MONTHYEARML24149A3122024-05-0707 May 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24149A2932024-05-0707 May 2024 Ile Form 2.3-1 Examination Outline Quality Checklist ML24149A3862024-04-19019 April 2024 Ile Form 2.1-1 Examination Preparation Checklist ML24149A3852024-04-19019 April 2024 Ile Form 1.3-1 Exam Security Agreement BW240018, Ile Post-Exam Submittal Letter2024-04-0505 April 2024 Ile Post-Exam Submittal Letter ML24149A3472024-03-14014 March 2024 Ile Proposed Exam Submittal Letter ML24149A3442024-03-14014 March 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24149A3452024-03-14014 March 2024 Ile Form 2.3-4 Written Exam Quality Checklist ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 ML24149A2562023-10-27027 October 2023 Ile Proposed Outline Submittal Letter ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1842022-04-0505 April 2022 Outline Recommendations-Submittal Comments ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist ML22199A1812022-04-0505 April 2022 Ile ES-401-9 Written Examination Review Worksheet ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist ML22199A1792022-04-0505 April 2022 Ile ES-401-4 Rejected KAs ML22199A1762022-04-0505 April 2022 Ile ES-301-7 Operating Test Review Worksheet BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1852022-03-18018 March 2022 Ile Administered RO and SRO Admin Topics JPMs-FINAL ML22199A1912022-03-18018 March 2022 Ile Administered RO and SRO List of Reference Handouts-FINAL ML22199A1902022-03-18018 March 2022 Ile Administered Written Examination-FINAL ML22199A1892022-03-18018 March 2022 Ile Administered Simulator Scenarios-FINAL ML22199A1872022-03-18018 March 2022 Ile Administered Sim and Inplant System JPMs-FINAL ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2632022-02-22022 February 2022 Ile ES-301-1 Admin Topics Outlines ML22199A2702022-02-22022 February 2022 Ile ES-401-2 and ES-401-3 Written Exam Outlines-Final ML22199A2692022-02-22022 February 2022 Ile ES-301-2 Sim and Inplant System JPM Outlines ML22199A2712022-02-22022 February 2022 Ile ES-D-1s Simulator Scenario Outlines ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML22199A2382022-02-18018 February 2022 Ile Proposed Sim and Inplant System JPMs-FINAL ML22199A2402022-02-18018 February 2022 Ile Proposed Written Examination-FINAL ML22199A2362022-02-18018 February 2022 Ile Proposed RO and SRO Admin Topic JPMs-FINAL ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML22199A2392022-02-18018 February 2022 Ile Proposed Simulator Scenarios-FINAL ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML21110A4952021-04-19019 April 2021 GFE Results, March 2021 ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final 2024-05-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24149A3122024-05-0707 May 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24149A2932024-05-0707 May 2024 Ile Form 2.3-1 Examination Outline Quality Checklist ML24149A3852024-04-19019 April 2024 Ile Form 1.3-1 Exam Security Agreement ML24149A3862024-04-19019 April 2024 Ile Form 2.1-1 Examination Preparation Checklist BW240018, Ile Post-Exam Submittal Letter2024-04-0505 April 2024 Ile Post-Exam Submittal Letter ML24149A3472024-03-14014 March 2024 Ile Proposed Exam Submittal Letter ML24149A3442024-03-14014 March 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24149A3452024-03-14014 March 2024 Ile Form 2.3-4 Written Exam Quality Checklist ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 ML24149A2562023-10-27027 October 2023 Ile Proposed Outline Submittal Letter ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1812022-04-0505 April 2022 Ile ES-401-9 Written Examination Review Worksheet ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist ML22199A1762022-04-0505 April 2022 Ile ES-301-7 Operating Test Review Worksheet ML22199A1792022-04-0505 April 2022 Ile ES-401-4 Rejected KAs ML22199A1842022-04-0505 April 2022 Outline Recommendations-Submittal Comments BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1912022-03-18018 March 2022 Ile Administered RO and SRO List of Reference Handouts-FINAL ML22199A1852022-03-18018 March 2022 Ile Administered RO and SRO Admin Topics JPMs-FINAL ML22199A1872022-03-18018 March 2022 Ile Administered Sim and Inplant System JPMs-FINAL ML22199A1892022-03-18018 March 2022 Ile Administered Simulator Scenarios-FINAL ML22199A1902022-03-18018 March 2022 Ile Administered Written Examination-FINAL ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2692022-02-22022 February 2022 Ile ES-301-2 Sim and Inplant System JPM Outlines ML22199A2702022-02-22022 February 2022 Ile ES-401-2 and ES-401-3 Written Exam Outlines-Final ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2632022-02-22022 February 2022 Ile ES-301-1 Admin Topics Outlines ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2712022-02-22022 February 2022 Ile ES-D-1s Simulator Scenario Outlines ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML22199A2392022-02-18018 February 2022 Ile Proposed Simulator Scenarios-FINAL ML22199A2402022-02-18018 February 2022 Ile Proposed Written Examination-FINAL ML22199A2362022-02-18018 February 2022 Ile Proposed RO and SRO Admin Topic JPMs-FINAL ML22199A2382022-02-18018 February 2022 Ile Proposed Sim and Inplant System JPMs-FINAL ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final BW200057, Bwd 2020 Ile Post-Exam Package Cover2020-06-27027 June 2020 Bwd 2020 Ile Post-Exam Package Cover ML22173A2432020-06-0909 June 2020 Bwd 2020 Ile Administered RO and SRO Admin JPMs-Final 2024-05-07
[Table view] |
Text
NRC COMMENTS TO THE PROPOSED WRITTEN EXAMINATION, ES-401-9 FOR THE BRAIDWOOD INITIAL EXAMINATION MAY 2006
ES-401 Written Examination Form ES-401-9 Rp&wMxksbWnrknhpPt Instructions
[Refer to Section 0 of ES-301 and Appendix B for additional information regarding each of the following concepts.]
- 1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
- 2. - - -
Enter the level of dimculty (LOD) of each question using a 1 5 (easy dimcult) rating scale (questions in the 2 4 range are acceptable)
- 3. Check the appropriate box if a psychometric flaw is identified:
The stem lacks Sumcient focus to elicit the correct answer (e.9.. unclear intent, more information is needed, or too much needless information).
The Stem or distractors contain cues (i.e.. clues, specific determiners. phrasing, length, etc).
The answer choices are a collection of unrelated truelfalse statements.
The distractors are not credible; single implausible distradors should be repaired, more than one is unacceptable.
One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
- 4. Check the aoorooriate box if a iob content error is identified:
Thk qbeslion ,s not linked to the ,OD requirements ( e the q.esl on has a valid KJA 0.1 as wrinen. 5 not operat Onal n content, Tne q.estion reqL res the recall of know edge tnat s too Specifc for tne c osed reference test moae 11 e ,l 1s not requ red 10 be ?mown from memory)
Tne o.es1 on contains data wtn an .nrea s1 c eve of accdacv of mons srent units l e 0 Dane meter tn Dercent with OJesl on In aa onsl The 4uestion requires feverre logic or application comparedtdthe job requirements.
- 5. Check questions that are sampled for conformance with the approved WA and those that are desiqnated SRO-only (WA and license level mismatches are unacceptable).
- 6. Based on the reviewer's judgment. is the question as written (U)nacceptable (requiring repair or replacement), in need of (E)ditbrial enhancement, or (S)atisfactory?
- 7. At a minimum. explain any 'V ratings (e.g., how the Appendix B psychometric attributes are not being met).
ES-401 Written Examination Form ES-401-9 R p V i p W t Explanation Bank.
New. Stem and distractors do not match. Stem asks for action, distractors provide action and reason for action. d. does not provide any reason for action. Suggest removing causes or revising stem and addina cause to distractor d. Stem and distractor d. mcdified.
