MONTHYEARML0527804502005-09-22022 September 2005 Proposed Alternative to the American Society of Mechanical Engineers Code, Section XI Weld Inspection Requirements Project stage: Request ML0600902952005-12-28028 December 2005 Commitment Due Date Extension Project stage: Request ML0608204212006-03-23023 March 2006 E-mail Confirmation of Temporary Verbal Reliefs Project stage: Other ML0608205132006-05-31031 May 2006 Relief Request ISIR-19 Regarding Class 1 and 2 Piping Weld Inspection Requirements Project stage: Other ML0622202302006-07-28028 July 2006 Risk-Informed Inservice Inspection Program Commitment Due Date Extension Project stage: Other ML0634200332006-12-29029 December 2006 Correction of Safety Evaluation Associated with Authorization of an Alternative Project stage: Approval 2006-12-29
[Table View] |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] |
Text
Indiana Michigan Power INDIANA Cook Nuclear Plant One Cook Place MICHIGAN Bridgman, Ml 49106 POWER" AEP.com A unitof American Electric Power July 28, 2006 AEP:NRC:6055-13 10 CFR 50.55a Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-Pl-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 RISK-INFORMED INSERVICE INSPECTION PROGRAM COMMITMENT DUE DATE EXTENSION (TAC Nos. MC8569 and MC8570)
References:
- 1. Letter from Daniel P. Fadel, Indiana Michigan Power Company (I&M), to U. S.
Nuclear Regulatory Commission (NRC) Document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2, Proposed Alternative to the American Society of Mechanical Engineers Code Section XI Weld Inspection Requirements," AEP:NRC:5055-10, Accession Number ML052780450, dated September 22, 2005.
- 2. Letter from Daniel P. Fadel, I&M, to NRC Document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2, Commitment Due Date Extension, AEP:NRC:5055-15, Accession Number ML060090295, dated December 28, 2005.
- 3. Letter from L. Raghavan, NRC, to Mano K. Nazar, I&M, "Donald C. Cook Nuclear Plant, Units 1 and 2 (DCCNP-1 and DCCNP-2) - Relief Request ISIR-19 Regarding Class 1 and 2 Piping Weld Inspection Requirements (TAC Nos.
MC8569 and MC8570)," Accession Number ML060820513, dated May 31, 2006.
In Reference 1, Indiana Michigan Power Company (I&M) proposed an alternative to the American Society of Mechanical Engineers Code,Section XI (ASME Code) requirements for the minimum number of Class 1 and 2 piping welds to be examined during the next Unit 1 and Unit 2 refueling outages. The proposal was requested because of I&M's intention to adopt a risk-informed inservice inspection (RI-ISI) program during the current third ten-year inservice inspection interval. The RI-ISI program, when implemented, would reduce the number of welds requiring examination.
I&M committed to submit the RI-ISI program by December 31, 2005.
0q~f
U. S. Nuclear Regulatory Commission AEP:NRC:6055-13 Page 2 In Reference 2, I&M revised its commitment to submit the RI-ISI program from December 31, 2005, to July 31, 2006. As noted in the Reference 2 revision, I&M's RI-ISI program is to be based on Code Case N-716, and the Grand Gulf Nuclear Station is the pilot plant for a Code Case N-716 based RI-ISI program. The Grand Gulf program is presently scheduled to be submitted by July 31, 2006. Therefore, I&M is revising its commitment date.
The attachment to this letter provides I&M's revised commitment.
In addition to informing the NRC of the commitment date extension, I&M is requesting clarification of a statement contained in the letter approving I&M's proposed alternative, Reference 3. Page 5 of the Safety Evaluation Report contains the following statement:
"If the NRC [U. S. Nuclear Regulatory Commission] staff does not approve the DCCNP-1 and DCCNP-2 RI-ISI program by 6 months prior to the first outage of the third period, the licensee will be required to complete the remaining ASME Code-required piping examinations during the third period at each unit."
I&M understands that if the RI-ISI program is not approved by the NRC, additional ASME Code-required weld examinations will have to be performed by the end of the third ten-year inspection interval. However, the above statement implies that if the RI-ISI program is approved less than six months prior to the first outage of the third period, I&M would still be required to perform the remaining ASME Code-required piping examinations. Based on a July 20, 2006, telephone conversation with NRC personnel, it is I&M's understanding that the statement should read:
"If the NRC staff does not approve the DCCNP-1 and DCCNP-2 RI-ISI program, the licensee will be required to complete the remaining ASME Code required piping examinations during the third period at each unit."
I&M requests clarification of this issue prior to March 1, 2007, as this date is approximately six months prior to the first outage of the third period.
Should you have any questions, please contact Ms. Susan D. Simpson, Regulatory Affairs Manager, at (269) 466-2428.
Sincerely, Services Vice President RV/rdw
Attachment:
Regulatory Commitment
U. S. Nuclear Regulatory Commission AEP:NRC:6055-13 Page 3 c: R. Aben - Department of Labor and Economic Growth J. L. Caldwell - NRC Region III K. D. Curry - AEP Ft. Wayne, w/o attachment J. T. King - MPSC, w/o attachment MDEQ - WHMD/RPMWS, w/o attachment NRC Resident Inspector P. S. Tam - NRC Washington DC
Attachment to AEP:NRC:6055-13 Regulatory Commitment The following table identifies those actions committed to by Indiana Michigan Power Company (I&M) in this document. Any other actions discussed in this submittal represent intended or planned actions by I&M. They are described to the Nuclear Regulatory Commission (NRC) for the NRC's information and are not regulatory commitments.
Commitment Date I&M will develop and submit a risk-informed inservice September 30, 2006 inspection program for NRC approval.