November 9, 2006
Carolina Power & Light Company
ATTN: Mr. T. D. Walt
Vice President
H. B. Robinson Steam Electric Plant Unit 2
3581 West Entrance Road
Hartsville, SC 29550
SUBJECT:
REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -
H. B. ROBINSON NUCLEAR PLANT 05000261/2007301
Dear Mr. Walt:
In a telephone conversation on November 2, 2006, between Mike Milbee, Lead - Nuclear
Operations Training Instructor, and Mr. Richard S. Baldwin, Sr. Operations Engineer,
arrangements were made for the administration of licensing examinations at the Robinson
Nuclear Plant during the weeks of February 5 and 12, 2007. The on-site preparatory week is
scheduled for the week of January 8, 2007.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG 1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9. The NRC regional office will discuss with your staff any changes that
might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by November 20, 2006. The written examinations and operating tests, as well as the
supporting reference materials identified in NUREG 1021, ES-201, Attachment 2, Reference
Material Guidelines For Initial Licensing Examinations, will be due by December 22, 2006.
Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall
approve the outlines, examinations, and tests before they are submitted to the NRC for review
and approval. All materials shall be complete and ready-to-use. We request that any personal,
proprietary, sensitive unclassified, or safeguards information in your response be contained in a
separate enclosure and appropriately marked. Any delay in receiving the required examination
and reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with NUREG 1021, ES-402, Administering Initial Written Examinations, and to make the simulation facility
available on the dates noted above. In accordance with NUREG 1021, ES-302, Administering
Operating Tests To Initial License Applicants, your staff should retain the original simulator
performance data (e.g., system pressures, temperatures, and levels) generated during the
dynamic operating tests until the examination results are final.
2
Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations,
contains a number of NRC policies and guidelines that will be in effect while the written
examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
2009. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet
electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and
Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS
is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public
Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Milbee has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Richard S. Baldwin at (404) 562- 4642, (Internet
E-mail: rsb2@nrc.gov), or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov).
Sincerely,
/RA By C. Payne For/
Robert C. Haag, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-261
License Nos.: DPR-23
cc: (See next page)
_________________________
OFFICE
RII:DRS
RII:DRS
RII:DRP
SIGNATURE
/RA/
/RA By R. Baldwin for/
/RA/
NAME
RBaldwin
RHaag
RMusser
DATE
11/ /2006
11/ /2006
11/ /2006
11/ /2006
11/ /2006
11/ /2006
11/ /2006
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO
3
cc contd:
William G. Noll
Director, Site Operations
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
Electronic Mail Distribution
Ernest J. Kapopoulos, Jr.
Plant General Manager
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
Electronic Mail Distribution
Chris L. Burton, Manager
Performance Evaluation and
Regulatory Affairs CPB 9
Electronic Mail Distribution
C. T. Baucom, Supervisor
Licensing/Regulatory Programs
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
Electronic Mail Distribution
J. F. Lucas, Manager
Support Services - Nuclear
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
Electronic Mail Distribution
Henry J. Porter, Director
Div. of Radioactive Waste Mgmt.
Dept. of Health and Environmental
Control
Electronic Mail Distribution
R. Mike Gandy
Division of Radioactive Waste Mgmt.
S. C. Department of Health and
Environmental Control
Electronic Mail Distribution
Beverly Hall, Chief Radiation
Protection Section
N. C. Department of Environment,
Health and Natural Resources
Electronic Mail Distribution
David T. Conley
Associate General Counsel - Legal Dept.
Progress Energy Service Company, LLC
Electronic Mail Distribution
John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, NW
Washington, DC 20037-1128
Chairman of the North Carolina
Utilities Commission
c/o Sam Watson, Staff Attorney
Electronic Mail Distribution
Robert P. Gruber
Executive Director
Public Staff - NCUC
4326 Mail Service Center
Raleigh, NC 27699-4326
Public Service Commission
State of South Carolina
P. O. Box 11649
Columbia, SC 29211
Mr. Gregg Ludlam, Training Manager
H. B. Robinson Steam Electric Plant Unit 2
Progress Energy Carolinas, Inc.
3581 West Entrance Road
Hartsville, SC 29550
4
Distribution:
C. Patel, NRR
C. Evans (Part 72 Only)
L. Slack, RII EICS
OE Mail (email address if applicable)
RIDSNRRDIRS
PUBLIC