ML062120394

From kanterella
Jump to navigation Jump to search
GG-08-2005 - Final - JPM Outlines
ML062120394
Person / Time
Site: Grand Gulf 
(NPF-029)
Issue date: 04/12/2005
From:
Operations Branch IV
To:
References
Download: ML062120394 (5)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility:

Grand Gulf Nuclear Station Date of Examination:

16 August 2005 Examination Level (circle one) RO / SRO Operating Test Number:

Administrative Topic (see Note)

Type Code*

Describe activity to be performed Conduct of Operations D; S Given plant conditions, perform the Idle Loop Startup Surveillance for Recirculation System.

GJPM-RO-ADM-1 K/A 2.1.20: 4.3 Safety Function 1 Conduct of Operations M; S Given plant conditions, complete documentation for Shift Turnover GJPM-RO-ADM-2 K/A 2.1.3: 3.0 Equipment Control M

Given a component to be isolated for a work order, prepare a tagout using the eSOMS program.

GJPM-RO-ADM-3 K/A 2.2.13: 3.6 Radiation Control D

Complete entry and egress from the CAA with access requirements for a High Radiation Area.

GJPM-OPS-ADM-26 K/A 2.3.1: 2.6; 2.3.4: 2.5; 2.3.5: 2.3 Emergency Plan N/A N/A NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol Room (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes (N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

(S)imulator Revision 0 4/12/2005

ES-301 Administrative Topics Outline Form ES-301-1 Facility:

Grand Gulf Nuclear Station Date of Examination:

16 August 2005 Examination Level (circle one) RO / SRO Operating Test Number:

Administrative Topic (see Note)

Type Code*

Describe activity to be performed Conduct of Operations M

Given a completed AC/DC Lineup following a failure of a Diesel Generator, determine the LCO action requirements and generate an eSOMS LCO.

GJPM-SRO-ADM-1 K/A 2.1.12: 4.0 Safety Function 6 Conduct of Operations M

Given a failed relay, determine the impact on plant operations using facility drawings.

GJPM-SRO-ADM-2 K/A 2.1.24: 3.1 Equipment Control M

Given a work order and prepared tagout, determine the adequacy of the tagout and the impact on plant operations.

GJPM-SRO-ADM-3 K/A 2.2.13: 3.8; 2.2.17: 3.5 Radiation Control N

Given plant conditions, determine Protective Action Recommendations and Radiological Considerations for On-Site Personnel.

GJPM-SRO-A&E-41 K/A 2.3.8: 3.2 Emergency Plan M

Given plant conditions, determine entry into the Site Emergency Plan and complete the initial notification forms.

GJPM-SRO-A&E-42 K/A 2.4.41: 4.1; 2.4.38: 4.0; 2.4.40: 4.0 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C) ontrol Room (D) irect from bank ( 3 for ROs; 4 for SROs & RO retakes (N) ew or (M) odified from bank ( 1)

(P) revious 2 exams ( 1; randomly selected)

(S) imulator Revision 0 4/12/2005

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:

Grand Gulf Nuclear Station Date of Examination:

15 August 2005 Exam Level (circle one) RO / SRO-I / SRO-U Operating Test Number:

Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. 202001 Recirculation System - Startup idle Recirculation Pump

<30% power with incomplete start actuation.

S; M; A 4

b. 201001 Control Rod Drive Hydraulic System - Rotate operating CRD pumps, trip of newly operating pump.

S; M; A 1

c. 259001 Reactor Feed Water System - Startup Second Reactor Feed Pump and place on Master level control, with failure of Automatic controller.

S; N; A 2

d. 226001 RHR Containment Spray - Secure Containment Sprays and align for injection to RPV with failure of one RHR injection valve.

S; N; A 5

ESF

e. 264000 Emergency Diesel Generators - Start, parallel, and load the Diesel Generator with trip of SSW.

S; D; A 6

ESF

f. 290003 Control Room HVAC System - Secure Control Room Standby Fresh Air System.

C; D 9

ESF

g. 239001 Main & Reheat Steam System - Open Main Steam Isolation Valves.

S; D; L 3

ESF

h. 201005 Rod Control & Information System - Operate RCIS to bring the reactor critical.

S; D; L 7

In-Plant Systems@ (3 for RO; 3 for SRO-I; 3or2 for SRO-U)

i. 295003 Partial Loss of AC - Reset undervoltage lockouts on buses when power is restored, with one lockout failing to reset.

R; M; E; A

6

j. 286000 Fire Protection System - Manually initiate fire suppression for the Standby Gas Filter Train with the train operating.

R; N; E 8

k. 295016 Control Room Abandonment - Startup RHR in Suppression Pool Cooling.

N; E; L 7

ESF

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol Room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1 Revision 0 4/12/2005

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:

Grand Gulf Nuclear Station Date of Examination:

15 August 2005 Exam Level (circle one) RO / SRO-I / SRO-U Operating Test Number:

Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. 202001 Recirculation System - Startup idle Recirculation Pump

<30% power with incomplete start actuation.

S; M; A 4

b. 201001 Control Rod Drive Hydraulic System - Rotate operating CRD pumps, trip of newly operating pump.

S; M; A 1

c. 259001 Reactor Feed Water System - Startup Second Reactor Feed Pump and place on Master level control, with failure of Automatic controller.

S; N; A 2

d. 226001 RHR Containment Spray - Secure Containment Sprays and align for injection to RPV with failure of one RHR injection valve.

S; N; A 5

ESF

e. 264000 Emergency Diesel Generators - Start, parallel, and load the Diesel Generator with trip of SSW.

S; D; A 6

ESF

f. 290003 Control Room HVAC System - Secure Control Room Standby Fresh Air System.

C; D 9

ESF

g. 239001 Main & Reheat Steam System - Open Main Steam Isolation Valves.

S; D; L 3

ESF

h. N/A In-Plant Systems@ (3 for RO; 3 for SRO-I; 3or2 for SRO-U)
i. 295003 Partial Loss of AC - Reset undervoltage lockouts on buses when power is restored, with one lockout failing to reset.

R; M; E; A

6

j. 286000 Fire Protection System - Manually initiate fire suppression for the Standby Gas Filter Train with the train operating.

R; N; E 8

k. 295016 Control Room Abandonment - Startup RHR in Suppression Pool Cooling.

N; E; L 7

ESF

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol Room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1 Revision 0 4/12/2005

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:

Grand Gulf Nuclear Station Date of Examination:

15 August 2005 Exam Level (circle one) RO / SRO-I / SRO-U Operating Test Number:

Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. 202001 Recirculation System - Startup idle Recirculation Pump

<30% power with incomplete start actuation.

S; M; A 4

b. 201001 Control Rod Drive Hydraulic System - Rotate operating CRD pumps, trip of newly operating pump.

S; M; A 1

c. N/A
d. N/A
e. N/A
f. 290003 Control Room HVAC System - Secure Control Room Standby Fresh Air System.

C; D 9

ESF

g. N/A
h. N/A In-Plant Systems@ (3 for RO; 3 for SRO-I; 3or2 for SRO-U)
i. N/A
j. 286000 Fire Protection System - Manually initiate fire suppression for the Standby Gas Filter Train with the train operating.

R; N; E 8

k. 295016 Control Room Abandonment - Startup RHR in Suppression Pool Cooling.

N; E; L 7

ESF

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol Room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1 Revision 0 4/12/2005