Request for Additional Information Regarding the 2006 Steam Generator Tube Inspections
ML062680304
Person / Time
Site: San Onofre 
(NPF-010)
Issue date: 09/28/2006
From: Kalyanam N
NRC/NRR/ADRO/DORL/LPLIV
To: Rosenblum R
Southern California Edison Co
Kalyanam N, NRR/DORL, 415-1480
References
TAC MC8395
Download: ML062680304 (5)


Text

September 28, 2006 Mr. Richard M. Rosenblum Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 2 (SONGS 2) -

REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING THE 2006 STEAM GENERATOR TUBE INSPECTIONS (TAC NO. MC8395)

Dear Mr. Rosenblum:

By letter dated February 7, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML060400103), Southern California Edison Company (the licensee) submitted information summarizing the results of the 2006 steam generator tube inspections at SONGS 2. In addition to these reports, the U.S. Nuclear Regulatory Commission (NRC) staff summarized additional information concerning the 2006 steam generator tube inspections at SONGS 2 in a letter dated April 3, 2006 (ADAMS Accession No. ML060950305).

In order for the NRC staff to complete its review of the licensees reports, it has been determined that additional information is required to complete the review. We request the response to this RAI within 30 days from the date of this letter.

If you have any questions, please contact me at (301) 415-1480.

Sincerely,

/RA/

N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-361

Enclosure:

Request for Additional Information cc w/encl: See next page

ML060950305).

In order for the NRC staff to complete its review of the licensees reports, it has been determined that additional information is required to complete the review. We request the response to this RAI within 30 days from the date of this letter.

If you have any questions, please contact me at (301) 415-1480.

Sincerely,

/RA/

N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-361

Enclosure:

Request for Additional Information cc w/encl: See next page DISTRIBUTION PUBLIC LPLIV r/f RidsNrrDorlLpl4 RidsNrrPMNKalyanam RidsNrrLALFeizollahi RidsNrrDciCsgb RidsAcrsAcnwMailCenter RidsOgcRp KKarwoski, DCI RidsRgn4MailCenter (TPruett)

RidsNrrDorlDpr ACCESSION NO: ML062680304

  • No major change from Staff provided RAI OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DCI/CSGB NRR/LPL4/BC NAME NKalyanam LFeizollahi AHiser*

DTerao DATE 9/27/06 9/27/06 9/1/06 9/28/06

REQUEST FOR ADDITIONAL INFORMATION SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 2 2006 STEAM GENERATOR TUBE INSPECTIONS 1.

During a conference call in which the 2006 steam generator tube inspections were discussed (refer to U.S. Nuclear Regulatory Commission (NRC) letter dated April 3, 2006 - Agencywide Documents Access and Management System Accession No. ML060950305), there was some discussion concerning nickel migration associated with sleeved tubes. Please provide additional information concerning the nature of this phenomenon and the extent to which it could affect the detectability of flaws in the pressure boundary portion of the tube and the sleeve.

2.

Please confirm that no cracking was identified in dents and dings during your 2006 inspections. If cracking was identified, please provide the size of the dent/ding, the location of the flaw, and its estimated size. The staff recognizes that certain dents/dings were not inspected with a rotating probe because of interferences associated with sleeves installed in the tube (and, as a result, a flaw could not positively be identified at the dents/dings in these tubes).

3.

Please discuss the results of your inspections associated with the scallop bars.

4.

Regarding the eight tubes that were not inspected with a rotating probe due to interference associated with the sleeves installed in the tubes, please provide the following information: the voltage for these indications, a summary of whether the dent has changed in size/characteristic since the prior inspection, and the date of the last rotating probe examination. These eight tubes were not in-situ pressure tested.

5.

Table 3 of the February 7, 2006, letter implies that 145 tubes were plugged for active degradation in steam generator E-088 and 76 tubes were plugged for active degradation in steam generator E-089. Tables 8 and 9, however, only provide the sizes of approximately 40 indications in steam generator E-088 and 15 indications in steam generator E-089. Please provide the sizes (e.g., percent wall thickness) of all detected indications.

6.

Please discuss how the operating experience at Waterford Steam Electric Station, Unit 3 (refer to NRC Information Notice 2005-29, Steam Generator Tube and Support Configuration) was factored into your 2006 steam generator tube inspections.

7.

In the NRCs summary of a conference call held to discuss the results of your 2006 steam generator tube inspections, there was reference to a discussion concerning recent findings at Catawba Nuclear Station, Unit 2 (Catawba 2). The reference was made concerning inspections adjacent to tie rods and tubes surrounding all new and previously identified loose parts. Please confirm that Catawba 2 is the correct reference. If it is, please discuss the specific operating experience that is relevant to San Onofre, Unit 2. If Catawba 2 is not the correct reference, please provide the correct reference, if any.

March 2006 San Onofre Nuclear Generating Station Units 2 and 3 cc:

Mr. Daniel P. Breig Southern California Edison Company San Onofre Nuclear Generating Station P. O. Box 128 San Clemente, CA 92674-0128 Mr. Douglas K. Porter, Esquire Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 Mr. David Spath, Chief Division of Drinking Water and Environmental Management P. O. Box 942732 Sacramento, CA 94234-7320 Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, CA 92101 Mark L. Parsons Deputy City Attorney City of Riverside 3900 Main Street Riverside, CA 92522 Mr. Gary L. Nolff Assistant Director - Resources City of Riverside 3900 Main Street Riverside, CA 92522 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Mr. Michael R. Olson San Diego Gas & Electric Company 8315 Century Park Ct. CP21G San Diego, CA 92123-1548 Director, Radiologic Health Branch State Department of Health Services P.O. Box 997414, MS 7610 Sacramento, CA 95899-7414 Resident Inspector/San Onofre NPS c/o U.S. Nuclear Regulatory Commission Post Office Box 4329 San Clemente, CA 92674 Mayor City of San Clemente 100 Avenida Presidio San Clemente, CA 92672 Mr. James T. Reilly Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Mr. James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)

Sacramento, CA 95814 Mr. Ray Waldo, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92764-0128 Mr. Brian Katz Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92764-0128

March 2006 San Onofre Nuclear Generating Station Units 2 and 3 cc:

Mr. Steve Hsu Department of Health Services Radiologic Health Branch MS 7610, P.O. Box 997414 Sacramento, CA 95899 Mr. A. Edward Scherer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128