Midcycle Performance Review and Inspection Plan - Fort Calhoun Station
ML062430656
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/31/2006
From: Graves D
NRC/RGN-IV/DRP/RPB-E
To: Ridenoure R
Omaha Public Power District
References
Download: ML062430656 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION R E G I O N IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 August 31,2006 R. T. Ridenoure Vice President Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550 Fort Calhoun, NE 68023-0550

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

FORT CALHOUN STATION

Dear Mr. Ridenoure:

On August 9, 2006, the NRC staff completed its performance review of the Fort Calhoun Station for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIS) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIS indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. In addition, we also plan on conducting several other inspections which include Temporary Instructions; Inspection Procedure 50001 , Steam Generator Replacement Inspections; Inspection Procedure 50003, Pressurizer Replacement Inspection; and Inspection Procedure 71007, Reactor Vessel Head Replacement Inspection.

The enclosed inspection plan details the inspections, including those listed above, except those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to minimize the resource impact on your staff and to allow for the early resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last 9 months of the inspection plan are tentative and may be revised at the annual performance assessment review meeting.

Omaha Public Power District In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.aov/readina-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8147 with any questions you may have regarding this letter or the inspection plan.

SincereIy ,

David N. Graves, Chief Project Branch E Division of Reactor Projects Docket: 50-285 License: DPR-40

Enclosure:

Fort Calhoun Station Inspection/Activity Plan cc w/enclosure:

Joe I. McManis, Manager - Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550 Fort Calhoun, NE 68023-0550 David J. Bannister Manager - Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 James R. Curtiss Winston & Strawn 1700 K Street NW Washington, DC 20006-3817 Chairman Washington County Board of Supervisors P.O. Box466 Blair, NE 68008

Omaha Public Power District Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services Dept. of Regulation & Licensing Division of Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319 Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway S E I Suite 100 Atlanta, GA 30339 Chief, Radiological Emergency Preparedness Section Kansas City Field Office Chemical and Nuclear Preparedness and Protection Division Dept. of Homeland Security 9221 Ward Parkway Suite 300 Kansas City, MO 641 14-3372

Omaha Public Power District Electronic distribution by RIV:

Regional Administrator (BSMI)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJCI)

Senior Resident Inspector (JDHI)

Resident Inspector (LMWI)

Branch Chief, DRP/E (DNG)

Senior Project Engineer, DRP/E (VGG)

Team Leader, DRPlTSS (RLNI)

RlTS Coordinator (KEG)

V. Dricks, P A 0 (VLD)

W. Maier, RSLO (WAM)

C. Gordon (CJG)

DRS Branch Chiefs (JAC, ATG, LJS, MPSI)

B. Wetzel, Chief, TRPS, OED0 (BAW)

S. Richards, Deputy Director, DIRS, NRR (SAR)

C. Holden, Deputy Director, DORL, NRR (CFH)

C. Haney, Director, DORL, NRR (CXH)

D. Terao, Chief, LPLG, DORL, NRR (DXT)

A. Wang, NRR Project Manager for FCS (ABW)

SUNS1 Review Completed: -DNG- ADAMS: J Yes 0 No Initials: -DNG Publicly Available Non-Publicly Available 0 Sensitive J Non-Sensitive J

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

N 9

0 0

N

-am C oo 0

0 c! II

-? K s

0 w

z w

I (0

0 0

c!

r

?

r-0 m

c-

mC m C m m m m C C C

.e .o c -

.e .e c c

.P

- .-0 c

0 0 0 0 0 0 am a al a, a,al a, a a a a ffl m m m m C C m C C C -

.-2! .E -a,C Ta I Em $

$ 2 m b

0 b

0 b

0 b

0 b

0 m

0 0 0 0

0 0 0 N N N GiGiGi 2 2 2

- 2 s

7 7 - T -

Z Z S 0 0 0 2

0 0 s 0 b b 0 0 rn 0

0 0 0 N N 2 s N -

s s 2 T-0 0 O LL z

P

+

0 W

n u) z I

a W

I-crn I I