(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No 230 which are attached hereto, are hereby incorporated into this renewed operating license. Duke Power Company LLC shall operate the facility in accordance with the Technical Specifications.
(3)
Updated Final Safety Analysis Report The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21 (d), as revised on December 16, 2002, describes certain future activities to be completed before the period of extended operation. Duke shall complete these activities no later than December 6, 2024, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
The Updated Final Safety Analysis Report supplement as revised on December 16, 2002, described above, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71 (e)(4), following issuance of this renewed operating license. Until that update is complete, Duke may make changes to the programs described in such supplement without prior Commission approval, provided that Duke evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
(4)
Antitrust Conditions Duke Power Company LLC shall comply with the antitrust conditions delineated in Appendix C to this renewed operating license.
(5)
Fire Protection Pro'ram (Section 9.5.1, SER, SSER #2, SSER #3, SSER #4, SSER#5)*
Duke Power Company LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report, as amended, for the facility and as approved in the SER through Supplement 5, subject to the following provision:
The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
- The parenthetical notation following the title of this renewed operating license condition denotes the section of the Safety Evaluation Report and/or its supplement wherein this renewed license condition is discussed.
Renewed License No. NPF-35 Amendment No. 230 (6) Additional Conditions The Additional Conditions contained in Appendix B, as revised through Amendment No. 180, are hereby incorporated into this renewed operating license. Duke Power Company LLC shall operate the facility in accordance with the Additional Conditions.
D.
The facility requires exemptions from certain requirements of Appendix J to 10 CFR Part 50, as delineated below and pursuant to evaluations contained in the referenced SER and SSERs. These include, (a) partial exemption from the requirement of paragraph IIi.D.2(b)(ii) of Appendix J, the testing of containment aidocks at times when the containment integrity is not required (Section 6.2.6 of the SER, and SSERs
- 3 and #4), (b) exemption from the requirement of paragraph IIl.A.(d) of Appendix J, insofar as it requires the venting and draining of lines for type A tests (Section 6.2.6 of SSER #3), and (c) partial exemption from the requirements of paragraph III.B of Appendix J, as it relates to bellows testing (Section 6.2.6 of the SER and SSER #3).
These exemptions are authorized by law, will not present an undue risk to the public health and safety, are consistent with the common defense and security, and are consistent with certain special circumstances as discussed in the referenced SER and SSERs. These exemptions are, therefore, hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E.
Physical Protection Duke Power Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains safeguards information protected under 10 CFR 73.21, is entitled: "Duke Energy Physical Security Plan* submitted by letter dated September 8, 2004, and supplemented on September 30, 2004, October 15, 2004, October 21, 2004 and October 27, 2004.
F.
Reportinagtothe Commission Deleted by Amendment No. 230 Renewed License No. NPF-35 Amendment No. 230 (2)
Technical Specifications The Technical Snecifications contained in Appendix A, as revised through Amendment No 226 which are attached hereto, are hereby incorporated into this renewed operating license. Duke Power Company LLC shall operate the facility in accordance with the Technical Specifications.
(3)
Updated Final Safety Analysis Report The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on December 16, 2002, describes certain future activities to be completed before the period of extended operation. Duke shall complete these activities no later than February 24, 2026, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
The Updated Final Safety Analysis Report supplement as revised on December 16, 2002, described above, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71 (e)(4), following issuance of this renewed operating license. Until that update is complete, Duke may make changes to the programs described in such supplement without prior Commission approval, provided that Duke evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
(4)
Antitrust Conditions Duke Power Company LLC shall comply with the antitrust conditions delineated
'in Appendix C to this renewed operating license.
(5)
Fire Protection Program (Section 9.5.1, SER, SSER #2, SSER #3, SSER #4, SSER #5)*
Duke Power Company LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report, as amended, for the facility and as approved in the SER through Supplement 5, subject to the following provision:
The licensee may make changes to the approved fire protection program without pdor approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
- The parenthetical notation following the title of this renewed operating license condition denotes the section of the Safety Evaluation Report and/or its supplements wherein this renewed license condition is discussed.
Renewed License No. NPF-52 Amendment No. 226 (6)
Additional Conditions The Additional Conditions contained in Appendix B, as revised through Amendment No. 224, are hereby incorporated into this renewed operating license. Duke Power Company LLC shall operate the facility in accordance with the Additional Conditions.
D.
The facility requires exemptions from certain requirements of Appendix J to 10 CFR Part 50, as delineated below, and pursuant to evaluations contained in the referenced SER and SSER. These include: (a) partial exemption from the requirement of paragraph IIl.D.2(b)(ii) of Appendix J, the testing of containment airlocks at times when the containment integrity is not required (Section 6.2.6 of SSER #5), (b) exemption from the requirement of paragraph III.A. 1(d) of Appendix J, insofar as it requires the venting and draining of lines for type A tests (Section 6.2.6 of SSER #5), and (c) partial exemption from the requirements of paragraph III.B of Appendix J, as it relates to bellows testing (Section 6.2.6 of the SER and SSER #5). These exemptions are authorized by law, will not present an undue risk to the public health and safety, are consistent with the common defense and security, and are consistent with certain special circumstances, as discussed in the referenced SER and SSER. These exemptions are, therefore, hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E.
Physical Protection Duke Power Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains safeguards information protected under 10 CFR 73.21, is entitled: "Duke Energy Physical Security Plan" submitted by letter dated September 8, 2004, and supplemented on September 30, 2004, October 15, 2004, October 21, 2004 and October 27, 2004.
F.
Reporting to the Commission Deleted by Amendment No. 226 G.
The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
Renewed License No. NPF-52 Amendment No. 226