November 9, 2006

Carolina Power & Light Company

ATTN: Mr. T. D. Walt

Vice President

H. B. Robinson Steam Electric Plant Unit 2

3581 West Entrance Road

Hartsville, SC 29550

SUBJECT: REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -

H. B. ROBINSON NUCLEAR PLANT 05000261/2007301

Dear Mr. Walt:

In a telephone conversation on November 2, 2006, between Mike Milbee, Lead - Nuclear

Operations Training Instructor, and Mr. Richard S. Baldwin, Sr. Operations Engineer,

arrangements were made for the administration of licensing examinations at the Robinson

Nuclear Plant during the weeks of February 5 and 12, 2007. The on-site preparatory week is

scheduled for the week of January 8, 2007.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG 1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9. The NRC regional office will discuss with your staff any changes that

might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by November 20, 2006. The written examinations and operating tests, as well as the

supporting reference materials identified in NUREG 1021, ES-201, Attachment 2, Reference

Material Guidelines For Initial Licensing Examinations, will be due by December 22, 2006.

Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall

approve the outlines, examinations, and tests before they are submitted to the NRC for review

and approval. All materials shall be complete and ready-to-use. We request that any personal,

proprietary, sensitive unclassified, or safeguards information in your response be contained in a

separate enclosure and appropriately marked. Any delay in receiving the required examination

and reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with NUREG 1021, ES-402, Administering Initial Written Examinations, and to make the simulation facility

available on the dates noted above. In accordance with NUREG 1021, ES-302, Administering

Operating Tests To Initial License Applicants, your staff should retain the original simulator

performance data (e.g., system pressures, temperatures, and levels) generated during the

dynamic operating tests until the examination results are final.

CP&L 2

Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations,

contains a number of NRC policies and guidelines that will be in effect while the written

examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,

2009. The public reporting burden for this collection of information is estimated to average 500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet

electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and

Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS

is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public

Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Milbee has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Richard S. Baldwin at (404) 562- 4642, (Internet

E-mail: rsb2@nrc.gov), or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov).

Sincerely,

/RA By C. Payne For/

Robert C. Haag, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-261

License Nos.: DPR-23

cc: (See next page)

_________________________

OFFICE RII:DRS RII:DRS RII:DRP

SIGNATURE /RA/ /RA By R. Baldwin for/ /RA/

NAME RBaldwin RHaag RMusser

DATE 11/ /2006 11/ /2006 11/ /2006 11/ /2006 11/ /2006 11/ /2006 11/ /2006

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

CP&L 3

cc contd:

William G. Noll Beverly Hall, Chief Radiation

Director, Site Operations Protection Section

Carolina Power & Light Company N. C. Department of Environment,

H. B. Robinson Steam Electric Plant Health and Natural Resources

Electronic Mail Distribution Electronic Mail Distribution

Ernest J. Kapopoulos, Jr. David T. Conley

Plant General Manager Associate General Counsel - Legal Dept.

Carolina Power & Light Company Progress Energy Service Company, LLC

H. B. Robinson Steam Electric Plant Electronic Mail Distribution

Electronic Mail Distribution

John H. O'Neill, Jr.

Chris L. Burton, Manager Shaw, Pittman, Potts & Trowbridge

Performance Evaluation and 2300 N. Street, NW

Regulatory Affairs CPB 9 Washington, DC 20037-1128

Electronic Mail Distribution

Chairman of the North Carolina

C. T. Baucom, Supervisor Utilities Commission

Licensing/Regulatory Programs c/o Sam Watson, Staff Attorney

Carolina Power & Light Company Electronic Mail Distribution

H. B. Robinson Steam Electric Plant

Electronic Mail Distribution Robert P. Gruber

Executive Director

J. F. Lucas, Manager Public Staff - NCUC

Support Services - Nuclear 4326 Mail Service Center

Carolina Power & Light Company Raleigh, NC 27699-4326

H. B. Robinson Steam Electric Plant

Electronic Mail Distribution Public Service Commission

State of South Carolina

Henry J. Porter, Director P. O. Box 11649

Div. of Radioactive Waste Mgmt. Columbia, SC 29211

Dept. of Health and Environmental

Control Mr. Gregg Ludlam, Training Manager

Electronic Mail Distribution H. B. Robinson Steam Electric Plant Unit 2

Progress Energy Carolinas, Inc.

R. Mike Gandy 3581 West Entrance Road

Division of Radioactive Waste Mgmt. Hartsville, SC 29550

S. C. Department of Health and

Environmental Control

Electronic Mail Distribution

CP&L 4

Distribution:

C. Patel, NRR

C. Evans (Part 72 Only)

L. Slack, RII EICS

OE Mail (email address if applicable)

RIDSNRRDIRS

PUBLIC