Similar Documents at Byron |
---|
Category:License-Operator
MONTHYEARML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination ML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21361A1732021-10-28028 October 2021 Proposed Sim JPM BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21361A1162021-10-28028 October 2021 ES-301-3 ML21356B7332021-10-28028 October 2021 ES-403-1 ML21361A1592021-10-28028 October 2021 Proposed RO Admin JPM ML21361A1242021-10-28028 October 2021 ES-301-4 ML21361A1262021-10-28028 October 2021 ES-301-6 ML21361A1572021-10-28028 October 2021 Proposed in Plant JPM ML21361A1072021-10-28028 October 2021 2021-301 Byron NRC Exam Submittal Letter ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21356B7242021-10-28028 October 2021 Ile Outline Review Comments Response ML21361A2732021-10-28028 October 2021 ES-201-2 BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A1782021-10-28028 October 2021 Proposed Written Exam ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A3312021-10-28028 October 2021 SRO Admin JPM ML21361A2752021-10-28028 October 2021 ES-301-5 ML21361A3252021-10-28028 October 2021 Scenarios ML21361A3322021-10-28028 October 2021 Written Exam 2024-06-19
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21361A1072021-10-28028 October 2021 2021-301 Byron NRC Exam Submittal Letter BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A3322021-10-28028 October 2021 Written Exam ML21361A1782021-10-28028 October 2021 Proposed Written Exam ML21356B7332021-10-28028 October 2021 ES-403-1 ML21361A1572021-10-28028 October 2021 Proposed in Plant JPM ML21361A1772021-10-28028 October 2021 Proposed SRO Admin JPM ML21361A1262021-10-28028 October 2021 ES-301-6 ML21356B7322021-10-28028 October 2021 ES-201-1 ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21361A1592021-10-28028 October 2021 Proposed RO Admin JPM ML21356B7242021-10-28028 October 2021 Ile Outline Review Comments Response ML21361A3292021-10-28028 October 2021 Sim Job Performance Measure ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A3312021-10-28028 October 2021 SRO Admin JPM ML21361A1162021-10-28028 October 2021 ES-301-3 ML21356B7252021-10-28028 October 2021 ES-301-7 BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline ML21361A2452021-10-28028 October 2021 ES-301-1 2024-06-19
[Table view] |
Text
-
UPDATED CHECKLISTS ADMINISTERED EXAMINATION FOR THE BYRON INITIAL EXAMINATION - JUNE 2006
ES-301 Control Room/ln-Plant Systems Outline Form ES-301-2 Facility: Bvron Date of Examination: 6/19/06 Exam Level (circle one) SRO(I) / SRO(U) Operating Test Number: 2006-301 Control Room Systems (8 for RO, 7 for SRO-I, 2 or 3 for SRO-U)
System / JPM Title Type Code' Safety Function
- a. Remove Excess Letdown from service S, D 1 WA 004A4.06 Imp Factor 3.6
- b. Main Control Room HVAC Makeup Filter and Charcoal S, A, M 2 WA 013K1.13 Imp Factor 2.8 1 c. Filling the RWST S, D 3 WA 006A4.03 Imp Factor 3.5
- d. Respond to High RCP Seal Leakoff flow s, D 4P WA 003A2.01 Imp Factor 3.5
- e. Respond to Main Generator Field Forcing s, D 4s WA 045K3.01 Imp Factor 2.9
- f. Drain the PRT due to inadvertent PORV opening S,A, M 5 WA 007A1.01 Imp Factor 2.9
- g. Parallel DG to SAT and load DG S, M, A 6 WA 0064A4.06 Imp Factor 3.9
- h. Refueling Setpoint Change for AROl 1and AR012 S, A, M, L 7 KIA 072A4.01 Imp Factor 3.0
- i. Open SX Suction Valve for -AF Pump A, E, M. R 4s WA 061K1.07 Imp Factor 3.6
- j. Align FP for cooling -CV Pump D, E, L, R 8 WA 086K1.02 Imp Factor 2.7
- k. Start up DC ESF Battery Charger D 6 WA 063A3.01 Imp Factor 2.7
ES-301 Control Roomiln-Plant Systems Outline Form ES-301-2 Facility: Byron Date of Examination: 6/19/06 Exam Level (circle one): RO Operating Test Number: 2006-301 Control Room Systems (8 for RO, 7 for SRO-I, 2 or 3 for SRO-U)
System I JPM Title Type Code' Safety Function
- a. Remove Excess Letdown from service KIA 004A4.06 ImD Factor 3.1 ~~
- b. Main Control Room HVAC Makeup Filter and Charcoal S, A, M KIA 013K1.13 Imp Factor 3.1
- c. Filling the RWST WA006A4.03 , Imp Factor 3.5
- d. Respond to High RCP Seal Leakoff flow WA 003A2.01 Imp Factor 3.9
- f. Drain the PRT due to inadvertent PORV opening WA 007A1.01 ImD Factor 3.1
- g. Parallel DG to SAT and load DG WA 0064A4.06 Imp Factor 3.9
- h. Refueling Setpoint Change for AROll and AR012 WA 072A4.01 Imp Factor 3.3
- i. Open SX Suction Valve for -AF Pump A, E, M. R 4s WA 061K1.07 Imp Factor 3.8
- j. Align FP for cooling -CV Pump D, E, L, R 8 WA 086K1.02 Imp Factor 3.2
- k. Start up DC ESF Battery Charger D 6 WA 063A3.01 Imp Factor 3.1 (L)ow Power 2 1 It1121 (N)ew or (M)odifiedfrom bank 22/22 121 (P)reviuos2 exams 5 3 I < 3 1 2 2 (randomly selected)
(WCA 2 1 121 121 iS)imulator ES-301 NUREG-1021, Revision