R-90 3
49:54 X
50:22 X
FOL 15, 10 R-90 3
50:35
_X FCL 15 18 L-90 3
50:51 X
FCL 15 6
R-90 3
51:30 X
FCL 15 23 L-90 3
52:30
__X FCL WBN U1C7 RPV Closure Head VT Page 7 of 12 Rev. 0'
Watts Bar RPV Closure Head, Remote Visual Unit 1, Cycle 07 (VT-2) Penetration Examination Results
- a. a:
-0.
15 31 L-9 3e2:2XnC 15 5
-0 3
5440 C
15 32 R-9 a S4 T CFCL Tap O()
a
&.~o 15~c UPI)-
L-0 3
5:1 C
15Count 75 09 E 5>
0 F
Edf CC 0
a)
EI 16 78 L0 4
01:07 X
C o mm et (nl (L
~
min:sec)o0
'D 0E.
M2w=._
16 3 -90 4
2:0 (X
FCL 15 31 L-90 3
52:52 X FCL Comments 15 15 R-90 3
53:09 X FCL 15 51 L-90 3
54:40 X
FCL 15 32 R-90 3
54:55 X
FCL 15 UPIAH-A L-90 3
55:12 X
FCL 15 56 R-90 3
55:52 X FCL 15 75 R-90 3
56:02 X FCL 16 78 L-90 4
01:07 X FCL Enaoftape4.
16 73 R-90 4
02:10 X
FCL 16 61 L-90 4
02:30 X
FCL 16 49 R-90 4
03:06 X FCL 16 37 L-90 4
03:28 X FCL 16 29 R-90 4
04:11 X FCL 16 14 L-90 4
04:42 X FCL 16 10 L-90 4
04:52 X
FCL 16 2
R-90 4
05:18 X FCL 16 6
L-90 4
05:51 X
FCL 16 3
R-90 4
06:22 X FCL 16 15 L-90 4
06:51 X
FCL 116 11 R-90 4
07:37 X
FCL 16 32 L-90 4
08:00 X
FOL 16 24 R-90 4
08:43 X
09:03 X
FOL 16 44 R-90 4
09:47 X
- 16.
75 L-90 4
10:06 X FCL 16 68 R-90 4
10:41 X
FOL 1 7 7 3 L -9 0 4
1 1 : 2 0 X
F O L 17 49 L-90 4
11:54 X
FOL 17 41 R-90 4
12:09 X
FOL WBN U1C7 RPV Closure Head VT Page 8 of 12 Rev. 0
Watts Bar Unit 1, Cycle 07 RPV Closure Head, Remote Visual (VT-2) Penetration Examination Results SCount"*
- 0"-
C.2 C
E wn"'
C 00C 0
00 M
~
o0 Cu C Count 0O
.E 0
(n
- a. Ccu 0 ~~~ 00 0
0 CuC0-~
(DC
_° I-m (m in:sec) o,..
o m°
.C m r
o z
w.'
Com m ents 17 29 L-90 4
12:33 X
FCL 17 21 R-90 4
12:59 X
FCL 17 9
R-90 4
13:30 X
FCL 17 2
L-90 4
13:57 X
FCL 17 1
R-90 4
14:09 X
FCL 17 3
L-90 4
27:00 X
FCL 17 11 L-90 4
24:17 X
FCL 17 7
R-90 4
24:35 X
FCL 17 24 L-90 4
25:01 X
FCL 17 19 R-90 4
25:29 X
FCL 17 44 L-90 4
25:47 X
FCL 17 39 R-90 4
26:06 X
FCL 17 68 L-90 4
26:24 X
FCL 18 72 R-90 4
15:58 X
FCL 18 41 L-90 4
16:46 X
FCL 18 48 R-90 4
17:42 X
FCL 18 21 L-90 4
17:59 X
FCL 18 28 R-90 4
18:36 X
FCL 18 9
L-90 4
18:56 X
FCL 18 13 R-90 4
19:16 X
FCL 18 5
R-90 4
19:34 X
FCL 18 1
L-90 4
20:04 X
FCL 18 4
R-90 4
20:37 X
FCL 18 7
L-90 4
21:03 X
FCL 18 19 L-90 4
21:51 X
FCL 18 25 R-90 4
22:23 X
FCL 18 39 L-90 4
22:51 X
FCL 18 45 R-90 4
23:15 X
FCL 18 69 R-90 4
23:46 X
FCL WBN U1C7 RPV Closure Head VT Page 9 of 12 Rev. 0 "
Watts Bar Unit 1, Cycle 07 RPV Closure Head, Remote Visual (VT-2) Penetration Examination Results z
Tape 4*
E..