S New.
I S New.
S S
New.
INew.
III1 U
S New Tnis Dewmes a matn problem witn tne reference providea Quesrron modified Strll a math problem but the operator must make choces basea on the malh results New.
I I
S IBank.
~~~ ~
II T
New. Question's answer has to be known from memory - no method of determining the correct answer unless memorized. Not higher skill.
tt S Distractor a. is not plausible. Question does have a thought process to am've at the correct answer. Since pressure can continue to rise under certain conditions. distractor a. is Dfausibfe. Question not modified.
S Bank
ES-401 Written Examination Form ES-401-9 m teR
- 3. Psvchometric Flaws 4. Job Content Flaws 7 I
Q= SRO Explanation WA Only X S New.
I S
S New.
Bank. I I I S
S E
New.
New.
]New. Chanae ODeratorS to ODerator's in the stem. Chanoe made.
~~
I 11 S New.
New. Distractor a. appears to not be gramatically wrrect ,or is missing E information. Reworked dislractor a. lo be accurate, put key words in another dislractor.
II I tl S New. Question is not discriminatory. LOO = 2, there are different power supplies a1 different power levels, making lhis more lhan simple memory However, question modified lo lest lhe non-nomalmwer lineup.
New. Question is not discriminatory Question is discriminatory, tt E however, dislraclor a. was not plausible and was changed.
I S New.
S S
New.
New. I S
S S
New.
New.
New.
IU
ES-401 Written Examination Form ES-401-9 PPt
ES-401 Written Examination Form ES-401-9 rn R p V l p W t
+
3 Psychometric Flaws Dist.
I 4 Jobcontent Flaws I 5 Other I/E/S Explanation S INew. II S New.
S Bank.
S S
S New.
New.
INew.
I II
~~
New. Question is not discriminatory. This material is required to be tf S known by licensed operators. Auxiliary operators are not required lo know this infomation. Question not modified.
X S New.
X S INew. II X II X S INew. II New. Question is not discriminatory for an SRO. All of the plant conditions are nonessential. Once the operator knows a Site Area Emergency has been declared, all the remaining items are not X
necessary. The question is not a Higher skill. but memorized. Question replaced, new K/A selected - unable to write a question with this combination event and generic WA.
New. Attempt to replace distractor c. implausible. Correct the stem to include a reason that the action is being taken (since the distractors X E already provide the reason.) Distractor c. was accepted as is. stem was modified,
ES-401 Written Examination Form ES-401-9 R p V i p W t
.OK FIH)
I
~
H I LOD (1-5) 3 I
Cues TIF Ro UIEIS nly x S Bank.
Explanation New. 1) The question does not match the WA. The WA requires H 2 x U knowledge of which events are reported to outside agencies. The question deals with whenlwho gets the report. Queslion was moditied New. Doesn't match WA. Distradors a., b.. and c. are not plausible.
H 2 x et S Reviewed distractors with the utility, distractors determined to be plausible as written. No changes made.
H 3 New. Distractom c. and d. are implausible. Because power is c3G%
H 2 x et S where auto trips occur, distractors c. and d. bemme implausible. No changes made to question.
F 2 x S New.
New. Used an 'all of the above" format. Change distrador format.
F 2 x E Added more distraclor info, resulting in removal of 'all of the above" format.
New. Material is not required to be known from memory. A station H 3 objective requires this material be known from memory. No change made to the ouestion.
H H
2 2.5 x
x I S
S Bank.
INew.
I II Bank. Doesn't match WA. The WA refers to causeleffed between fuel handling and shutdown monitor. The question refers to nuclear F 2 X et instrumentation. Changed WA, lhe question was retained. The exam author believed the Shutdown Monitor referred to nuclear instruments.
New. No analysis is reauired. Knowinq that any Adion Level 3 requires H 2 x u a reanor sn-taown makes ~ n i sa s mp; memo, question Station agreed Cognrlwe level changed lo fundamenral U