MONTHYEARLG-22-070, Owner'S Activity Report (OAR-1) for Li1R192022-07-21021 July 2022 Owner'S Activity Report (OAR-1) for Li1R19 LG-21-075, Owner'S Activity Report (OAR-1)2021-08-0505 August 2021 Owner'S Activity Report (OAR-1) ML21062A0502021-03-0303 March 2021 Submittal of a Revision 28 of the Limerock Generating Station Inservice Testing Program LG-20-058, Submittal of Revision to Fourth Ten-Year Interval for the Limerick Inservice Testing Program2020-09-21021 September 2020 Submittal of Revision to Fourth Ten-Year Interval for the Limerick Inservice Testing Program LG-20-065, Owner'S Activity Report (OAR-1)2020-07-0909 July 2020 Owner'S Activity Report (OAR-1) ML20036E4882020-02-0505 February 2020 TS Change and Relief Requests Related to Safety Relief Valve Testing NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-8792019-10-16016 October 2019 Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 ML19218A0442019-08-0101 August 2019 Owner'S Activity Report (OAR-1) NMP2L2700, Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants2019-04-30030 April 2019 Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants ML18352A2272018-12-17017 December 2018 Relief Requests Associated with Fourth Ten-Year Lnservice Testing Interval ML18198A2952018-07-17017 July 2018 Owner'S Activity Report (OAR-1) ML17237A0212017-08-25025 August 2017 Owner'S Activity Report (OAR-1) ML16229A1882016-07-15015 July 2016 Inservice Inspections Summary Report for 04/08/2014 - 04/17/2016 ML15224B3592015-08-0404 August 2015 Inservice Inspections Summary Report for the Period April 19, 2013, Through May 7, 2015 ML15104A5312015-04-13013 April 2015 Submittal of Relief Request to Utilize OMN-18 ML14192A4802014-07-0707 July 2014 Inservice Inspections Summary Report for the Period March 23, 2012 to April 8, 2014 ML13210A2032013-07-17017 July 2013 Summary Report for Inservice Inspections (2R12) ML12184A0332012-06-15015 June 2012 ISI Summary Report Limerick Generating Station Unit 1, Refueling Outage: 1R14 Commercial Service Date: February 1, 1986 ML11209B7092011-07-22022 July 2011 Submittal of Summary Report for Inservice Inspections (2R11) ML1019701232010-07-0909 July 2010 Transmittal of Summary Report for Inservice Inspections (1R13) for Period March 21, 2008 to April 12, 2010 TMI-09-086, Submittal of Concerning Unsatisfactory Laboratory Performance Tests2009-07-30030 July 2009 Submittal of Concerning Unsatisfactory Laboratory Performance Tests ML0919705992009-07-16016 July 2009 Submittal of Relief Requests Associated with the Third Inservice Testing Interval ML0920203902009-07-10010 July 2009 Summary Report for Inservice Inspections (2R10) ML0905007202009-02-18018 February 2009 Submittal of Relief Requests Associated with the Third Inservice Testing Interval ML0817204512008-06-18018 June 2008 LGS Unit 1 Summary Report for Inservice Inspection (1R12) ML0731703702007-11-0808 November 2007 Response to Request for Additional Information - Submittal of Relief Requests Associated with the Third Lnservice Inspection (ISI) Interval ML0721302242007-07-27027 July 2007 Summary Report for Inservice Inspections (2R09) Revision 1 ML0725502312007-07-0303 July 2007 Summary Report for Inservice Inspections (2R09) for Period March 19, 2005 to April 4, 2007 RS-07-058, Amergen/Exelon Nuclear - Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements2007-04-19019 April 2007 Amergen/Exelon Nuclear - Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements ML0708007412007-03-0606 March 2007 Submittal of Third Inservice Inspection (ISI) Interval Program Plan ML0630406532006-10-31031 October 2006 Response to Request for Additional Information - Alignment of Inservice Inspection and Containment Inservice Inspection Intervals ML0621900202006-08-0404 August 2006 Inservice Inspection Program - Alignment of Inservice Inspection and Containment Inservice Inspection (Cisi) Intervals ML0617802642006-06-22022 June 2006 Summary Report for Inservice Inspections (1R11) ML0517103452005-06-15015 June 2005 Summary Report for Inservice Inspections ML0317603872003-06-20020 June 2003 Summary Report for Inservice Inspections (2R07) ML0217505662002-06-14014 June 2002 Summary Report for Inservice Inspections & ASME Section XI Repairs & Replacement (1R09) 2022-07-21
[Table view] Category:Letter