0"
- 0*
Count 0
o O>
- ,*")
6 n
D.
- m o
o 0
,,E Comments 119 72 L-90 4
28:25
___X FCL 19 48 L-90 4
28:56 X FCL 19 60 R-90 4
29:26 X
FCL___________________
19 28 L-90 4
29:38
-X FCL
_"_ro.co-
)E 19 36 Rl-90 4
30:48 X
FCL 19 13 L-90 4
31:09 XFCL (19 17 R-90 4
32.04 X FCL
,19 5
L-90 4
32:14 X FCL MEccCo 19 8
R-90 4
32:29 X
FCL 19 4
L-90 4
32:46 X
FCL 19 12 R-90 4
33:08 X
FCL 19 16 R-90 4
33:36 X
FCL 19 25 L-90 4
34:06 X
FCL 19 33 L-90 4
34:37 X
FCL 19 45 L-90 4
35:16 X
FCL 19 57 R-90 4
35:41 X
FCL 19 69 L-90 4
36:11 X FCL 19 76 R-90 4
36:38 X
FCL 20 UPIAH-C R-90 4
37:15 X
FCL 20 60 L-90 4
38:02 X
FCL 20 36 L-90 4
38:48 X
FCL 201 53 R-90 4
39:04 X
FCL 20 17 L-90 4
39:40 X
FCL 20 35 R-90 4
40:13 X
FCL 20 27 R-90 4
40:43 X
FCL 20 8
L-90 4
41:01 X
FCL 20 20 L-90 4
41:41 X
FCL 20 12 L-90 4
41:58 X
FCL 20 26 R-90 4
42:19 X
FCL WBN U1C7 RPV Closure Head VT Page 10 of 12 Rev. 0
Watts Bar RPV Closure Head, Remote Visual Unit 1, Cycie 07 (VT-2) Penetration Examination Results 0
L M
20 EL-4XF a) 33 L-9a
.5c 0
Tap 433 Xa F)a CL 0 )
E
'F c uw C o u n t 0
'en a ' c u C U~(
U 25 0
0 a3 0
4 XFCL (n.I a (min:sec)
- a.
M
.Eu cc2(
0~..
~
z I
_Cmet 20 16 L-90 4
42:47 X
FCL 20 34 R-90 4
43:03 X
FCL 20 33 L-90 4
43:39 X
FOL 20 52 R-90 T
43:49 X
FCL
- 20.
63 R-90 4
44:53 X
FCL 20 76 L-90 4
45:30 X FCL End of tape4 21 UPIAH-C L-90 5
00:30 X RAS Start tape 5 21 53 L-90 5
00:57 X
RAS 21 64 R-90 5
02:16 X
02:56 X
RAS 21 59 R-90 5
03:29 X
03:51 X
RAS 21 47 R-90 5
04:23 X
04:47 X
RAS 21 40 R-90 5
05:05 X
05:26 X
RAS 21 46 R-90 5
06:05 X
06:40 X
RAS 21 58 R-90 5
07:38 X
07:50 X
RAS 21 UPIAH-B R-90 5
08:36 X
09:10 X
10:20 X
10:45 X
RAS 22 77 R-90 5
11:05 X
11:27 X
RAS 22 71 R-90 5
11:47 X
12:09 X RAS WBN U1C7 RPV Closure Head VT Page 11 of 12 Rev. 0
Watts Bar Unit 1, Cycle 07 Head, Remote Visual (VT-2) Penetration Examination Results RPV Closure 0
0
.0 9
0 2-0 5
z
.2 z
Tape Count 0
>0 "0 2E Or-5-M W
CU r-0
- o.
-0 L--0E M*
U a)0c c
00W W
0* 0 0
O
.0 0
n cc 0 a F
_n I_(___
.1_1._
1 (min: sec)o.
a o-.
a E__
m.~
Comments 22 46 L-90 5
12:23 X
RAS 22 70 R-90 5
12:45
13:00 X
13:16 X
RAS Frank Leonard, [examiner i
date Ricky Seals, examiner date Level Ill, Visual I Level IIl, Visual 1
I I
Inspection Services Organization Inspection Services Organization Matt Welch, 2nd party review date Tim Brinkman, 2nd party review date
.Level III, Visual I I
Level IlI, Visual Inspection Services Organization Notes:
II 1)Tape 1-Data on tape count 16:48 through 24:59 not used. Tape count at 24:59 changes to 00:00.
