Letter Sequence Meeting |
---|
|
|
MONTHYEARML0417001272004-06-17017 June 2004 Draft Request for Additional Information Regarding In-Service Testing Program Relief Request PR-03 Project stage: Draft RAI ML0501802412005-03-29029 March 2005 Summary of December 8, 2004, Category 1 Meeting with Entergy Nuclear Operations, on High-Pressure Coolant Injection (HPCI) Pump In-Service Testing Vibration Project stage: Meeting ML0515302242005-05-24024 May 2005 Response to NRC Request for Additional Information Related to Pilgrim In-service Testing (IST) Relief Request PR-03 Project stage: Response to RAI ML0519902762005-08-29029 August 2005 Entergy Relief Request PR-03 High-Pressure Coolant Injection Pump Project stage: Other ML0618704922006-06-29029 June 2006 Fourth Ten-Year In-Service Testing (IST) Program, IST Relief Request PR-03, Rev. 3 Project stage: Request 2005-05-24
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML21257A3822021-09-15015 September 2021 Summary of Clarification Cal with Holtec Decommissioning International, Llc. Regarding Second Follow-On Emergency Preparedness Request for Additional Information ML21238A2752021-08-26026 August 2021 Clarification Call Regarding RAI License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Plan ML21075A3152021-03-17017 March 2021 March 11,2021 Pilgrim Request for Additional Information Response Clarifiction Meeting - Proposed Physical Security Plan ML21035A2312021-02-18018 February 2021 Physical Security Plan - RAI Clarification Meeting ML21035A1712021-02-18018 February 2021 Physical Security Plan - ISFSI Only Meeting Summary ML20045D1082020-02-19019 February 2020 January 31, 2020 Meeting Summary Pre-Amendment Meeting Proposed Changes to Pilgrim ISFSI Physical Security Plan ML19274B6662019-11-13013 November 2019 Summary of Public Meeting Near the Pilgrim Nuclear Power Station Regarding the Establishment and Operation of Community Advisory Boards ML19121A2172019-04-30030 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Meeting Summary ML19017A1732019-01-30030 January 2019 Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate ML18275A3952018-10-12012 October 2018 9/25/2018 Summary of Pre-submittal Meeting with Entergy Nuclear and Holtec International to Discuss Potential License Transfer Application for Pilgrim Nuclear Power Plant ML18130A1592018-05-0909 May 2018 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML17173A7672017-07-28028 July 2017 Summary of 6/20/2017 Meeting with Entergy to Discuss Plan for Decommissioning Licensing Actions of Palisades, Pilgrim, Indian Point, Units 2 and 3, and Vermont Yankee ML17101A3992017-04-13013 April 2017 Statement of Congressman Keating - NRC Annual Assessment Meeting for PNPS - March 21, 2017 ML17103A4132017-04-13013 April 2017 3/21/2017 - Annual Assessment/95003 Inspection Exit Summary Meeting for Pilgrim Nuclear Power Station ML17059C9192017-02-28028 February 2017 1/31/2017 - Summary of Category 3 Public Meeting - Preliminary Findings and Status of 95003 Inspection at Pilgrim ML16116A0052016-04-22022 April 2016 4/13/2016 - Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station ML15306A0122015-11-0505 November 2015 Summary of October 20, 2015, Teleconference with Entergy Nuclear Operations to Discuss Proposed Changes to Emergency Response Organization Training for Pilgrim Nuclear Power Station ML15092A7932015-04-0202 April 2015 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 3/18/15 ML14136A3502014-05-14014 May 2014 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides) ML14086A2912014-04-22022 April 2014 Summary of Telephone Conference Regarding the Verbal Authorization of Relief Request PRR-25, Revision 1 ML13109A4362013-04-19019 April 2013 4/2/2013 - Pilgrim - Annual Assessment Meeting Summary ML12101A3742012-04-10010 April 2012 Summary of Meeting with Pilgrim Nuclear Power Station 2011 Annual Assessment ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML1118105332011-06-30030 June 2011 Summary of Annual Assessment Public Meeting with Entergy Nuclear Operation, Inc ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML1110401712011-04-27027 April 2011 04/5/2011 Summary of Preapplication Meeting with Entergy Operations, Inc. to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1108206892011-04-19019 April 2011 February 24, 2011, Summary of Telephone Conference Call Held Between NRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1109700342011-04-19019 April 2011 Summary of Tele Conf Call Held on 4/6/11, Between the USNRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1108202082011-04-11011 April 2011 Summary of Telephone Conference Call Held on March 23, 2011, Between the USNRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1100404192011-02-15015 February 2011 Summary of Telephone Conference Call Held on December 6, 2010, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operating, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application (Tac No. MC9669) ML1034105062011-01-0707 January 2011 December 1, 2010, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1025900772010-10-15015 October 2010 Summary of Telephone Conference Call Held on 6/2/10 Btw the USNRC and Entergy Nuclear Operations, Inc. Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1025900862010-10-15015 October 2010 5/25/10 Summary of Telephone Conference Call Held Between USNRC and Entergy Nuclear Operations, Inc. Concerning the Annual Update Associated with the Pilgrim Nuclear Power Station License Renewal Application ML1012603632010-05-0606 May 2010 Summary of Annual Assessment Open House Public Meeting Discussed Nrc'S Assessment of Safety Performance of Pilgrim for Cy 2009 ML1011100082010-04-21021 April 2010 Summary of Public Meeting to Discuss the Results of Entergy Nuclear Plant Safety Culture Workplace Survey ML0909702992009-04-13013 April 2009 Annual Assessment Meeting Summary, Slides, Sign-in Sheet, Misc Documents, for 3/26/09 Meeting ML0809202432008-04-0101 April 2008 Summary of March 28, 2008, Annual Assessment Meeting with Entergy Nuclear Operations, Inc ML0724302642007-09-0707 September 2007 08/30/2007 Summary of Telephone Conference Call Between the U.S. NRC and Entergy Nuclear Operations, Inc., to Discuss and Clarify Commitment No. 47 Pertaining to the Pilgrim Nuclear Power Station License Renewal Application ML0713701422007-05-18018 May 2007 Summary of Annual Assessment Meeting with Entergy Nuclear Operations, Inc., Regarding the Nrc'S Assessment of the Safety Performance of Pilgrim Nuclear for the Calendar Year 2006 ML0710300932007-05-0101 May 2007 03/14-15/2007 Summary of Conference Calls with Entergy Nuclear Operations Inc., Pilgrim License Renewal Application, Pilgrim Request for Additional Information B.1.16.1, and Neutron Fluence ML0710300532007-04-27027 April 2007 Summary of Conference Calls on April 2, 2007, with Entergy Nuclear Operations, Inc., Regarding the Pilgrim License Renewal Application ML0710300482007-03-19019 March 2007 E-mail: (PD) Meeting Summary - March 14 & 15 2007 - from Perry Buckberg to Doug Ellis 3/19/07 7:05am ML0706005672007-03-15015 March 2007 Summary of the License Renewal Telephone Conference Call and Meeting Held Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force ML0710302212007-03-0707 March 2007 E-MAIL: (PD) Updated - Week of 2/26 Conference Call Record from Perry Buckberg to Doug Ellis 3/7/07 6:36am ML0705402052007-03-0101 March 2007 01/24/2007 Summary of Meeting with Pilgrim on the Draft Supplemental Environmental Impact Statement Regarding Pilgrim License Renewal Review ML0635400102007-01-18018 January 2007 12/18/2006 Summary of Conference Call with Entergy Nucelar Operations, Inc., Regarding the Pilgrim License Renewal Application ML0634800532006-12-29029 December 2006 2006/12/29-Summary of Conference Call on December 12, 2006, with Entergy Nuclear Operations, Inc., Regarding Pilgrim Nuclear Power Station License Renewal 2021-09-15
[Table view] |
Text
March 29, 2005 LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC.
FACILITY: PILGRIM NUCLEAR POWER STATION
SUBJECT:
SUMMARY
OF DECEMBER 8, 2004, CATEGORY 1 MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC., RE: HIGH PRESSURE COOLANT INJECTION PUMP IN-SERVICE TESTING VIBRATION (TAC NO. MB8773)
On December 8, 2004 a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives from Entergy Nuclear Operations, Inc. (ENO or the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss questions related to a relief request for the Pilgrim Nuclear Power Station (PNPS). The proposed relief request would allow alternate testing to verify operational readiness of the high pressure coolant injection (HPCI) pump.
The licensee presented information on the history of issues related to the PNPS in-service testing vibration monitoring program for the HPCI pump. Additionally, details of HPCI system safety function, mission time, operational data and vibration history were explained. ENO also explained how the layout of the HPCI pump configuration is impacting the main and booster pumps' vibration levels.
The NRC staff queried the licensee about several issues prior to the meeting via a draft request for additional information (RAI) regarding ENOs submittal dated December 6, 2002, and supplements dated February 10, and June 2, 2004. The draft RAI and ENOs supplement are available in the Agencywide Documents Access and Management System (ADAMS) under accession numbers ML041700127 and ML041620392, respectively. The licensee addressed the RAI questions at the end of the presentation, and is expected to provide a formal response to these questions in March 2005.
Members of the public were in attendance. Public Meeting Feedback forms were not received.
A copy of the attendees list and the licensees slides presented at the meeting are enclosed.
Please direct any inquiries to John P. Boska, Senior Project Manager, Pilgrim at (301) 415-2901, or jpb1@nrc.gov.