MONTHYEARIR 05000352/20243012024-02-0202 February 2024 Initial Operator Licensing Examination Report 05000352/2024301 and 05000353/2024301 IR 05000352/20230042024-01-31031 January 2024 Integrated Inspection Report 05000352/2023004 and 05000353/2023004 IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 ML24026A2962024-01-26026 January 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Syrs, . ML24004A0342024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0026 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000352/20230102024-01-11011 January 2024 Age-Related Degradation Report 05000352/2023010 and 05000353/2023010 IR 05000352/20234012023-12-21021 December 2023 Cybersecurity Inspection Report 05000352/2023401 and 05000353/2023401 ML23321A2362023-12-14014 December 2023 Issuance of Amendment Nos. 262 and 224 Adoption of TSTF-477, Revision 3 and Associated Technical Specification Changes ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23333A2182023-11-29029 November 2023 Operator Licensing Examination Approval ML23325A2062023-11-21021 November 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23313A0432023-11-13013 November 2023 Summary of Regulatory Audit in Support of Amendment Request for Control Room Air Conditioning Technical Specifications ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000352/20230032023-10-27027 October 2023 Integrated Inspection Report 05000352/2023003 and 05000353/2023003 and Independent Spent Fuel Storage Installation Inspection 07200065/2023001 ML23297A1722023-10-24024 October 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2023501 and 05000353/2023501 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23276A5162023-10-0303 October 2023 Federal Emergency Management Agency Level 1 Finding from 2023 Evaluated Emergency Preparedness Exercise ML23275A1082023-09-29029 September 2023 FEMA Level 1 Findings Limerick NPP- Boyertown/Colebrookdale ML23241A9452023-09-27027 September 2023 Generation Station, Units 1 and 2 Regulatory Audit Plan Supporting Review of the Equipment Qualification Portion of Limerick Digital Instrumentation and Controls License Amendment Request ML23269A0522023-09-26026 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000352/2023010 and 05000353/2023010 ML23255A0952023-09-12012 September 2023 Resubmittal of License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) to Address ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A1002023-09-0606 September 2023 Requalification Program Inspection IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) ML23248A2082023-08-31031 August 2023 UFSAR Cover Page ML23242A2172023-08-30030 August 2023 Response to Request for Additional Information for Application to Adopt TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems and Associated Technical Specification Changes NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23228A0942023-08-16016 August 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . IR 05000352/20230022023-08-14014 August 2023 Integrated Inspection Report 05000352/2023002 and 05000353/2023002 ML23220A0182023-08-0808 August 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2023401 and 05000353/2023401 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor ML23212B2362023-07-31031 July 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System - WEC Documents ML23212B1052023-07-31031 July 2023 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise ML23202A2192023-07-21021 July 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . ML23193B0122023-07-20020 July 2023 Audit Plan in Support of Review of License Amendment Request and Exemption Request for Digital Instrumentation and Controls Installation Support (Epids L-2023-LLA-0025 and L-2023-LLE-0005) ML23187A0962023-07-19019 July 2023 Generation Station, Unit Nos. 1 and 2 - Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23208A1522023-07-0606 July 2023 PEMA Letter Dated 7-6-23 Re Limerick Exercise 9-26-23 ML23177A2242023-06-26026 June 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . ML23145A1972023-06-23023 June 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 255, 256, 257, 258, 259, and 260 2024-02-02
[Table view] |
Text
Exelon Nuclear 200 Exelon Way www.exe1on corp.com r\luclear Kennett Square, PA 19348 10 CFR 50.55a October 31,2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
Subject:
Response to Request for Additional Information Alignment of Inservice Inspection and Containment Inservice Inspection (CISI) Intervals
References:
- 1) Letter from P. B. Cowan (Exelon Generation Company, LLC) to U. S. Nuclear Regulatory Commission (NRC), dated August 4, 2006
- 2) Letter from R. V. Guzman (NRC) to C. M. Crane (Exelon Generation Company, LLC), dated October 1 1,2006 In the Reference 1 letter, Exelon Generation Company, LLC (EGC), requested relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," on the basis that the proposed alternative provides an acceptable level of quality and safety.
Specifically, relief is being sought to reduce the duration of the Limerick Generating Station, Unit 2 second Inservice Inspection (61)interval in order to create a common IS1 interval for Limerick Generating Station, Units 1 and 2. In addition, relief is requested to reduce the first Containment Inservice Inspection (CISI) interval for Limerick Generating Station, Unit 2, which will permit subsequent CIS1 interval dates to be synchronized with the future IS1 intervals for both units. The net effect of this request is to establish one common interval for both the IS1 and CIS1 Programs at Limerick Generating Station, Units 1 and 2.