_2)Tape 1-Small amount of crystals seen on head surface. Not originating from CRDM crevice. Cleaned and re-examined. See tape 5, TC 14:52.
1 1
1 1
- 3) Insulation Support ring (top hat) in contact with head. No obstruction
- 4) Could not remove with air. Image compared to RFO5. No change.
WBN U1C7 RPV Closure Head VT Page 12 of 12 Rev. 0
Watts Bar Unit 1, Cycle 07 RPV Closure Head, Remote Visual (VT-2) Penetration Examination Results o
C C
6 6
0 0
0
.E m
0Count
.: "E 5
0-Tap o
._ Z (min:sec)oo..
.E c
0 z
Comments 7
1 R-90 2
10:53
-5 "0X RAS See note 3.
17 1
R-90 4
14:09 X FCL 6
1 L-90 5
15:22 X
RAS See note 3.
18 1
L-90 4
20:04 X
FCL 6
2 R-90 5
16:00 X
RAS 16 2
R-90 4
05:18 X
FCL 5
2 L-90 1
25:48 X
RAS See note 3.
17 2
L-90 4
13:57 X
FCL 6
3 R-90 2
03:14 X
RAS 16 3
R-90 4
06:22 X
FCL 5
3 L-90 1
24:40 X
RAS See note 2.
17 3
L-90 4
27:00 X
FCL 8
4 R-90 2
21:18 X
RAS 18 4
R-90 4
20:37 X
FCL 7
4 L-90 2
10:14 X
RAS See note 3.
19 4
L-90 4
32:46 X
FCL 8
5 R-90 2
23:54 X
RAS See note 3.
18 5
R-90 4
19:34 X
FCL 7
5 L-90 2
11:34 X
RAS See Note 3.
19 5
L-90 4
32:14 X
FCL 5
6 R-90 1
25:08 X
RAS 15 6
R-90 3
51:30 X
FCL 4
6 L-90 1
11:55 X
RAS 16 6
L-90 4
05:51 X
FCL 7
7 R-90 2
09:45 X
RAS 17 7
R-90 4
24:35 X
FCL 6
7 L-90 2
02:22 X
RAS 18 7
L-90 4
21:03 X
FCL 9
8 R-90 3
10:06 X
FCL WBN U1C7 RPV Closure Head VT Page 1 of 12 Rev. 0
Watts Bar Unit 1, Cycle 07 RPV Closure Head, Remote Visual (VT-2) Penetration Examination Results M
c E
g a
.2 a
r-o-o
~
E w~
7 9-902 z
Tape13:09X A
M Count 0 E >0 X" FC 0
C0 0
cc1 U) 0 2
0 X
Acc 15~~
10 R-0 3
5:5xFC 1
L0 1
13(min:sec)X 0
R 19 8
R-90 4
32:29 X
FCL 8
8 L-90 2
23:02 X
RAS See note 3.
20 8
L-90 4
41:01 X
FCL 7
9 R-90 2
13:09 X
- 17.
9 R-90 4
13:30 X
FCL 6
9 L-90 5
16:12 X
RAS 18 9
L-90 4
18:56 X
FCL 5
10 R-90 1
27:10 X
RAS 15 10 R-90 3
50:35 X
FCL 4
10 L-90 1
13:02 X
04:52 X
FCL 6
11 R-90 2
02:48 X
RAS 16 11 R-90 4
07:37 X
FCL 5
11 L-90 1
22:41 X
24:17 X
FCL 9
12 R-90 3
08:23 X FCL 19 12 R-90 4
33:08 X
FRL 8
12 L-90 2
21:52 A___
Q_____
A 20 12 L-90 4
41:58 X
FCL 8
13 R-90 2
25:11 X
RAS Heavycoatigatrevie._NoObstrctio 18 13 R-90 4
19:16 X
FCL 7
13 L-90 2
12:32 X
31:09 X
FOL 5
14 R-90 1
27:56 X
RAS 15, 14 R-90 3
49:54
___X FOL 4
14 L-90 1
14:06 X
04:42
__X FOL 5
15 R-90 1
23:13
___________X RAS Heavy coating at crevice. No Obstruction 15 15 R-90 3
53:09
__X FCL WBN U1C7 RPV Closure Head VT Page 2 of 12 Rev. 0
Watts Bar RPV Closure Head, Remote Visual Unit 1, Cycle 07 (VT-2) Penetration Examination Results ra) a)
0o 0
.0 z
.2 z
Tape 0
0,
'aEc C
M' Count 0
E >
0 "E
-C cc Coun 0.m
.0 0
~o w
c r
- 0.
