August 2, 2006 Mr. Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467
SUBJECT:
PRE-APPLICATION ACTIVITIES REGARDING LICENSE RENEWAL APPLICATION REVIEW SCHEDULE FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (TAC NOS. MD0547 AND MD0548)
Dear Mr. McKinney:
During a public meeting held on April 5, 2006, the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of PPL Susquehanna, LLC (or PPL), discussed the approach and schedule for submitting an application for license renewal (LR) in conjunction with a request for a 14 percent extended power uprate (EPU) for Susquehanna Steam Electric Station, Units 1 and 2. The meeting summary can be accessed in the Agencywide Documents Access and Management System, under (Accession No. ML061720220).
PPL indicated that they would be filing an application for the EPU this year, and that the information demonstrating that the license renewal evaluations bound the uprated conditions, would also be submitted at the time of the staffs approval of the EPU. The LR review would need to consider changes in the current licensing basis (CLB) made as a result of approval of the EPU, and changes in the scope of aging management resulting from the EPU bounding condition. Certain portions of the LR review that are not impacted by the EPU review may be conducted upon successful docketing and acceptance review of the application. Upon approval of the EPU license amendment request, PPL will need to submit an amended LRA at the new power level. Upon receipt of this amended application, NRC staff will establish the review schedule of 22-month without a hearing or 30-month with a hearing requested and granted.
This letter was discussed with your staff in a teleconference held on July 26, 2006.
Sincerely,
/RA/
Yoira Diaz Sanabria, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388 cc w/encl: See next page
August 2, 2006 Mr. Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467
SUBJECT:
PRE-APPLICATION ACTIVITIES REGARDING LICENSE RENEWAL APPLICATION REVIEW SCHEDULE FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (TAC NOS. MD0547 AND MD0548)
Dear Mr. McKinney:
During a public meeting held on April 5, 2006, the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of PPL Susquehanna, LLC (or PPL), discussed the approach and schedule for submitting an application for license renewal (LR) in conjunction with a request for a 14 percent extended power uprate (EPU) for Susquehanna Steam Electric Station, Units 1 and 2. The meeting summary can be accessed in the Agencywide Documents Access and Management System, under (Accession No. ML061720220).
PPL indicated that they would be filing an application for the EPU this year, and that the information demonstrating that the license renewal evaluations bound the uprated conditions, would also be submitted at the time of the staffs approval of the EPU. The LR review would need to consider changes in the current licensing basis (CLB) made as a result of approval of the EPU, and changes in the scope of aging management resulting from the EPU bounding condition. Certain portions of the LR review that are not impacted by the EPU review may be conducted upon successful docketing and acceptance review of the application. Upon approval of the EPU license amendment request, PPL will need to submit an amended LRA at the new power level. Upon receipt of this amended application, NRC staff will establish the review schedule of 22-month without a hearing or 30-month with a hearing requested and granted.
This letter was discussed with your staff in a teleconference held on July 26, 2006.
Sincerely,
/RA/
Yoira Diaz Sanabria, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388 cc w/encl: See next page DISTRIBUTION: See next page Accession Number: ML062140549 OFFICE PM:DLR:RLRA LA:DLR OGC BC:DLR:RLRA D:DLR NAME YDiazSanabria Y. Edwards ghawkins for jem LLund Fgillespie (ptk for)
DATE 8/ 2 /06 8/ 2 /06 8/ 2 /06 8/ 1 /06 8/ 1 /06 OFFICIAL RECORD COPY
Letter to Britt McKinney from Frank Gillespie dated August 2, 2006
SUBJECT:
PRE-APPLICATION ACTIVITIES REGARDING LICENSE RENEWAL APPLICATION REVIEW SCHEDULE FOR SUSQUEHANNA UNITS 1 AND 2 (TAC NOS. MD0547 AND MD0548)
HARD COPY DLR R/F E-MAIL:
JFair RWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)
SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes RGuzman BRogers
Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:
Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Aloysius J. Wrape, III General Manager - Performance Improvement and Oversight PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 1 8101-1179 Terry L. Harpster General Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Rocco R. Sgarro Manager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Walter E. Morrissey Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Michael H. Crowthers Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Steven M. Cook Manager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Luis A. Ramos Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467 Bryan A. Snapp, Esq Assoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA 18101-1179 Supervisor - Document Control Services PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Richard W. Osborne Allegheny Electric Cooperative, Inc.
212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266 Director, Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035
Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:
Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803