Sincerely,
/RA/
John P. Boska, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosures:
- 1. List of Attendees
- 2. ENO Slides cc w/encls: See next page
Pilgrim Nuclear Power Station cc:
Resident Inspector U. S. Nuclear Regulatory Commission Mr. Steve Brennion Pilgrim Nuclear Power Station Supt., Regulatory & Industry Affairs Post Office Box 867 Entergy Nuclear Operations, Inc.
Plymouth, MA 02360 Pilgrim Nuclear Power Station 600 Rocky Hill Road, M/S 1 Chairman, Board of Selectmen Plymouth, MA 02360-5508 11 Lincoln Street Plymouth, MA 02360 Mr. Jack Alexander Manager, Reg. Relations and Chairman, Duxbury Board of Selectmen Quality Assurance Town Hall Pilgrim Nuclear Power Station 878 Tremont Street 600 Rocky Hill Road Duxbury, MA 02332 Plymouth, MA 02360-5599 Office of the Commissioner Mr. David F. Tarantino Massachusetts Department of Nuclear Information Manager Environmental Protection Pilgrim Nuclear Power Station One Winter Street 600 Rocky Hill Road Boston, MA 02108 Plymouth, MA 02360-5599 Office of the Attorney General Ms. Jane Perlov One Ashburton Place Secretary of Public Safety 20th Floor Executive Office of Public Safety Boston, MA 02108 One Ashburton Place Boston, MA 02108 Dr. Robert M. Hallisey, Director Radiation Control Program Mr. Stephen J. McGrail, Director Commonwealth of Massachusetts Attn: James Muckerheide Executive Offices of Health and Massachusetts Emergency Management Human Services Agency 174 Portland Street 400 Worcester Road Boston, MA 02114 Framingham, MA 01702-5399 Regional Administrator, Region I Chairman U. S. Nuclear Regulatory Commission Nuclear Matters Committee 475 Allendale Road Town Hall King of Prussia, PA 19406-1415 11 Lincoln Street Plymouth, MA 02360 Mr. John M. Fulton Assistant General Counsel Mr. William D. Meinert Entergy Nuclear Operations, Inc. Nuclear Engineer 440 Hamilton Avenue Massachusetts Municipal Wholesale White Plains, NY 10601 Electric Company P.O. Box 426 Ludlow, MA 01056-0426
Pilgrim Nuclear Power Station cc:
Mr. Gary J. Taylor Ms. Charlene D. Faison Chief Executive Officer Manager, Licensing Entergy Operations Entergy Nuclear Operations, Inc.
1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John T. Herron Mr. Michael J. Colomb Sr. VP and Chief Operating Officer Director of Oversight Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. Michael A. Balduzzi Senior Resident Inspector Site Vice President U.S. Nuclear Regulatory Commission Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station 600 Rocky Hill Road 600 Rocky Hill Road Mail Stop 66 Plymouth, MA 02360-5508 Plymouth, MA 02360-5508 Mr. Stephen J. Bethay Ms. Stacey Lousteau Director, Nuclear Assessment Treasury Department Entergy Nuclear Operations, Inc. Entergy Services, Inc.
Pilgrim Nuclear Power Station 639 Loyola Avenue 600 Rocky Hill Road New Orleans, LA 70113 Plymouth, MA 02360-5508 Jim Sniezek Mr. Bryan S. Ford 5486 Nithsdale Drive Manager, Licensing Salisbury, MD 21801 Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Mr. Kennety L. Graesser 600 Rocky Hill Road 38832 N. Ashley Drive Plymouth, MA 02360-5508 Lake Villa, IL 60046 Mr. Danny L. Pace Mr. Ronald Toole Vice President, Engineering 1282 Valley of Lakes Entergy Nuclear Operations, Inc. Box R-10 440 Hamilton Avenue Hazelton, PA 18202 White Plains, NY 10601 Ms. Deb Katz, Executive Director Mr. Brian OGrady Nuclear Security Coalition Vice President, Operations Support c/o Citizens Awareness Network Entergy Nuclear Operations, Inc. Box 83 440 Hamilton Avenue Shelburne Falls, MA 01370 White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
Please direct any inquiries to John P. Boska, Senior Project Manager, Pilgrim at (301) 415-2901, or jpb1@nrc.gov.
Sincerely,
/RA/
John P. Boska, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosures:
- 1. List of Attendees
- 2. ENO Slides cc w/encls: See next page DISTRIBUTION:
PUBLIC PDI Reading BSheron TMarsh/JLyons CHolden DRoberts RFretz JHuang DTerao GBedi SUnikewicz CRaynor WPoertner TOwusu GMatakas, RI OPA TMensah ACRS/ACNW OGC PMNS ADAMS Accession Number: ML050180241 OFFICE PDI-2/GE PDI-2/PM PDI-2/LA PDI-2/SC NAME TOwusu JBoska CRaynor DRoberts DATE 3/2/05 3/2/05 3/3/05 3/15/05 OFFICIAL RECORD COPY