w) 0 00U (n
a.__
-J I (min: sec)& (L 0 S
M~2 im
- 2. z cZ 0
LzE Comments 4
15 L-90 1
10:23 X
06:51 X FCL 9
16 R-90 3
06:58 X FCL 19 16 R-90 4
33:36 X FCL 8
16 L-90 2
42:47 X FCL 9
17 R-90 3
11:50 X
FCL 19 17 R-90 4
32:04 X FRL 8
17 L-90 2
24:28 X
39:40 X
X FCL 4
18 R-90 T
12:21 X
X RAS 14 18 R-90 3
42:56 X
FRL Seenote_1 3
18 L-90 1
01:32 X
50:51 X
FCL 7
19 R-90 2
09:25 X RAS 17 19 R-90 4
25:29 X FCL 6
19 L-90 2
01:30 X
21:51 X
FCL 10 20 R-90 3
22:14 X
FCL 20, 20 R-90 4
41:41 X
FCL 9
20 L-90 3
08:49 X
FCL 21 20 L-90 5
04:47 X
RAS 7
21 R-90 2
14:01 X
RAS 17 21 R-90 4
12:59 X
FCL 6
21 L-90 5
16:32 X
17:59 X
- FCL, 4
22 R-90 1
13:33 X
RAS 14 22 R-90 3
42:16 X
FCL 3
22 L-90 1
02:55 1 X RAS See note 1 WBN U1C7 RPV Closure Head VT Page 3 of 12 Rev. 0
Watts Bar Unit 1, Cycle 07 Head, Remote Visual (VT-2) Penetration Examination Results RPV Closure cc
,C 4
0 R1
- A 14 i3R9m34:1 C
15 a
L-9 0
3r52:30 E
i L.
z Tape Ln "'
(n 0 4
.~C N*)
w r
6~~~
~
24R9 15 A
C6 2R-0 w
084 w
wFECL CL Count aO M.
0 3
E~ >0
)
0"
= 54
'a9 1
21:2 X
RAS 0
- 0)
CU a) 0~)
M 5
Cn I
.-i i
(mi
-1~o.
0o 0 E
1-s:
T E
40 z
I.E Comments 15 22 L-90 3
250:220 X
FCL 4
23 R-90 T
11:22 X
RAS 14 23 R-90 3
43:51 X
FCL 3
23 L-90 1
00:37 X
52:30 X
FCL 6
24 R-90 2
01:56 X
RAS 16 24 R-90 4
08.43 X
FCL 5
24 L-90 1
21:25 X
25:01 X
FOL 8
25 R-90 2
20:49 X
RAS 18 25 R-90 4
22:23 X FCL 7
25 L-90 2
07:50 X
RAS Heavy coating at crevice. No Obstruction 19 25 L-90 4
34:06 X FRL 10 26 R-90 3
21:33 X
FAL 20 26 R-90 T
42:19 X
FCL 9
26 L-90 3
07:14 X
FCL 21 26 L-90 5
05:26 X
RAS 10 27 R-90 3
23:10 X
FCL 20 27 R-90 4
40:43 X
FCL 9
27 L-90 3
10:49
__X FCL 21, 27 L-90 5
03:51 X
RAS 8
28 R-90 2
26:25 X
RAS 18 28 R-90 4
18:36 X FCL 7
28 L-90 2
13:30
29:38 X
FCL
- 6.
29 R-90 5
17:12
______X RAS 16 29 R-90 4
04:11 X
FOL 5
29 L-90 T
28:19
_X RAS 17 29 IL-90 4
12:33
_X FCL WBN U1C7 RPV Closure Head VT Page 4 of 12 Rev. 0
Watts Bar Unit 1, Cycle 07 RPV Closure Head, Remote Visual (VT-2) Penetration Examination Results cc Q
r-cc D
M-E 0
- = L X
zz Tape CD (A~
)
u Count
.0 Ch o
=
CU r-0..0) r-e)~
C' M.%
0 o
w 0c0
- 0)
CO4.
0 0
M w
cc
- o.