In the Reference 2 letter, the U. S. Nuclear Regulatory Commission requested additional information.
Attached is our response to this request.
Should you have any questions concerning this letter, please contact Tom Loomis at (610) 765-5510.
Pamela B. &wan Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC
Attachment:
- 1) Response to Request for Additional Information cc: S. J. Collins, Regional Administrator, Region I, USNRC S. Hansell, USNRC Senior Resident Inspector, LGS R. Guzman, Project Manager [LGS] USNRC J. Kim, Assistant Project Manager [LGS] USNRC
RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION Response to Request for Additional Information Alignment of Inservice Inspection and Containment Inservice Inspection (CISI) Intervals QUESTION:
- 1. With respect to the last paragraph of Section 4.0 of the submittal dated August 4, 2006, Reason for Request (page 2 of 6), it is stated that, "Any examination methods unique to and specifically required in the remainder of the LGS, Unit 2 Third Period under the previous ISI
[Inservice Inspection] Interval Code (i.e., American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, 1989 Edition), that will likewise be required in the next ISI Interval, will be scheduled and completed in the First Period of this subsequent interval."
List and discuss the LGS Unit 2 specific items that are within the category of "any examination methods unique to and specifically required in the remainder of the Limerick Generating Station Unit 2 Third Period under the previous ISI interval code, that will likewise be required in the next ISI Interval," and will be scheduled and completed in the first period of the third ISI interval. As applicable, list and clarify those items that are specifically required in the remainder of the LGS, Unit 2 third period under the previous ISI interval code, but will not be scheduled and completed in the first period of the third ISI interval.
Discuss the potential implication of the above with respect to the Exelon Generation Company's (EGC's) stated intent of providing an acceptable level of quality and safety pursuant to Section 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations.
RESPONSE
The Limerick Generating Station (LGS), Unit 2 specific items that are "unique to and specifically required" in the remainder of the LGS, Unit 2 third period under the 1989 Edition, no Addenda, of ASME Section XI are provided below in Table 1. These "unique to and specifically required" examinations are those examinations that are specifically required by the Code to be performed at the end of the interval. The exam methods for each unique inspection required under the ASME Section XI 1989 Edition, no Addenda, are shown in Table 1. These inspections will be performed in accordance with the examination method required by the 2001 Edition, 2003 Addenda, of ASME Section XI for the corresponding item number, and credited to the first period of the third interval. For example, the 1989 Edition, no Addenda, of ASME Section XI has a requirement for a visual, VT-2, examination of the extended boundary Class 1 pressure test, under Examination Category B-P, Item Number B15.11. This extended boundary Class 1 pressure test is scheduled for the first period of the third interval (i.e., previously scheduled for the third period of the second interval) for a visual, VT-2, examination in accordance with Examination Category B-P, Item Number B15.10, in the 2001 Edition, 2003 Addenda, of ASME Section XI. Performing these (now first period) exams using the 2001 Edition, 2003 Addenda, of ASME Section XI (i.e., the latest NRC approved version of the ASME code per 10CFR50.55a(b)(2)), as modified by 10CFR50.55a, will ensure an adequate level of quality and safety.
Additionally, for Examination Categories where 100% of the population is required to be examined by the end of the current third period, the remaining examinations will be performed in accordance with the examination method required by the 2001 Edition, 2003 Addenda, of ASME Section XI, for the corresponding item number, and credited to the first period of the third interval. This method of scheduling will maintain the original sequence of examinations, will not affect the frequency of examinations, and will maintain a rolling 10-year inspection schedule for the successive examination of selected components, in accordance with IWB-2420(a), IWC-2420(a), IWD-2420(a), IWE-2420(a), and IWF-2420(a). This will ensure an adequate level of quality and safety.