I I_
r3 (min:sec) Do a.
cc m*
c c 5. 40 1 z 0
Comments 4
30 R-90 1
14:41 X
RAS 14 30 R-90 3
41:48 X
FCL 3
30 L-90 1
03:18 X
49:26 X
FCL 4
31 R-90 1
10:49 X
RAS 14 31 R-90 3
45:10 X
FCL 15 31 L-90 3
52:52 X
FCL 3
31 L-31 1
16:02 X
RAS 5
32 R-90 1
22:02 X
RAS Loose coating 15 32 R-90 3
54:55 X
FCL 4
32 L-90 1
09:31 X
08:00 X
FCL 9
33 R-90 3
04:04 X
FCL 19 33 R-90 4
34:37 X
FCL 8
33 L-90 2
20:20 X
43:39 X
FCL 10 34 R-90 3
19:29 X FCL 20 34 R-90 4
43:03 X
FCL 9
34 L-90 3
05:18 X
FCL 21 34 L-90 5
06:40 X
RAS 10 35 R-90 3
24:17 X
FCL 20 35 R-90 4
40:13 X FCL 9
35 L-90 3
11:11 X
FCL 21 35 L-90 5
02:56 X RAS 9
36 R-90 3
13:06 X
FCL 19 36 R-90 4
30:48 X FCL 8
36 L-90 2
25:37 X
38:48 X
FCL 5
37 R-90 1
29:26 X
RAS Heavy coating at crevice. No Obstruction WBN U1C7 RPV Closure Head VT Page 5 of 12 Rev. 0
Watts Bar RPV Closure Head, Remote Visual Unit 1, Cycle 07 (VT-2) Penetration Examination Results Or)~C
- 4) 0JI-.*
5 070
.2 o 0X
-0 1
16
.2 O
TN 0
E 0E cc (
Count Z
0 2E >
0 LEi-
ý 3
38 R-90 0
0:X0Seoe.oea 0___
0 0-mnsco.
3:
4, Comments I__
(min: sec)
(4)
M c
0 z
w.
15 37 R-90 3
49:08 X
FCL 4
37 L-90 1
15:08 X
03:28 X
FCL 3
38 R-90 1
01:58 X
RAS See note 1. Loose coating 13 38 R-90 3
38:16 X
FCL 2
38 L-90 1
10:40 X
422:43 X
FCL 7
39 R-90 2
07:17 X
RAS 17 39 R-90 4
26:06 X
FCL____________________
6 39 L-90 2
00:32 X RAS___________________
18, 39 L-90 T
22:51 X
FOL 11 40 R-90 3
30:29 X
FCL 21 40 R-90 5
05:05 X
21:55 X
FCL 22 40 L-90 5
12:09 X
RAS 7
41 R-90 2
14:53 X
RAS 17 41 R-90 4
12:09 X
FCL 6
41 L-90 5
17:41 X
16:46 X
FCL 3
42 R-90 1
02:22 X
RAS See note 1 13 42 R-90 3
38:00 X
FCL 2
42 L-90 1
11:19 X
42:04 X
FCL 3
43 R-90 1
01:03 X
RAS See note 1 13 43 R-90 3
38:48 X
FCL 2
43 L-90 1
09:42 X
RAS Out of sequence 14 43 L-90 3
43:22 X
FCL 6
44 R-90 2
01:02 X
RAS 16 44 R-90 4
09:47 X
FCL WBN U1C7 RPV Closure Head VT Page 6 of 12 Rev. 0
Watts Bar Head, Remote Visual Unit 1, Cycle 07 (VT-2) Penetration Examination Results RPV Closure cc C
a)1
)
c E
4Ca 4-~r ccoOa z
.0 z
Tape d
_
- o*
.Z *.
Count 4C) 0 E O >
o
-o cc a
a-0-
0 U)
()
a..
I (min:sec)oo..
0 m u a a a
Comments 5
44 L-90 1
20:27 X
25:47 X
FCL 8
45 R-90 2
19:35 X
RAS 18 45 R-90 4
23:15 X
FCL 7
45 L-90 2
06:57 X
35:16 X
FCL 11 46 R-90 3
20:09 X
FCL 21 46 R-90 5
06:05 X
20:55 X
FCL 22 46 L-90 5
12:23 X
RAS 11 47 Rl-90 3
31:48 X
FCL 21 47 R-90 5
04:23 X
22:35 X
FCL 22 47 L-90 5
11:27 X
RAS 8
48 R-90 2
27:29 X
RAS 18 48 R-90 4
17:42 X
FCL 7
48 L-90 2
14:21 X
28:56 X
FCL 6
49 R-90 5
17:12 X
RAS 16 49 R-90 4
03:06 X
FCL 5
49 L-90 1
30:17 X
11:54 X
FCL 4
50 R-90 1
15:51 X
RAS 14 50 R-90 3
41:08 X
FCL 3
50 L-90 1
04:37 X
48:35 X
FCL 4
51 R-90 1
09:53 X
RAS 14 51 R-90 3
46:09 X
FCL 3
51 L-90 1
14:32 X
RAS No audio of penetration 1.D. Location only stated WBN U1C7 RPV Closure Head VT Page 7 of 12 Rev. 0
Watts Bar RPV Closure Head, Remote Visual Unit 1, Cycle 07 (VT-2) Penetration Examination Results 0
I 0
0-a) 0400-)
Z
.2 Z
Tape cc
= &
.o-0
.E o M t_
M Count 0~
U M OE>
M 4) 20 52_
R-0 0
0 4:e9X Co e
15 51 L-90 3
54:40 X FCL 10 52 R-90 3
16:55 X
FCL 20 52 R-90 4
43:49 X
FCL 9
52 L-90 3
02:43 X FCL 21 52 L-90 5
07:50 X
RAS 10 53 R-90 3
25:14 X
FCL Seenote_1 20 53 R-90 4
39:04 X
FCL 9
53 L-90 3
12:25 X
FCL 21 53 L-90 5
00:57 X RAS 3
54 R-90 1
04:00 X
RAS See note 1 13 54 R-90 3
37:06 X FCL 2
54 L-90 1
41:22 X FCL 3
55 R-90 1
00:00 X RAS See note 1 Tape count re-zero.
13 55 R-90 3
39:29 X FCL 2
55 L-90 1
44:33 X
FCL 5
56 R-90 T
20:54 X
RAS 15 56 R-90 3
55:35 X FCL 4
56 L-90 T
08:33 X
44:13 X
FCL 11 58 R-90 3
29:20 X FCL Changed camera. Res check at T.C. 28:39 21 58 R-90 5
07:38 X
19:00 X
FCL 22 58 L-90 5
13:00 X RAS WBN U1C7 RPV Closure Head VT Page 8 of 12 Rev. 0
Watts Bar Unit 1, Cycle 07 Head, Remote Visual (VT-2) Penetration Examination Results RPV Closure 0 =
z~~
o
~
~C Z
.2 Z
Tape 0
00 o
- 0.
E-
.)-r F
L)
Count r-a) t7t O0)
=a) a)i..
_n
- a.
-J
, (min:sec)D..
0 a
o CM z'_
cc
- 3
_4",_
-O 0
z
-_'I Comments 11 59 R-90 3
33:07 X
FCL 21 59 R-90 5
03:29 X
23:30 X
FCL 22 59 L-90 5
10:45 X
RAS 9
60 R-90 3
14:16 X
FCL 19 60 R-90 4
29:26 X
FCL 8
60 L-90 2
26:45 X
38:02 X
FCL 5
61 R-90 1
30:56 X
RAS 15 61 R-90 3
47:50 X
FCL 4
61 L-90 1
16:13 X
02:30 X
FCL 3
62 R-90 1
15:20 X
RAS 13 62 R-90 3
39:43 X
FCL 2
62 L-90 1
06:47 X
45:50 X
FCL 10 63 R-90 3
16:17 X
FCL Duct tape residue. Seen on tape 3, TC 01:10 20 63 R-90 4
44:53 X
FCL 9
63 L-90 3
01:10 X
FCL Called 57. Corrected to 63.
21 63 L-90 5
09:10 X
RAS 11 64 R-90 3
33:28 X
FCL 21 64 R-90 5
02:16 X
24:45 X
FCL 22 64 L-90 5
10:20 X
RAS 4
65 R-90 1
16:47 X
RAS 14 65 R-90 3
40:08 X
FCL' 3
65 L-90 1
05:43 X
47:32 X
FCL 2
66 R-90 1
11:54 1
1 X
RAS Called 54. Corrected to 42.
WBN U1C7 RPV Closure Head VT Page 9 of 12 Rev. 0
Watts Bar Unit 1, Cycle 07 Head, Remote Visual (VT-2) Penetration Examination Results RPV Closure cc 0
o g
o C~t cc o
c.~2 r
~
I ao~
o
.2 w oo
.to E-w*
0 Z
.o z
Tape 0
"a C°"'o" 4)c D
Count 7 5 0 E >
O0~ bL0-U)'a ou o
0 0-0 M~
0
_ I
- a.