Page 1 of 3
Response to Request for Additional Information Alignment of Inservice Inspection and Containment Inservice Inspection (CISI) Intervals Table 1: Unique Items 1989 Edition, No Addenda 2001 Edition, 2003 Addenda Exam Item Exam Exam Item Exam Comments Category No. Method Category No. Method B-E B4.10 Visual, VT-2 B-P B15.10 Visual, VT-2 Exams required during extended boundary Class 1 pressure test B-P B15.11 Visual, VT-2 B-P B15.10 Visual, VT-2 Extended boundary Class 1 pressure test C-H C7.20 Visual, VT-2 C-H C7.10 Visual, VT-2 EOI Class 2 pressure tests C7.40 Visual, VT-2 C7.10 Visual, VT-2 EOI Class 2 pressure tests C7.60 Visual, VT-2 C7.10 Visual, VT-2 EOI Class 2 pressure tests C7.80 Visual, VT-2 C7.10 Visual, VT-2 EOI Class 2 pressure tests D-A D1.10 Visual, VT-2 D-B D2.10 Visual, VT-2 EOI Class 3 pressure tests D-B D2.10 Visual, VT-2 D-B D2.10 Visual, VT-2 EOI Class 3 pressure tests D-C D3.10 Visual, VT-2 D-B D2.10 Visual, VT-2 EOI Class 3 pressure tests Note: EOI - End-of-Interval There are no items that were specifically required in the remainder of the LGS, Unit 2 third period under the 1989 Edition, no Addenda, of ASME Section XI that will not be scheduled and completed in the first period of the third interval utilizing the examination methodology identified in the 2001 Edition, 2003 Addenda, of ASME Section XI. In accordance with IWB-2420(a),
IWC-2420(a), IWD-2420(a), IWE-2420(a), and IWF-2420(a), the intent is to maintain a rolling 10-year inspection schedule for the successive examination of selected components.
QUESTION:
- 2. With respect to the third paragraph of page 3 of 6, under Section 4.0, Reason for Request, it is stated that, "...For the IWE portion of the program, the examinations scheduled for the first, second, and third inspection periods Limerick Generating Station, Unit 1 have been completed, and the examinations scheduled for the first and second inspection periods for Limerick Generating Station, Unit 2 have been completed..." As applicable, clarify EGC's intended disposition of the examination items that might have been scheduled for the third inspection period of the first interval containment inservice inspection (CISI) program for the LGS, Unit 2. Also, with respect to the rolling IWL portion of the LGS CISI programs, discuss EGC's recent inspection activities and results, and their key inspection milestones.
RESPONSE
The LGS, Unit 2 CISI specific items that have been scheduled for the LGS, Unit 2 third period under the 1992 Edition, 1992 Addenda, of ASME Section XI, include the following:
Page 2 of 3
Response to Request for Additional Information Alignment of Inservice Inspection and Containment Inservice Inspection (CISI) Intervals Table 2: Containment Inspections 1992 Edition, 1992 Addenda 2001 Edition, 2003 Addenda Exam Item Exam Exam Item Exam Comments Category No. Method Category No. Method E-A E1.11 Visual, VT-3 E-A E1.11 Visual, VT-3 Periodic MC exam E-A E1.12 Visual, VT-3 E-A E1.12 Visual, VT-3 Underwater exams required at the EOI.
L-A L1.11 Visual, VT-3C L-A L1.11 Visual, VT-3C Periodic CC exam Note: EOI - End-of-Interval The inspections within the examination category and item number scheduled for the third period of the first CISI interval for LGS, Unit 2, which were to be performed in accordance with the 1992 Edition, 1992 Addenda, of the ASME Section XI Code, will be performed in the first period of the second CISI interval for LGS, Unit 2. The examination method for these inspections will be based on the methodology listed in the 2001 Edition, 2003 Addenda, of ASME Section XI (i.e., the latest NRC approved version of the ASME code per 10CFR50.55a(b)(2)), as modified by 10CFR50.55a, which will ensure an adequate level of quality and safety.
IWL examinations, which were to be performed within the first CISI interval in accordance with the 1992 Edition, 1992 Addenda of the ASME Section XI Code, will continue to be performed in accordance with the five (5) year frequency. These inspections will remain on a rolling frequency to ensure that the IWL inspections are performed within the five (5) year allowances as defined in IWL-2400. The examination method used for the 5-year IWL exams, which fall within the second CISI interval will be based on the methodology listed in the 2001 Edition, 2003 Addenda of ASME Section XI (i.e., the latest NRC approved version of the ASME Code per 10CFR50.55a(b)(2)), as modified by 10CFR50.55a, which will ensure an adequate level of quality and safety.
The results of the most recent Unit 2 IWL inspections of concrete revealed no reportable indications. These inspections were completed in March 2005, and the next IWL concrete containment inspections are scheduled to be completed prior to March 2010, in accordance with the requirements of the 2001 Edition, 2003 Addenda, of ASME Section XI, as modified by 10CFR50.55a.