-o I (min:sec) m
- o O
Comments 13 66 L-90 3
37:30 X
FCL 1
66 L-180 1
04:39 X
RAS 2
67 R-90 1
09:08 X
RAS Out of sequence 13 67 L-90 3
38:34 X
FCL 1
67 L-180 1
03:30 X
RAS Wedge obstruction.
6 68 R-90 2
00:00 X
RAS Start tape 2.
16 68 R-90 4
10:41 X
FCL 5
68 L-90 1
18:31 X
RAS Wedge in view-No obstruction 17 68 L-90 4
26:24 X
FCL 8
69 R-90 2
17:59 X
RAS 18 69 R-90 4
23:46 X
FCL 7
69 L-90 2
06:20 X
36:11 X
FCL 22 70 R-90 5
12:45 X
RAS 12 70 R-180 3
34:00 X
FCL 11 70 L-90 3
29:40 X
FCL 22 71 R-90 5
11:47 X
RAS 12 71 R-180 3
34:57 X
FCL 11 71 L-90 3
31:30 1
1 X
FCL 8
72 R-90 2
28:03 X
RAS See scan 7, tape 2, TC 15:32. End tape 2.
18 72 R-90 4
15:58 X
FCL 7
72 L-90 2
15:32 X
X X
RAS Small debris in crevice. See note 4.
19 72 L-90 4
28:25 X
FCL 6
73 R-90 5
18:00 X
RAS-16 73 R-90 4
02:10 X
FCL 5
73 L-90 1
31:14 X
11:20 X
FCL 2
74 R-90 1
08:26 X
39:00 X
FCL WBN U1C7 RPV Closure Head VT Page 10 of 12 Rev. 0
Watts Bar Unit 1, Cycle 07 RPV Closure Head, Remote Visual (VT-2) Penetration Examination Results CC 0
1 4 L-8 1
0:0 E
A 150
.2 R0 5
o 0XFC Enotp3 z
z Tape Ln L-4ý M
Count
'a
~
0t E >
0
'r U
75 0
D X) 00 0
S s)
C r
~
(min:sec)c a..o E.
m~2 CC U-c 0 z
LUComments 1
74 L-180 T
00:00 X
RAS 5
75 R-90 1
19:42 X
RAS Wedge in view-No obstruction 15 75 R-90 3
56:02 X FCL End of tape 3.
4 75 L-90 T
06:20 X
X RAS Streaks seen on CRDM, reported in RFO1.
16 75 L-90 4
10:.06 X
FCL,
9 76 R-90 3
00:30 X
FRL Called 63. Corrected to 76. Start tape 3.
19 76 R-90 4
36:38 X
FCL 8
76 L-90 2
17:20 X
45:30 X
FCL End of tape 4 22 77 R-90 5
11:05 X
RAS 12 77 R-180 3
35:50 X
FCL 11 77 L-90 3
32:09 X FCL Starttape_4.
5 78 R-90 1
31:41 X RAS End of tape 1.
15 78 R-90 3
46:59 X
FCL 4,
78 L-90 1
17:29 X
01:07 X FCL Start tape 4.
4 UPIAH-A R-90 1
09:04 X
RAS 14 UPIAH-A R-90 3
46:27 X
FCL 3
UPIAH-A L-90 1
14:10 X
55:12 X FCL 11 UPIAH-B R-90 3
26:45 X
FCL 21 UPIAH-B R-90 5
08:36 X
RASF 10 UPIAH-B L-90 3
15:05 X FCL 22 UPIAH-B3 L-90 5,13:16 X
RAS 10, UPIAH-C R-90 3
25:47
__X FCL 20 UPIAH-C R-90 4
37:15 X
FCL 9
UPIAH-C L-90 3
12:27 X
FCL 21 UPIAH-C L-90 5
00:30 X
RAS Start tape 5 3
UPIAH-D R-90 1
05:15 X
RAS WBN U1C7 RPV Closure Head VT Page 11 of 12 Rev. 0
Watts Bar RPV Closure Head, Remote Visual Unit 1, Cycle 07 (VT-2) Penetration Examination Results 0
.)
0 0
C W6 0 E
0 L-0 0
'a2 X"
Cu 0
Count L.
0 "Z
OE "o
)0(
C) 00 00 0
M 0O cc~
W 0-
.4-chC I~
- a.
-1 10 C0 omet i~~
(min:sec)o.
o EE m
cu M
2
__0 Z
omet 13 UPIAH-D R-90 3
36:37
_______X FOL 2
UPIAH-D L-90 1
13:25
40:55 X
FCL 6
Vent-1 360-Deg.
2 03:52 X
RAS Obtained 1800. See Tape 4, TC.14:43 for remaining.
.'(
F ank L, onard, lexamriner date R
Ricky Seals, examiner date Level III, Visual I I
I Level III, Visual I_
,Inspection Services Organization Inspection Services Organization Matt Welch, 2nd party review date Leem Brinkman, 2nd'p-arty review date Level Ill, Visual II Level 11, Visual
_Inspection Services Organization Notes:
1)Tape 1-Data on tape count 16:48 through 24:59 not used. Tape count at 24:59 changes to 00:00.
2)Tape 1-Small amount of crystals seen on head surface. Not originating from CRDM crevice. Cleaned and re-examined. See tape 5, TC 14:52.
I I
t I
- 3) Insulation Support ring (top hat) in contact with head. No obstruction
_d4)
Could not remove with air. Image compared to RFO5. No change.
WBN U1C7 RPV Closure Head VT Page 12 of 12 Rev. 0
WBN Ul, CyL..
.,7, RPV Lower Head VT Resolution Check Verifications Tape Examiner Visual Exam Character Date Time No.
Count Initials Card ID No.
Height Distance Results Comments 9/17/06 1135 1
00:00 RAS 143
.105" 3"& 6" SAT Cal In 9/17/06 1710 1
32:26 RAS 143
.105" 3"& 6" SAT 9/17/06 1845 2
32:35 RAS 143
.105' 3"& 6" SAT 9/17/06 2019 3
27:00 FCL 143
.105" 3"& 6" SAT Cal out first camera 9/17/06 2356 3
28:30 FCL 143
.105" 3"& 6" SAT Cal in new camera 9/18/06 0118 4
00:42 FCL 143
.105" 3"& 6" SAT 9/18/06 0617 4
47:17 FCL 143
.105" 3"& 6" SAT 9/18/06 0846 5
00:00 RAS 143
.105" 3"& 6" SAT 9/18/06 0945 5
23:14 RAS 143
.105' 3"& 6" SAT Final cal Frank Leonard (FCL) LI I'Visual date Ricky Seals (RAS) LIII/yisual date 4:
_/_
-7 Visual Verification Checks.xls
90, REFERENCE DRAWINGS CONTRACT NO. 71C62-54114-1 DRAWING NO. 30738-1539 686J487 NO TES:
I. ALL CROM NUMBERS ARE PRECEDED BY CRDW FOR THE WELD NUMBERS.
- 2.
FOR PENETRATION DETAILS SEE SHEET 2.
- 3.
THE REACTOR VESSEL 0D IS 780' OUT OF PHASE FROM THE REACTOR BUILDINc 0,.
ASME CC-I (EQUIVALENT)
PERIPHERAL HOUSINGS STUD STUD
~OrATE VICY LaO TO U4TOI ORIENTATIOiA DURINGC EXAM. REVISE WIAWERITNO TO ALT CT PLAILT STSTLLA PER FCOT DA-01
- tL L.fEAJ -
- L - LSE - 26R.L.-
L 2zTEE'..
A-O CRIB -D RVCLHA. ~II C L L --ýH-J - -mcý-. - L _ _ k _J o__Lz:,_, _
MOVE CRD VNt 10.
TO SHEET 2. DELETE LII 10.
II ITT PERIPAERAL HOUSItIC' REV. TITLE OLRCK 1 AM Lfjl Ar-lL PVEMAY TAW S
- 0.
AM M7.2. 0111C W11 J ooa bRaAcl Tft.
. SID WA REv-
ýiY IVO-rL1 I
-1 ITTED I A IT
- bAr, TENNESSEE VALLEY AUTHORITy WATTS &AN NUCLEAR PLANT UNIT I CLOSURE HEAD PENE TRAT IONS I AT:
I
..AL.
T T A.
AEMCV: S APCOGOL e CI-0 AORTIAO
&RAH 1P l Im 2A RVCLHEAD (RV CLOSURE HEAD PENETRATIONS.
AUGMENTED EXAM)
TOP VIEW rr.
I
?CHA-26-34-C--1 V)4